Completed No litigation declared Residential / Group Housing project

PARK WAY

By Om Sai Ganesh Builders & Developers Pvt Ltd

RG-MH-46392 · RERA P51900047931 · Last updated on MahaRERA portal: 31 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: .
Mar 2027Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Staircases, 95%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

PARK WAY is a Residential / Group Housing project by Om Sai Ganesh Builders & Developers Pvt Ltd in Matunga, 400019, registered with MahaRERA as P51900047931 on 1 Dec 2022. The registration is recorded completed; possession was promised by 31 Mar 2027.

At a glance

Project

  • NamePARK WAY
  • TypeResidential / Group Housing
  • Location
    • Bhalchandra Road
    • Matunga
    • Matunga
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900047931
  • ReraGenie IDRG-MH-46392

Builder

  • NameOm Sai Ganesh Builders & Developers Pvt Ltd
  • Entity typeCompany
  • CINU45200MH2004PTC148985
  • Directorsyash mutha, Anil Mutha

Key dates

this monthRegisteredDec 2022PromisedMar 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Dec 2022
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARK WAYNA310000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

PARK WAY: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 31 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed69

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots69
Closed/Covered69

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area923 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4863.07
Proposed, not sanctioned4,863 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNaupada, Thane

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB.N.SHAH & ASSOCIATES
ArchitectSharaddha Salvi
ArchitectGA Design
EngineerDeependra Korlekar
Chartered AccountantKALPESH H AGRAWAL AND CO.
Chartered AccountantRaj Jain & Associates
PartnerRole in project
Om Sai Ganesh Builders & Developers Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Occupation Certificate dated 300525.pdf31 May 2025
Disclosure of sold/ booked inventoryFile: Sold Details 310325- PW.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Park way Mar 25.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 25.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mar 25.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Dec 24.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Park way Dec 24.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24.pdf13 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank letter PW- RERA Accounts.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Park way Sep 24.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park Way- Form 3 Sep 24.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sep 24.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Details 300624- PW.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Details 300924- PW.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Way Form 1 June 24.pdf11 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park way Form 2 June 24.pdf11 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park Way- Form 3 June 24.pdf11 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24- Park Way.pdf14 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Supervisors Certificate FY 23-24 -Park Way.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: Park way Sold inventory 310324.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Park way Mar 24.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mar 24.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park Way- Form 3 Mar 24.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Park way Dec 23.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Dec 23.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Details 311223- PW.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park Way- Form 3 Dec 23.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 Sep 23.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 23 Park Way.pdf11 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Park way Sep 23.pdf6 Oct 2023
Disclosure of sold/ booked inventoryFile: Park way Sold inventory 30092023.pdf6 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 June 23.pdf15 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Om Sai Ganesh- Architect's Certificate.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 23 Park Way.pdf12 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Site Supervisors Certificate FY 22-23 -Park Way.pdf5 Jul 2023
Disclosure of sold/ booked inventoryFile: Park way Sold inventory 30062023.pdf5 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Om Sai Form-5.pdf5 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Om Sai Form-5.pdf30 May 2023
Declaration about Commencement CertificateFile: Declaration about commencemnt certificate Full CC.pdf10 May 2023
Commencement Certificates / NA Order for plotted developmentFile: 2376423_FurtherCC_signed.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Form 2 Mar 23.pdf26 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Site Supervisors Certificate FY 22-23 -Park Way.pdf26 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 23 Park Way.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Park way Mar 23.pdf11 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Details 310323- PW.pdf6 Apr 2023
Building plan approvalFile: park way Amended IOD letter.pdf30 Mar 2023
Building plan approvalFile: Revised plan pg 1.pdf30 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: park way Amended IOD letter.pdf30 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Revised plan pg 1.pdf30 Mar 2023
Proforma of Agreement for saleFile: AFS RERA.pdf19 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form -3 Registration.pdf8 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200249618758_For_Asset_Based_Search_14_10_2022_11_39_24_921.pdf14 Oct 2022
Copy of the legal title reportFile: Lamba Property RERA Title.pdf6 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation Report- Allottment letter.pdf6 Oct 2022
Proforma of Allotment letterFile: Allottment Letter.pdf30 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf30 Sep 2022
Layout approvalFile: BLock Plan.pdf19 Sep 2022
Copy of Layout Approval (in case of layout)File: BLock Plan.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 2341068_FirstCC_signed- Plinth CC.pdf19 Sep 2022
Declaration about Commencement CertificateFile: Commencement Declaration- Form - D-.pdf19 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects Certificate- Signed.pdf14 Sep 2022
Building plan approvalFile: IOD plan 1st page.pdf22 Aug 2022
Building plan approvalFile: IOD Letter.pdf22 Aug 2022
PAN CardFile: Self Certified PAN.pdf22 Aug 2022
Details of encumbrances concerned to FinanceFile: Declaration of No Encumbrances Related to Finance.pdf22 Aug 2022
Details of encumbrances concerned to LegalFile: Declaration of No Encumbrances.pdf22 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD plan 1st page.pdf22 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD Letter.pdf22 Aug 2022
Declaration in FORM BFile: Signed Form B.pdf22 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate RERA.pdf22 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA Bank Account Declaration.pdf22 Aug 2022

Keep PARK WAY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Matunga

2 kmPARK WAYCompleted 42Lapsed / revoked 19Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 85 registered projects within 2 km.

Builder: Om Sai Ganesh Builders & Developers Pvt Ltd

Om Sai Ganesh Builders & Developers Pvt Ltd has 1 registration on MahaRERA, including PARK WAY. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if PARK WAY is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARK WAY?

The registered promoter entity is Om Sai Ganesh Builders & Developers Pvt Ltd, a company as per the filing. Its CIN U45200MH2004PTC148985 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARK WAY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARK WAY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARK WAY?

The professionals named in the filing: Architect: B.N.SHAH & ASSOCIATES; Architect: Sharaddha Salvi; Architect: GA Design; Engineer: Deependra Korlekar; Chartered Accountant: KALPESH H AGRAWAL AND CO.; Chartered Accountant: Raj Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARK WAY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARK WAY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARK WAY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.