Home / Browse projects / Nagpur, Maharashtra / PAWANSUT HEIGHTS

Registered No litigation declared Others project

PAWANSUT HEIGHTS

By INR DEVELOPERS PRIVATE LIMITED

RG-MH-18907 · RERA P50500077857 · Last updated on MahaRERA portal: 7 Sep 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 90%
5 of 8Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

PAWANSUT HEIGHTS is a Others project by INR DEVELOPERS PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500077857 on 7 Nov 2024. Possession is promised by 31 Dec 2026. 3 of the 8 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePAWANSUT HEIGHTS
  • TypeOthers
  • Location
    • -
    • Ramdaspeth
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440010
  • Pincode440010
  • RERA no.P50500077857
  • ReraGenie IDRG-MH-18907

Builder

  • NameINR DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsSHRI SACHIN ARJUNLAL PUNIYANI, MRS MANISHA SACHIN PUNIYANI, ARJUNLAL RAMDATTA PUNIYANI

Key dates

this monthRegisteredNov 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

38%3 of 8 units booked
98.8%Work done, per cost certificate

Figures as on 7 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PAWANSUT HEIGHTSNA87628

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

PAWANSUT HEIGHTS: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 7 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered15
Open Space16

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area669 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Sep 2026

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI2101.23
Proposed, not sanctioned2,101 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Akarshan Busiplex, 26, Central Bazaar Road, Ramdaspeth, Nagpur Maharashtra.440010
Estimated costRs 9.73 cr
Cost incurredRs 9.61 cr
Work done98.78%
BuildingWingEstimatedIncurred
PAWANSUT HEIGHTSNARs 9.73 crRs 9.61 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectParag Bhaiyaji Ghubade
EngineerNITISH SHIRISH TAKALKAR
Chartered AccountantNageshwar Wasudeo Tidke
Chartered AccountantLOKESH CHANDULAL RAI
PartnerRole in project
INR DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500138Mrinal KatkarINR DEVELOPERS PRIVATE LIMITED22/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: form 2a.pdf7 Sep 2026
Withdrawal Update Form 1File: Form 1 June qpr.pdf2 Sep 2026
Withdrawal Update Form 1File: Form 1 June qpr.pdf2 Sep 2026
Withdrawal Update Form 1File: Form 1 June qpr.pdf2 Sep 2026
Withdrawal Update Form 2File: Form 2 June qpr.pdf2 Sep 2026
Withdrawal Update Form 2File: Form 2 June qpr.pdf2 Sep 2026
Withdrawal Update Form 2File: Form 2 June qpr.pdf2 Sep 2026
Withdrawal Update Form 3File: Form 3_ Pawansuth heights.pdf2 Sep 2026
Withdrawal Update Form 3File: pawansuth.pdf2 Sep 2026
Withdrawal Update Form 3File: pawansuth.pdf2 Sep 2026
Withdrawal Update Form 1File: Form 1 _ pawan suth heights _december q.pdf29 Jun 2026
Withdrawal Update Form 2File: Form 2 _ pawan suth heights _december q.pdf29 Jun 2026
Withdrawal Update Form 3File: Form 3_ Pawansuth heights.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1 _ pawan suth heights _december q.pdf7 Feb 2026
Withdrawal Update Form 1File: Form 1 _ pawan suth heights _december q.pdf7 Feb 2026
Withdrawal Update Form 2File: Form 2 _ pawan suth heights _december q.pdf7 Feb 2026
Withdrawal Update Form 2File: Form 2 _ pawan suth heights _december q.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3_ Pawansuth heights.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3_ Pawansuth heights.pdf7 Feb 2026
Form 5 (FY 2024-2025)File: Form-5 FY 2024-25.pdf30 Dec 2025
Form 2A (FY 2024-2025)File: form 2a pawansuth.pdf9 Nov 2025
Withdrawal Update Form 1File: form 1 pawansuth.pdf30 Oct 2025
Withdrawal Update Form 2File: form b parswanth.pdf30 Oct 2025
Withdrawal Update Form 3File: form 3 pawansuth.pdf30 Oct 2025
Withdrawal Update Form 1File: form 1 pawan.pdf9 Aug 2025
Withdrawal Update Form 2File: FORM 2 Pawan .pdf9 Aug 2025
Withdrawal Update Form 3File: FORM 3 PAWAN.pdf9 Aug 2025
Form 1File: Form 1.pdf21 Jun 2025
Form 2File: Form 2.pdf21 Jun 2025
Form 3File: Form 3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: List of sold invesntores.pdf21 Jun 2025
Self-declaration of Quarterly ProgressFile: Self declaration_QPR.pdf21 Jun 2025
Withdrawal Update Form 1File: puniyani form 1.pdf21 Jun 2025
Withdrawal Update Form 2File: form 2 puniyani.pdf21 Jun 2025
Withdrawal Update Form 3File: form 3 puniyani.pdf21 Jun 2025
Form 127 May 2025
Form 227 May 2025
Form 3File: Form 3.pdf27 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 pawansuth.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 pawansuth heights.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate (LH) Jan 2025 signed.pdf19 Jan 2025
Layout approvalFile: plan 2.pdf29 Oct 2024
Layout approvalFile: plat area pawansut.pdf29 Oct 2024
Copy of Layout Approval (in case of layout)File: plat area pawansut.pdf29 Oct 2024
Copy of Layout Approval (in case of layout)File: plan 2.pdf29 Oct 2024
Other - FinanceFile: MAHARERA PDF.pdf29 Oct 2024
Other - FinanceFile: diclaration of cost.pdf28 Oct 2024
Building plan approvalFile: Pawansut Heights 1_compressed-2.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 2 INR .pdf23 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Pawansut Heights 1_compressed-2.pdf23 Oct 2024
Other - LegalFile: sale deed.pdf23 Oct 2024
Other - LegalFile: consent documents.pdf23 Oct 2024
Other - TechnicalFile: declaration of plot.pdf23 Oct 2024
Other - TechnicalFile: partition deed.pdf23 Oct 2024
Other - TechnicalFile: consent documents.pdf23 Oct 2024
Other - TechnicalFile: sale deed.pdf23 Oct 2024
Other - TechnicalFile: order50.pdf16 Oct 2024
Layout approvalFile: Pawansut Heights_compressed.pdf15 Oct 2024
Layout approvalFile: Pawansut Heights 1_compressed.pdf15 Oct 2024
Copy of Layout Approval (in case of layout)File: Pawansut Heights 1_compressed.pdf15 Oct 2024
Copy of Layout Approval (in case of layout)File: Pawansut Heights_compressed.pdf15 Oct 2024
Other - TechnicalFile: cc mail.pdf15 Oct 2024
Proforma of Allotment letterFile: allotment letter.pdf10 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: format A Bank.pdf10 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: disclosure of loans.pdf10 Oct 2024
Other - LegalFile: Partion dead Document.pdf9 Oct 2024
Proforma of Agreement for saleFile: agreement of sale INR.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER.pdf8 Oct 2024
CERSAI detailsFile: CERSAI Search Report.pdf30 Jul 2024
Copy of the legal title reportFile: 2 legal search report.pdf10 Jul 2024
Details of encumbrances concerned to FinanceFile: 3 Encumbrance Finance.pdf10 Jul 2024
Details of encumbrances concerned to FinanceFile: 4 Encumbrance Legal.pdf10 Jul 2024
Declaration in FORM BFile: 11 Form B.pdf10 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: 7 Building Permit.pdf10 Jul 2024
Declaration about Commencement CertificateFile: 9 Commencement Certificate Declaration.pdf10 Jul 2024
Deviation Report with respect to Allotment letterFile: 42 Declaration WRT ATS and ATL.pdf10 Jul 2024
Details of encumbrances concerned to LegalFile: 3 Encumbrance Finance.pdf10 Jul 2024
Details of encumbrances concerned to LegalFile: 4 Encumbrance Legal.pdf10 Jul 2024
Deviation Report with respect to model copy of AgreementFile: 42 Declaration WRT ATS and ATL.pdf10 Jul 2024

How this compares with Nagpur

38%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PAWANSUT HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ramdaspeth2,800+ in Nagpur

Builder: INR DEVELOPERS PRIVATE LIMITED

INR DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including PAWANSUT HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if PAWANSUT HEIGHTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PAWANSUT HEIGHTS?

The registered promoter entity is INR DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PAWANSUT HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PAWANSUT HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PAWANSUT HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PAWANSUT HEIGHTS?

The professionals named in the filing: Architect: Parag Bhaiyaji Ghubade; Engineer: NITISH SHIRISH TAKALKAR; Chartered Accountant: Nageshwar Wasudeo Tidke; Chartered Accountant: LOKESH CHANDULAL RAI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PAWANSUT HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PAWANSUT HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PAWANSUT HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.