Home / Browse projects / Pune, Maharashtra / Pelican Phase C

Registered No litigation declared Residential / Group Housing project

Pelican Phase C

By Laukik Construction Company

RG-MH-27491 · RERA P52100033925 · Last updated on MahaRERA portal: 14 Aug 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2028Possession promisedmoved 24 months from the original
2 of 11Construction stages donefurthest along: Stilt Floor, 80%
3 of 175Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Pelican Phase C is a Residential / Group Housing project by Laukik Construction Company in Pune, Maharashtra, registered with MahaRERA as P52100033925 on 14 Mar 2022. Possession is promised by 28 Feb 2028. The completion date has moved by 24 months from the original filing. 172 of the 175 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NamePelican Phase C
  • TypeResidential / Group Housing
  • Location
    • Paud Road
    • Ambadvet
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033925
  • ReraGenie IDRG-MH-27491

Builder

  • NameLaukik Construction Company
  • Entity typePartnership
  • PartnersSachin Pandharinath Jagtap, Rahul Pandharinath Jagtap
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredMar 2022First promiseFeb 2026Revised toFeb 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2022
  • Promised completion28 Feb 2028
  • Revised completionRevised to 28 Feb 2028 (originally 28 Feb 2026)
  • Buildings1 building record
  • Documents filed63 files

Current status

98%172 of 175 units booked
82.7%Work done, per cost certificate

Figures as on 14 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ANA13111750175

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.

Tower A: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)40%
Podiums (if any)40%
Plinth100%
Stilt Floor80%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes25%
Street LightingYes70%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed141

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots141
Closed/Covered20
Open Space121

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,966 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Oct 2025
LandownerVillageDistrict
Laukik Infrastructure CompanyPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI15634.75
Proposed, not sanctioned9,635 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMayur Colony Kothrud Pune
Estimated costRs 39.87 cr
Cost incurredRs 32.95 cr
Work done82.65%
BuildingWingEstimatedIncurred
Tower ANARs 34.06 crRs 27.71 cr
-NARs 5.81 crRs 5.24 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChinmay Bhise Architects
ArchitectChinmay Bhise
EngineerSandip Rangdal & Asso
Chartered AccountantS K Kulkarni & Associates LLP
Chartered AccountantG R SHENDYE & CO LLP
PartnerRole in project
Laukik Construction Company-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02072501909Feb 2026 → Feb 2028

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC005000000310574ABHIJEET VIVEK LOHARPELICAN PHASE C07/03/2024
CC12400421Laukik Construction CompanyBhayashree Abhijit Lohar Abhijeet Vivek Lohar16/10/2024
CC12600074Kamal Kumar VastrakarLaukik Construction Company05/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Feb 2028

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q4 Form 1 Pelican.pdf14 Aug 2026
Withdrawal Update Form 2File: Q4 Form 2 Pelican.pdf14 Aug 2026
Withdrawal Update Form 3File: Q4 Form 3 Pelican.pdf14 Aug 2026
Withdrawal Update Form 1File: 1 Form 1 Pelican Q3.pdf27 Apr 2026
Withdrawal Update Form 2File: 2 Form 2 Pelican Q3.pdf27 Apr 2026
Withdrawal Update Form 3File: 3 Form 3 Pelican Q3 c.pdf27 Apr 2026
Withdrawal Update Form 1File: 1 Architect Form 1.pdf24 Apr 2026
Withdrawal Update Form 2File: 2 Engineer Form 2.pdf24 Apr 2026
Withdrawal Update Form 3File: 3 CA Form3.pdf24 Apr 2026
Withdrawal Update Form 1File: 2 Architect Certificate date 30-06-2026 (2).pdf20 Apr 2026
Withdrawal Update Form 1File: 2 Architect Certificate date 30-06-2026 (2).pdf20 Apr 2026
Withdrawal Update Form 2File: Certificates of Engineers.pdf20 Apr 2026
Withdrawal Update Form 2File: 1 Form 2 Q1 Pelican.pdf20 Apr 2026
Withdrawal Update Form 3File: 3 C A Certificate (1).pdf20 Apr 2026
Withdrawal Update Form 3File: 3 C A Certificate (1).pdf20 Apr 2026
Form 1File: Form 1 March'25.pdf2 Jul 2025
Form 2File: Form 2 March 2025.pdf2 Jul 2025
Form 3File: Form 3 Mar 2025_compressed.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29.pdf2 Jul 2025
Layout approvalFile: Compress File-Sanction Plan 1-Tower A.pdf8 Mar 2025
Building plan approvalFile: 6_compressed.pdf8 Mar 2025
Copy of Layout Approval (in case of layout)File: Compress File-Sanction Plan 1-Tower A.pdf8 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-Dtd 27-02-2025.pdf8 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 6_compressed.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Tower A -LCC-31 DEC 2024.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Laukik Construction Co Form 3_compressed.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate-Dtd-31-12-2024.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: LCC_RERA FORM 5.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower A-Certificate for RERA (1).pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 Sept 24.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Tower A-Engineers Certificate-Sep 2024.pdf16 Oct 2024
Details of encumbrancesFile: Encumbrance Letter-Tower A.pdf3 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5-LCC-Dtd-14-03-2024.pdf14 Mar 2024
Details of encumbrances concerned to FinanceFile: Rera - Self Declaration.pdf8 Mar 2024
Details of encumbrancesFile: Details of Encumbrance.pdf8 Mar 2024
Details of encumbrances concerned to LegalFile: Rera - Self Declaration.pdf8 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Annexure B-Engineers Certificate-LCC-31-Dec-2023.pdf8 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf8 Mar 2024
Proforma of Agreement for saleFile: agreement draft.pdf8 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Details.pdf8 Mar 2024
Deviation Report with respect to Allotment letterFile: agreement draft.pdf8 Mar 2024
Deviation Report with respect to model copy of AgreementFile: agreement draft.pdf8 Mar 2024
Details of encumbrancesFile: Tower A-ABFL -Self Declaration.pdf16 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificates of Architect.pdf16 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Certificates of Engineers.pdf16 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Certificates of CA.pdf16 May 2023
Copy of the legal title reportFile: Search Title Report.pdf8 Mar 2022
Layout approvalFile: Layout Approval.pdf17 Feb 2022
Building plan approvalFile: Building Plan Approval.pdf17 Feb 2022
Building plan approvalFile: Building Plan Approval (2).pdf17 Feb 2022
Building plan approvalFile: Building Plan Approval (3).pdf17 Feb 2022
PAN CardFile: PAN Card.pdf17 Feb 2022
Details of encumbrancesFile: Details of encumbrances.pdf17 Feb 2022
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf17 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf17 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval (2).pdf17 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval (3).pdf17 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf17 Feb 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf17 Feb 2022
Declaration in FORM BFile: Declaration in FORM B.pdf17 Feb 2022
CERSAI detailsFile: CERSAI details.pdf17 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf17 Feb 2022
Proforma of Allotment letterFile: Agreement Draft.pdf17 Feb 2022

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pelican Phase C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambadvet13,700+ in Pune

2 kmPelican Phase CCompleted 3Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: Laukik Construction Company

Laukik Construction Company has 2 registrations on MahaRERA, including Pelican Phase B and Pelican Phase C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Pelican Phase C is delayed beyond 28 Feb 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pelican Phase C?

The registered promoter entity is Laukik Construction Company, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pelican Phase C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Pelican Phase C?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Pelican Phase C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pelican Phase C?

The professionals named in the filing: Architect: Chinmay Bhise Architects; Architect: Chinmay Bhise; Engineer: Sandip Rangdal & Asso; Chartered Accountant: S K Kulkarni & Associates LLP; Chartered Accountant: G R SHENDYE & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pelican Phase C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pelican Phase C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pelican Phase C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.