Home / Browse projects / Nagpur, Maharashtra / Park Mansion 54

Registered No litigation declared Residential / Group Housing project

Park Mansion 54

By Luxora Infrastructure Private Limited

RG-MH-01701 · RERA P50500010626 · Last updated on MahaRERA portal: 7 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 105 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 105 months from the original
8 of 11Construction stages donefurthest along: Podiums (if any), 0%
0 of 1Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 160 documents Report an error

Park Mansion 54 is a Residential / Group Housing project by Luxora Infrastructure Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500010626 on 31 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 105 months from the original filing. 1 of the 1 unit on this registration is recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NamePark Mansion 54
  • TypeResidential / Group Housing
  • Location
    • Kharsoli Road
    • Mauza
    • Pipla
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500010626
  • ReraGenie IDRG-MH-01701

Builder

  • NameLuxora Infrastructure Private Limited
  • Entity typeCompany
  • CINU70100MH2007PTC166943
  • GSTIN27AABCL2854K2ZA
  • DirectorsDeepak Mahadeo Vasandani, Tarun Hundalani
  • Other registrations22 more →
  • Completed8 of 23
  • No longer live4 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseMar 2018Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Mar 2018)
  • Buildings1 building record
  • Documents filed160 files

Current status

100%1 of 1 units booked
93.8%Work done, per cost certificate

Figures as on 7 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Park Mansion 54NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Park Mansion 54: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes62%
Water SupplyYes35%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes67%
Storm Water DrainsYes67%
Landscaping & Tree PlantingYes80%
Street LightingYes10%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes37%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered1
Open Space1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area652 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jun 2025

Approvals and building plan

Sanctioning authorityJoint Director Town Planning/Collectors Office Nagpur
Permissible FSI316.05
Proposed, not sanctioned316 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGeeta Bldg, Pandita Ramabai Rd, Mumbai 400007
Estimated costRs 1.72 cr
Cost incurredRs 1.61 cr
Work done93.79%
BuildingWingEstimatedIncurred
Park Mansion 54NARs 1.57 crRs 1.54 cr
-NARs 14.12 lakhRs 7.31 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStudio Eleven
EngineerJeevan Ramkrishna Kute
Chartered AccountantJain Nirmal Kumar & Associates
Chartered AccountantNeha Joshi
PartnerRole in project
Luxora Infrastructure Private Limited-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500018214Mar 2018 → Jun 2024

Reason as filed by the promoterDue to the fact that a new 18 m wide DP road was proposed by NMC in the Regional Plan which directly affected the project after the start of its construction, construction of the project was delayed until clarifications and amendments were successfully received on the same.

EXT50500000745Mar 2018 → Jun 2023

Reason as filed by the promoterDue to the fact that a new 18m wide DP road was proposed by NMC in the Regional Plan which directly affected the project after the start of its construction, construction of the project was delayed until clarifications were successfully received on the same.

EXT50500025415Mar 2018 → Nov 2025

Reason as filed by the promoterThis is a single customized villa and due to design changes required by the customer, the sanction plans had to be revised and have been submitted for approval. Hence there is delay in completion of this project.

EA13052620950Mar 2018 → Dec 2026

Reason as filed by the promoterRespected Sir/Madam, We, LUXORA INFRASTRUCTURE PRIVATE LIMITED, Promoter of the real estate project “Park Mansion 54”, bearing MahaRERA Registration No. P50500010626, hereby submit this application seeking an extension up to 31/12/2026 for completion of the said project. We respectfully submit that the delay in completion of the project has occurred due to prolonged and cumulative circumstances beyond the control of the promoter. The project has been affected by delays in obtaining statutory approvals, revalidations, and permissions from competent authorities, along with a sustained slowdown i

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed160

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 160 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Arch_Cert_Upload_PM_54_Jun_26.pdf7 Aug 2026
Withdrawal Update Form 2File: Engg_Cert_Upload_PM 54_Jun_26.pdf7 Aug 2026
Withdrawal Update Form 3File: CA_Cert_Park Mansion 54_Jun_26.pdf7 Aug 2026
Withdrawal Update Form 1File: Arch_Cert_Upload_PM_54_Jun_26.pdf14 Jul 2026
Withdrawal Update Form 2File: Engg_Cert_Upload_PM 54_Jun_26.pdf14 Jul 2026
Withdrawal Update Form 3File: CA_Cert_Upload_Park Mansion 54_Mar_26.pdf14 Jul 2026
Form 5 (FY 2024-2025)File: Park Mansion 54_Form 5 (FY 24_25).pdf14 Jul 2026
Form 2A (FY 2025-2026)File: QA_Cert_Park Mansion 54_Mar_26.pdf11 Jun 2026
Withdrawal Update Form 1File: Arch_Cert_Upload_Park Mansion 54_Dec_25.pdf24 Jan 2026
Withdrawal Update Form 2File: Engg_Cert_Park Mansion 54_Dec_25.pdf24 Jan 2026
Withdrawal Update Form 3File: CA_Cert_Park Mansion 54_Dec_25.pdf24 Jan 2026
Withdrawal Update Form 1File: Arch_Cert_Park Mansion 54_Upload_Sep_25.pdf14 Nov 2025
Withdrawal Update Form 2File: Engg_Cert_Park Mansion 54_Upload_Sep_25.pdf14 Nov 2025
Withdrawal Update Form 3File: CA_Cert_Park Mansion 54_Sep_25.pdf14 Nov 2025
Withdrawal Update Form 1File: Arch_Cert_Park Mansion 54_Jun_25_Signed.pdf30 Jul 2025
Withdrawal Update Form 2File: Engg_Cert_Park Mansion 54_Jun_25_Signed.pdf30 Jul 2025
Withdrawal Update Form 3File: CA_Cert_Park Mansion 54_Jun_25.pdf30 Jul 2025
Form 2A (FY 2024-2025)File: QA_Cert_Park Mansion 54_Mar_25.pdf10 Jul 2025
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Mar_25.pdf6 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert_Park Mansion 54_Mar_2025.pdf15 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Park Mansion 54_Mar_25.pdf15 Apr 2025
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Dec_24.pdf3 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Park Mansion 54_Dec_24.pdf13 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Park Mansion 54_Dec_24.pdf13 Feb 2025
Declaration in FORM BFile: Form B_Park Mansion_54.pdf20 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA_Cert_Park Mansion 54_Mar_24.pdf6 Dec 2024
Certificates of CA (Form 3)File: CA_Cert_PARK MANSION 54_Sep_24.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Park Mansion 54_FORM 5 (FY 2023-24).pdf29 Nov 2024
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Jun_24.pdf16 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Park Mansion 54_Sep_24.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Park Mansion 54_Sep_24.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Park Mansion_54_Jun_24.pdf5 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Park Mansion 54_Jun_24.pdf5 Aug 2024
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Mar_24.pdf4 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Park Mansion 54_Mar_24.pdf27 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Park Mansion 54_Mar_24.pdf15 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: QA_Cert_Park Mansion 54_Mar_24.pdf15 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Park Mansion 54_Dec_23.pdf2 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG Park Manison 54_Dec_23.pdf2 Mar 2024
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54 Dec 2023.pdf2 Mar 2024
Declaration in FORM BFile: Form B_Extension_Park Mansion 54.pdf21 Dec 2023
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Sep_23.pdf20 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Park Mansion 54_Sep_23.pdf18 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Park Mansion 54_Jun_23.pdf18 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Park Mansion 54_Sep_23.pdf18 Dec 2023
Declaration about Commencement CertificateFile: Declaration about Commencement_Park Mansion_54.pdf13 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory_Park Mansion 54.pdf13 Dec 2023
CERSAI detailsFile: CERSAI_Park Mansion 54.pdf13 Dec 2023
Proforma of Agreement for saleFile: CERSAI_Park Mansion 54.pdf13 Dec 2023
Proforma of Agreement for saleFile: AFS_Rowhouse-FINAL_Park Mansion 54.pdf13 Dec 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance_Park Mansion 54.pdf11 Dec 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance_Park Mansion 54.pdf11 Dec 2023
Declaration about Commencement CertificateFile: Final Approval for Township from Collector.pdf11 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organisations_DV_Sep_23.pdf11 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organisations_TH_Sep_23.pdf11 Dec 2023
Proforma of Allotment letterFile: Declaration for Allotment_Park Mansion 54.pdf11 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Bank Account_Park Mansion 54.pdf11 Dec 2023
Deviation Report with respect to Allotment letterFile: Declaration for Allotment_Park Mansion 54.pdf11 Dec 2023
Deviation Report with respect to Allotment letterFile: Declaration for Deviation_Park Mansion 54.pdf11 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Declaration for Deviation_Park Mansion 54.pdf11 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Final Approval for Township from Collector.pdf8 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Park Mansion 54_Form 5 (FY 22-23).pdf5 Dec 2023
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Jun_23.pdf25 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Park Mansion 54_Jun_23.pdf6 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg_Cert_Park Mansion 54_Dec_22.pdf29 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG Park Mansion 54_Mar_23.pdf29 Aug 2023
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Mar_23.pdf8 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC Park Mansion 54_Mar_23.pdf21 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA_Cert_Park Mansion 54_Mar_23.pdf20 Jun 2023
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Dec_22.pdf19 May 2023
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Jun_22.pdf18 May 2023
Certificates of CA (Form 3)File: CA_Cert_PARK MANSION 54_Sep_22.pdf18 May 2023
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Dec_2019.pdf17 May 2023
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Sep_20.pdf17 May 2023
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Dec_20.pdf17 May 2023
Certificates of CA (Form 3)File: CA_Cert_Park Mansion 54_Jun_21.pdf17 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Park Mansion-54_ 17_18.pdf13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Park Mansion-54_18_19.pdf13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Park Mansion-54_19_20.pdf13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Park Mansion-54_20_21.pdf13 Apr 2023

How this compares with Nagpur

100%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 105 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Park Mansion 54 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mauza2,800+ in Nagpur

Builder: Luxora Infrastructure Private Limited

Luxora Infrastructure Private Limited has 23 registrations on MahaRERA, including Treeline 5 and Vista 3B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Park Mansion 54 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Park Mansion 54?

The registered promoter entity is Luxora Infrastructure Private Limited, a company as per the filing. Its CIN U70100MH2007PTC166943 and GSTIN 27AABCL2854K2ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Park Mansion 54?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Park Mansion 54?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Park Mansion 54?

The professionals named in the filing: Architect: Studio Eleven; Engineer: Jeevan Ramkrishna Kute; Chartered Accountant: Jain Nirmal Kumar & Associates; Chartered Accountant: Neha Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Park Mansion 54?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Park Mansion 54. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Park Mansion 54 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.