PARVATI PRIDE

By VEDANT DEVELOPERS

RG-MH-52693 · RERA P52900016208 · Last updated on MahaRERA portal: 19 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 23 months past the filed date
  • Completion date moved by 42 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Nov 2024Possession promised23 months past this date
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

PARVATI PRIDE is a Residential / Group Housing project by VEDANT DEVELOPERS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900016208 on 24 Apr 2018. Possession was promised by 28 Nov 2024 and is now 23 months past that date. The completion date has moved by 42 months from the original filing.

At a glance

Project

  • NamePARVATI PRIDE
  • TypeResidential / Group Housing
  • Location
    • PATRADEVI ROAD
    • BANDA
    • Banda (CT)
    • Sawantwadi
    • Sindhudurg
    • 416511
  • Pincode416511
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900016208
  • ReraGenie IDRG-MH-52693

Builder

  • NameVEDANT DEVELOPERS
  • Entity typePartnership
  • PartnerSHRUTI DEWOO GAWDE
  • Other registrations9 more →
  • Completed4 of 10
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

23 months past promisethis monthRegisteredApr 2018First promiseMay 2021Revised toNov 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Apr 2018
  • Promised completion28 Nov 2024
  • Revised completionRevised to 28 Nov 2024 (originally 28 May 2021)
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARVATI PRIDENA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

PARVATI PRIDE: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 19 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes85%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes85%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes85%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes85%

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered1
Open Space4

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area830 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VEDANT DEVELOPERSBadlapur (M Cl)Thane

Approvals and building plan

Permissible FSI656.78
Proposed, not sanctioned520 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANDA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN VILAS SAHANE
EngineerMANGESH SHANKAR DEORUKHAKAR
Chartered AccountantPRADEEP NIKHIL & ASSOCIATES
PartnerRole in project
VEDANT DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900018021May 2021 → Nov 2024

Reason as filed by the promoterREVISED APPROVAL FROM TOWN PLANING AUTHORITY ,SINDUDURGA PENDING .

EXT52900009572May 2021 → May 2022

Reason as filed by the promoterLOCKDOWN

EXT52900012839May 2021 → Nov 2023

Reason as filed by the promoterVarious Reasons such as Weather, Equipment Failures, Labour Shortages and for Some Extra Work.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Feb 2025

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: OC - VEDANT DEVELOPERS.pdf19 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - VEDANT DEVELOPERS.pdf19 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Adobe Scan 5 Nov 2024 (1).pdf6 Dec 2024
Declaration in FORM BFile: affidavit (1)_compressed (1).pdf25 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1 JAN2023.pdf25 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1 APR 2023.pdf25 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1 JUL 2023.pdf25 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1 OCT 2023.pdf25 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG FORM 2 DT 7-1-2023.pdf25 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG FORM 2 DT 7-4-2023.pdf25 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG FORM 2 DT 7-7-2023.pdf25 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG FORM 2 DT 7-10-2023.pdf25 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENG FORM 2 A DT 7-1-2023.pdf25 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENG FORM 2 A DT 7-4-2023.pdf25 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENG FORM 2A DT 7-7-2023.pdf25 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENG FORM 2A DT 7-10-2023.pdf25 Nov 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf25 Nov 2023
Certificates of CA (Form 3)File: CA FORM 3 Q- 3_compressed.pdf25 Nov 2023
Certificates of CA (Form 3)File: CA FORM 3 Q-4_compressed.pdf25 Nov 2023
Certificates of CA (Form 3)File: CA FORM 3 Q-1_compressed.pdf25 Nov 2023
Certificates of CA (Form 3)File: CA FORM 3 Q-2_compressed.pdf25 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 (1).pdf25 Nov 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter 1.pdf23 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter 2.pdf23 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter 3.pdf23 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter 4.pdf23 Mar 2023
Deviation Report with respect to Allotment letterFile: Allotment letter.pdf21 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Allotment letter.pdf21 Feb 2023
Deviation Report with respect to model copy of AgreementFile: model copy of Agreement 2.pdf21 Feb 2023
Deviation Report with respect to model copy of AgreementFile: model copy of Agreement 3.pdf21 Feb 2023
Deviation Report with respect to model copy of AgreementFile: model copy of Agreement 4.pdf21 Feb 2023
Deviation Report with respect to model copy of AgreementFile: model copy of Agreement 5.pdf21 Feb 2023
Deviation Report with respect to model copy of AgreementFile: model copy of Agreement 6.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021-2022.pdf18 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A Disclosure of Intrest in Other RERA - VEDANT.pdf18 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account.pdf21 Nov 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal_co.pdf18 Nov 2022
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal_co.pdf18 Nov 2022
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate Format D.pdf18 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate on Quality Assurance (Form 2A FY 2021-22).pdf16 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200252314331_For_Asset_Based_Search_16_11_2022_12_17_25_773.pdf16 Nov 2022
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf16 Nov 2022
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf16 Nov 2022
Proforma of Agreement for saleFile: 2 Proforma of Agreement for sale.pdf16 Nov 2022
Proforma of Agreement for saleFile: 3 Proforma of Agreement for sale.pdf16 Nov 2022
Proforma of Agreement for saleFile: 4 Proforma of Agreement for sale.pdf16 Nov 2022
Proforma of Agreement for saleFile: 5 Proforma of Agreement for sale.pdf16 Nov 2022
Building plan approvalFile: myscan-20221004-0004-min_Compressed_compressed.pdf6 Oct 2022
Building Plan Approval (IOD)File: myscan-20221004-0004-min_Compressed_compressed.pdf6 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: Grampanchayat NOC.pdf6 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGINEERS Q A 2019.pdf31 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Annual Report CA 2020-21.pdf31 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Annual Report CA 2018-19.pdf31 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annual Report CA 2018-19.pdf31 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Annual Report CA 2019-20.pdf31 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Report CA 2020-21.pdf31 Dec 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf28 May 2021
Certificates of CA (Form 3)File: FORM-3-VEDANT DEVELOPERS150_compressed (1).pdf28 May 2021
Building plan approvalFile: APPROVED PLAN.pdf23 Dec 2020
Building Plan Approval (IOD)File: APPROVED PLAN.pdf23 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: order 1.pdf23 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: order 2.pdf23 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: order 3.pdf23 Dec 2020
Layout approvalFile: download.pdf12 Apr 2018
Copy of Layout Approval (in case of layout)File: download.pdf12 Apr 2018
Declaration in FORM BFile: affidavaite declaration letter-min.pdf12 Apr 2018
Copy of the legal title reportFile: title-1-min.pdf7 Apr 2018
Copy of the legal title reportFile: title-2-min.pdf7 Apr 2018
Copy of the legal title reportFile: title-3-min.pdf7 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE-min.pdf7 Apr 2018
Proforma of Allotment letterFile: AGREEMENT-2-min.pdf7 Apr 2018
Proforma of Allotment letterFile: AGREEMENT-3-min.pdf7 Apr 2018
Proforma of Allotment letterFile: AGREEMENT-4-min.pdf7 Apr 2018
Proforma of Allotment letterFile: AGREEMENT-1-min.pdf7 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rev MahaRERA Certificate-min.pdf5 Apr 2018
Building plan approvalFile: MYSCAN_20180311_0003-min.pdf4 Apr 2018
PAN CardFile: company pancard.pdf4 Apr 2018
Details of encumbrancesFile: declaration on letter head.pdf4 Apr 2018
Building Plan Approval (IOD)File: MYSCAN_20180311_0003-min.pdf4 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER-min.pdf4 Apr 2018

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one moved by 42 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is among them

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep PARVATI PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANDA530+ in Sindhudurg

Builder: VEDANT DEVELOPERS

VEDANT DEVELOPERS has 10 registrations on MahaRERA, including VRUNDAVAN PARK and HAMIDA HEIGHTS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What does it mean that PARVATI PRIDE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PARVATI PRIDE is delayed beyond 28 Nov 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARVATI PRIDE?

The registered promoter entity is VEDANT DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARVATI PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARVATI PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARVATI PRIDE?

The professionals named in the filing: Architect: SACHIN VILAS SAHANE; Engineer: MANGESH SHANKAR DEORUKHAKAR; Chartered Accountant: PRADEEP NIKHIL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARVATI PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARVATI PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARVATI PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.