Home / Browse projects / Thane, Maharashtra / PARTH LAKEFRONT

Completed No litigation declared Residential / Group Housing project

PARTH LAKEFRONT

By PARTH WORLD LLP

RG-MH-81647 · RERA P51700018725 · Last updated on MahaRERA portal: 24 Oct 2024

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
5Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

PARTH LAKEFRONT is a Residential / Group Housing project by PARTH WORLD LLP in Thane, Maharashtra, registered with MahaRERA as P51700018725 on 29 Nov 2018. The registration is recorded completed; possession was promised by 31 Dec 2022. 5 complaints are on record with the regulator.

At a glance

Project

  • NamePARTH LAKEFRONT
  • TypeResidential / Group Housing
  • Location
    • T T C INDUSTRIAL AREA
    • DIGHE
    • Navi Mumbai (M Corp.)
    • Thane
    • 400605
  • Pincode400605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700018725
  • ReraGenie IDRG-MH-81647

Builder

  • NamePARTH WORLD LLP
  • Entity typePartnership
  • LLPINAAH-8061
  • GSTIN27AATFP6133C2Z3
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnersParth Dharmendra Parikh, Dharmendra Mansukhlal Parikh
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2018PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Nov 2018
  • Promised completion31 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARTH LAKEFRONTNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

PARTH LAKEFRONT: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed166

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots166
Closed/Covered105
Open Space61

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,620 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Sep 2024
LandownerVillageDistrict
DHARMENDRA M PARIKHMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMaharashtra Industrial Development Corporation
Permissible FSI5400.0
Proposed, not sanctioned5,400 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSME BRANCH VASHI TURBHE DEVGIRI BANKING COMPLEX PHASE 2 SECTOR 19C VASHI TURBHE NAVI MUMBAI 400703

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
PARTH WORLD LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700003927Dec 2022 → Dec 2023

Reason as filed by the promoterWE HAVE RECEIVED ADDITIONAL 0.5 FSI COMMENCEMENT CERTIFICATE 10 TH APRIL 2019 SO WE WOULD LIKE TO CHANGE PROJECT COMPLETION DATE

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC006000000479948VIKAS NAMDEV WADAMM/S. PARTH WORLD LLP04/04/2024
CC12500724Sadhana JyotyPARTH WORLD LLP03/03/2025
CC12500419Prashant bhagesh PingalePARTH WORLD LLP08/02/2025
CC12500634GOPAL KRISHNAN IyerPARTH WORLD LLP23/02/2025
CC12501548Aparna MurthyPARTH WORLD LLP10/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Oct 2024

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: F 4 signed.pdf24 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf24 Oct 2024
Certificates of CA (Form 3)File: Form 3 - Parth Lakefront as on 05-07-2024.pdf20 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Parth Lakefront- as on 05th July 2024 .pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - PARTH LAKEFRONT as on June 2024.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of CA (Form 3)File: 8 Certificates of CA (Form 3).pdf20 Jul 2024
Certificates of CA (Form 3)File: Form 3 Digha 30062022 signed.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect form1digha30062022.pdf6 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4Architect Certificateform1 DIGHA 31122022.pdf6 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6Architect Certificateform1digha300623.pdf6 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7Architect Certificate-form1digha 300923.pdf6 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PARTH LAKE FRONT 310323.pdf5 Apr 2024
Certificates of CA (Form 3)File: Form 3- Digha - 31032023_compressed.pdf29 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 DIGHA 31032023.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DIGHA-form1- 311223.pdf1 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31 03 2020.pdf19 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 231032021.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A31032020.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A31032021.pdf19 Apr 2023
Certificates of CA (Form 3)File: FORM 3- 31032020 SIGNED.pdf18 Apr 2023
Certificates of CA (Form 3)File: FORM 3- 31032021 - SIGNED.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 - 31032020 - SIGNED.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 - 31032021 - SIGNED.pdf18 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 PARTHLAKE 21 22.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A PARTHLAKE 21 22.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A PARTHLAKE 21 22.pdf7 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC PARTH LAKE FRONT.pdf1 Mar 2023
Certificates of CA (Form 3)File: Form 3 Digha 30092022.pdf7 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificateform1digha msr22.pdf6 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form1digha sept22.pdf6 Dec 2022
Certificates of CA (Form 3)File: Form 3 Parth Lakefront 21-22.pdf6 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Parth Lakefront21-22.pdf6 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: plinth_completion Certificate.pdf15 Apr 2021
Proforma of Allotment letterFile: Deed of Assignment Parth Lakefront.pdf19 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: DEED OF ASSIGNMENT new .pdf26 Feb 2020
Proforma of Allotment letterFile: DEED OF ASSIGNMENT new .pdf26 Feb 2020
Proforma of Allotment letterFile: DEED OF ASSIGNMENT nnn.pdf10 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT cERTIFICATE FORM 1.pdf27 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: aRCHITECT FORM 1 - compressed 31032019.pdf27 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 ca certificate.pdf27 Dec 2019
Certificates of CA (Form 3)File: D:\Laptop backup\ujwala\LLP\rera\Rera - Digha\pdf\C A Certificate NN.pdf18 Dec 2019
OtherFile: D:\Laptop backup\ujwala\LLP\rera\Rera - Digha\pdf\AREA CERTIFICATE DIGHA 12042019.pdf18 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: CC new.pdf16 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate form 2-ilovepdf-compressed.pdf21 Jun 2019
Layout approvalFile: MYSCAN_20180926_0009-ilovepdf-compressed.pdf27 Nov 2018
Building plan approvalFile: MYSCAN_20180926_0006-ilovepdf-compressed.pdf27 Nov 2018
Building plan approvalFile: MYSCAN_20180926_0008-ilovepdf-compressed.pdf27 Nov 2018
Building plan approvalFile: MYSCAN_20180926_0009-ilovepdf-compressed.pdf27 Nov 2018
Building plan approvalFile: MYSCAN_20180926_0010-ilovepdf-compressed.pdf27 Nov 2018
PAN CardFile: Pan card Parth world LLP.pdf27 Nov 2018
Copy of the legal title reportFile: Search Report - DIGHA-II-ilovepdf-compressed.pdf27 Nov 2018
Details of encumbrancesFile: Declaration of no encumbrances.pdf27 Nov 2018
Copy of Layout Approval (in case of layout)File: MYSCAN_20180926_0009-ilovepdf-compressed.pdf27 Nov 2018
Building Plan Approval (IOD)File: MYSCAN_20180926_0006-ilovepdf-compressed.pdf27 Nov 2018
Building Plan Approval (IOD)File: MYSCAN_20180926_0008-ilovepdf-compressed.pdf27 Nov 2018
Building Plan Approval (IOD)File: MYSCAN_20180926_0009-ilovepdf-compressed.pdf27 Nov 2018
Building Plan Approval (IOD)File: MYSCAN_20180926_0010-ilovepdf-compressed.pdf27 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: cc digha-ilovepdf-compressed.pdf27 Nov 2018
Declaration in FORM BFile: FORM B Affidavit Cum Declaration-ilovepdf-compressed.pdf27 Nov 2018
Certificates of CA (Form 3)File: C A Certificate NN.pdf27 Nov 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER AS PER RERA ACT (3).pdf27 Nov 2018
Proforma of Allotment letterFile: DEED OF ASSIGNMENT.pdf27 Nov 2018
OtherFile: lease agreemnt 955 kb.pdf27 Nov 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PARTH MAGNUSPLOT NO 22 SECTOR 4 SANPADA NAVI MUMBAI46CompletedJul 2017Jul 2017
PARTH SOLITAIREPARTH SOLITAIRE PLOT NO 2 SECTOR 9E KALMBOLI NAVI MUMBAI68CompletedNov 2012Nov 2012

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARTH LAKEFRONT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DIGHE7,600+ in Thane

2 kmPARTH LAKEFRONTCompleted 14Lapsed / revoked 5Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: PARTH WORLD LLP

PARTH WORLD LLP has 2 registrations on MahaRERA, including PARTH LAKEFRONT and Parth Lakeview. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PARTH LAKEFRONT is delayed beyond 31 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARTH LAKEFRONT?

The registered promoter entity is PARTH WORLD LLP, a partnership as per the filing. Its LLPIN AAH-8061 and GSTIN 27AATFP6133C2Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARTH LAKEFRONT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PARTH LAKEFRONT?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PARTH LAKEFRONT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in PARTH LAKEFRONT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARTH LAKEFRONT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARTH LAKEFRONT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.