RG-MH-22948 · RERA P50500048974 · Last updated on MahaRERA portal: 31 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

PARK VIEW is a Residential / Group Housing project by METROCITY DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500048974 on 24 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NamePARK VIEW
  • TypeResidential / Group Housing
  • Location
    • MOUZA SHANKARPUR
    • SHANKARPUR
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440010
  • Pincode440010
  • RERA no.P50500048974
  • ReraGenie IDRG-MH-22948

Builder

  • NameMETROCITY DEVELOPERS
  • Entity typePartnership
  • PartnersPRASHANT MANOHARRAO BONGIRWAR, VISHAL VASANT GANDHEWAR, VEDANT PRASHANT BONGIRWAR, VRUSHALI PRASHANT BONGIRWAR
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2023PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jan 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARK VIEWNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

PARK VIEW: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 31 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Open Space15

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area545 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
PRASHANT BONGIRWARNagpur (M Corp.)Nagpur
VISHAL VASANT GANDHEWARNagpur (M Corp.)Nagpur
VRUSHALI PRASHANT BONGIRWARNagpur (M Corp.)Nagpur
VEDANT PRASHANT BONGIRWARSNagpur (M Corp.)Nagpur

Approvals and building plan

Permissible FSI1745.05
Proposed, not sanctioned1,745 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHANKAR NAGAR, NAGPUR

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH LAMGE
EngineerSUYOG DANGE
Chartered AccountantPAYAL TAORI
Chartered AccountantMJM Associates
Chartered AccountantKND & Associates
Chartered AccountantSaloni Bang and Associates
PartnerRole in project
METROCITY DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Mar 2025

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full development certificate_Form 4.pdf31 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_compressed.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_compressed.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: DSBI.pdf14 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf7 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf7 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form -5 Park View.pdf20 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form -5 Park View.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 July-Sep 2024_compressed.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: DSBI July-Sep 2024_compressed.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PARK VIEW FORM-2 30-9-2400_compressed.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July-Sep 2024_compressed.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Park View DSBI.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3_compressed.pdf6 Jun 2024
Disclosure of sold/ booked inventoryFile: DSBI Jan-Mar 24.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Park View_compressed.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 PARK VIEW_compressed.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 PARK VIEW_compressed.pdf1 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A PARK VIEW_compressed.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Decl_form 3.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A 1203 Form 1_compressed.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure-B 2208 Form 2_compressed.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE205.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 Jan to March.pdf5 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 April to June.pdf5 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 July to September.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form 2 Jan to March.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 April to June.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 July - September.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Uploaded dt 02-11-2023.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_26-9-23.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dt 20-11-2023.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 10-4-2023.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Park View_compressed.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 10-04_compressed.pdf9 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 10-07_compressed.pdf9 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 10-07.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 02_11_23.PDF9 Nov 2023
Disclosure of sold/ booked inventoryFile: DSBI 10_10_23.PDF26 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FOEM-5 PARK VIEW.pdf26 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A PARK VIEW.pdf4 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed form 3_compressed.pdf28 Sep 2023
Disclosure of sold/ booked inventoryFile: PARK VIEW 27_7_23.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park View ARCHITECTS CERTIFICATE 31-03-23,.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Park View.pdf21 Sep 2023
Disclosure of sold/ booked inventoryFile: PARK VIEW 31-3-23.pdf21 Sep 2023
Disclosure of sold/ booked inventoryFile: PARK VIEW 31-3-23.pdf21 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane_A_Vedant.pdf12 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane _A_Prashant.pdf12 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane_A_Vishal.pdf12 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane_A_Vrushali_compressed.pdf11 Jan 2023
Details of encumbrances concerned to FinanceFile: Nil Legal Encumberance.pdf9 Dec 2022
Details of encumbrances concerned to LegalFile: Nil Legal Encumberance.pdf9 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf9 Nov 2022
Proforma of Agreement for saleFile: AFS.pdf8 Nov 2022
Details of encumbrances concerned to FinanceFile: Nil Finance Encumberance.pdf4 Nov 2022
Details of encumbrances concerned to LegalFile: Nil Finance Encumberance.pdf4 Nov 2022
Declaration about Commencement CertificateFile: Format D.pdf4 Nov 2022
Deviation Report with respect to Allotment letterFile: No Deviation AL New.pdf4 Nov 2022
Deviation Report with respect to model copy of AgreementFile: No deviation AFS New.pdf4 Nov 2022
Copy of the legal title reportFile: Legal Title Report_RERA Format_compressed.pdf3 Nov 2022
Proforma of Allotment letterFile: Developers Letter of Allotment New_compressed.pdf22 Oct 2022
Layout approvalFile: Plan.pdf17 Sep 2022
Building plan approvalFile: Plan.pdf17 Sep 2022
Copy of Layout Approval (in case of layout)File: Plan.pdf17 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf17 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: NMRDA_compressed.pdf16 Sep 2022
Declaration in FORM BFile: Form B_compressed.pdf16 Sep 2022
CERSAI detailsFile: CERSAI_Search_Report_200246662934_For_Asset_Based_Search_08_09_2022_13_23_13_770.pdf16 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Sep 2022
PAN CardFile: Pan Card Firm.pdf15 Sep 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
PARK VIEWSHANKARPUR20OngoingDec 2024Dec 2024
METROCITY-1SHANKARPUR-CompletedFeb 2022Late, May 2022

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARK VIEW on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHANKARPUR2,800+ in Nagpur

Builder: METROCITY DEVELOPERS

METROCITY DEVELOPERS has 4 registrations on MahaRERA, including PARK VIEW and METROCITY VII. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if PARK VIEW is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARK VIEW?

The registered promoter entity is METROCITY DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARK VIEW?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARK VIEW?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARK VIEW?

The professionals named in the filing: Architect: UMESH LAMGE; Engineer: SUYOG DANGE; Chartered Accountant: PAYAL TAORI; Chartered Accountant: MJM Associates; Chartered Accountant: KND & Associates; Chartered Accountant: Saloni Bang and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARK VIEW?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARK VIEW. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARK VIEW to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.