Home / Browse projects / Palghar, Maharashtra / PATIL ARCADE

Registered No litigation declared Others project

PATIL ARCADE

By SHIV SAI REALTORS

RG-MH-94658 · RERA P99000048843 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 12 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 90%
37 of 61Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

PATIL ARCADE is a Others project by SHIV SAI REALTORS in Palghar, Maharashtra, registered with MahaRERA as P99000048843 on 24 Jan 2023. Possession is promised by 31 May 2027. The completion date has moved by 12 months from the original filing. 24 of the 61 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NamePATIL ARCADE
  • TypeOthers
  • Location
    • SAMEL
    • VASAI
    • Vasai-Virar City (M Corp)
    • Palghar
    • 401203
  • Pincode401203
  • RERA no.P99000048843
  • ReraGenie IDRG-MH-94658

Builder

  • NameSHIV SAI REALTORS
  • Entity typePartnership
  • PartnersHEMANT ANAND PATIL, ANANT GOVIND PATIL, VISHNU GOVIND PATIL, VISHWANATH GOVIND PATIL, VASANTI ANAND PATIL

Key dates

this monthRegisteredJan 2023First promiseMay 2026Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2023
  • Promised completion31 May 2027
  • Revised completionRevised to 31 May 2027 (originally 31 May 2026)
  • Buildings1 building record
  • Documents filed94 files

Current status

39%24 of 61 units booked
68.7%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PATIL ARCADENA66451661

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

PATIL ARCADE: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes90%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Open Space66

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,016 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Dec 2025
LandownerVillageDistrict
HARESHWAR GOVIND PATILVasai-Virar City (M Corp)Palghar
PRAKASH VASUDEV PATILVasai-Virar City (M Corp)Palghar
BHARTI KASHINATH RAUTVadgharPalghar
KALPANA VISHWANATH PATILVasai-Virar City (M Corp)Palghar
NILIMA ARUN MHATREVasai-Virar City (M Corp)Palghar
KUNAL PURUSHOTTAM PATILVasai-Virar City (M Corp)Palghar
VAISHALI MAHESH PATILVasai-Virar City (M Corp)Palghar
AMIT PURUSHOTTAM PATILVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityvasai virar city municiple corporation
Permissible FSI2999.17
Proposed, not sanctioned2,999 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1,4,5,6 ANAND VATIKA, SNO 6,CTS N 355, SIDDHARTH NAGAR, SV ROAD, GOREGOAN WEST
Estimated costRs 9.31 cr
Cost incurredRs 6.40 cr
Work done68.72%
BuildingWingEstimatedIncurred
PATIL ARCADENARs 9.11 crRs 6.40 cr
-NARs 20.65 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectURBANSCAPES
EngineerPRAGNESH OZA
Chartered AccountantHARESH MEHTA AND ASSOCIATES
Chartered AccountantSTR AND ASSOCIATES
PartnerRole in project
SHIV SAI REALTORS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA05062621244May 2026 → May 2027

Reason as filed by the promoterRespected Sir/Madam, We are writing to request an extension for our project completion date to 31-05-2027. Over the past few months, a severe market slowdown has deeply affected our sales and cash flow. At the same time, a sudden, heavy rise in the cost of raw materials like steel and cement has made procurement difficult, which naturally slowed down our daily construction pace. We assure the Authority that we have a clear, robust plan in place to complete all remaining balance works and secure the final Occupancy Certificate (OC) for the entire project well within this revised timeline.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2A FY_2024-25.pdf30 Jun 2026
Form 2A (FY 2025-2026)File: FORM 2A FY_2025-26.pdf30 Jun 2026
Withdrawal Update Form 1File: FORM 1 - MAR 2026.pdf23 May 2026
Withdrawal Update Form 2File: FORM 2 - MAR 2026.pdf23 May 2026
Withdrawal Update Form 3File: FORM 3_PATIL ARCADE_MAR 2026-SIGNED.pdf23 May 2026
Withdrawal Update Form 1File: FORM 1 - DEC 2025.pdf20 Mar 2026
Withdrawal Update Form 2File: FORM 2 - DEC 2025.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM 3_PATIL ARCADE_DEC 2025-SIGNED.pdf20 Mar 2026
Form 1File: FORM 1 - SEP 2025.pdf20 Nov 2025
Form 2File: FORM 2 - SEP 2025.pdf20 Nov 2025
Form 3File: FORM 3_PATIL ARCADE _SEP 25-SIGNED.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY - SEP 2025.pdf20 Nov 2025
Form 1File: FORM 1.pdf3 Sep 2025
Form 2File: FORM 2.pdf3 Sep 2025
Form 3File: Form 3_PATIL ARCADE _JUNE 25 - SIGNED.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY.pdf3 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 QE DEC 2024.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Qtr 3-SIGNED_compressed.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 QE DEC 2024.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory as on 31 12 2024.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_PATILARCADE_2024.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED - converted.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED - converted.pdf16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - converted.pdf15 Nov 2024
Disclosure of sold/ booked inventoryFile: 20241027180152.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED_PATIL ARCADE_JUNE 24 - converted.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (19-4-2024) SAME 31.pdf1 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-Q4 SIGNED(1)-PATIL ARCADE.pdf1 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-Patil Arcade - March 23 (1).pdf5 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PATIL ARCADE MARCH 2024.pdf5 May 2024
Layout approvalFile: scan 1 HL.pdf8 Apr 2024
Copy of Layout Approval (in case of layout)File: scan 1 HL.pdf8 Apr 2024
Other - TechnicalFile: CC VERIFICATION MAIL.pdf8 Mar 2024
Building plan approvalFile: scan 1 HL.pdf13 Feb 2024
Building plan approvalFile: scan 2.pdf13 Feb 2024
Building plan approvalFile: scan 3 - converted.pdf13 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: scan 1 HL.pdf13 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: scan 2.pdf13 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: scan 3 - converted.pdf13 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC Samel 31 HL - converted.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-DEC 2023(REVISED) - converted.pdf13 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION - FORMAT A.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SAMEL 31-12- 23 .pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SAMEL 31-12- 23 .pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 revised.pdf1 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Scan Form 5 signed_Patilarcade.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold as on 30 sep 23.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf1 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf1 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 30june23.pdf1 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNATUE.pdf1 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_MAR 23 opt.pdf18 Apr 2023
Disclosure of sold/ booked inventoryFile: DETAILS OF SOLD UNSOLD_MAR 23.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_MAR 23_SIGNED OPT.pdf15 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A_ANANT GP.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A_HEMANT AP.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A_VASANTI GP.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A_VISHNU GP.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A_VISHWNATH G P.pdf20 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report_,MSL and LOA.pdf17 Jan 2023
Proforma of Agreement for saleFile: Revised Model Sale Agmt_SSR_1.pdf9 Jan 2023
Proforma of Agreement for saleFile: Revised Model Sale Agmt_SSR_2.pdf9 Jan 2023
Proforma of Agreement for saleFile: Revised Model Sale Agmt_SSR_3.pdf9 Jan 2023
Proforma of Agreement for saleFile: Revised Model Sale Agmt_SSR_4.pdf9 Jan 2023
Proforma of Allotment letterFile: MODEL AL REVISED.pdf13 Dec 2022
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT AL REVISED.pdf13 Dec 2022
Building plan approvalFile: LAYOUT 1 OF 3 OPT.pdf7 Dec 2022
Building plan approvalFile: LAYOUT 2 OF 3 OPT.pdf7 Dec 2022
Building plan approvalFile: LAYOUT 3 OF 3 OPT.pdf7 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT 1 OF 3 OPT.pdf7 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT 2 OF 3 OPT.pdf7 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT 3 OF 3 OPT.pdf7 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT_PATILARCADE_OPT1.pdf19 Nov 2022

How this compares with Palghar

39%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 12 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PATIL ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI3,200+ in Palghar

Builder: SHIV SAI REALTORS

SHIV SAI REALTORS has 1 registration on MahaRERA, including PATIL ARCADE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if PATIL ARCADE is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PATIL ARCADE?

The registered promoter entity is SHIV SAI REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PATIL ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PATIL ARCADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PATIL ARCADE?

The professionals named in the filing: Architect: URBANSCAPES; Engineer: PRAGNESH OZA; Chartered Accountant: HARESH MEHTA AND ASSOCIATES; Chartered Accountant: STR AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PATIL ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PATIL ARCADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PATIL ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.