Home / Browse projects / Pune, Maharashtra / Park Infinia - L2, L3, L4, K4, K5 and J4
Park Infinia - L2, L3, L4, K4, K5 and J4
By Kumar Properties and Real Estate Pvt. Ltd.
RG-MH-16538 · RERA P52100026185 · Last updated on MahaRERA portal: 13 Feb 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Park Infinia - L2, L3, L4, K4, K5 and J4 is a Residential / Group Housing project by Kumar Properties and Real Estate Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100026185 on 27 Aug 2020. The registration is recorded completed; possession was promised by 30 Sep 2024.
At a glance
Project
- NamePark Infinia - L2, L3, L4, K4, K5 and J4
- TypeResidential / Group Housing
- Location
- Pune Saswad Road
- Hadapsar
- Fursungi
- Haveli
- Pune
- 412308
- Pincode412308
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100026185
- ReraGenie IDRG-MH-16538
Builder
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 Aug 2020
- Promised completion30 Sep 2024
- Revised completionNone
- Buildings6 building records
- Documents filed69 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| L2 | NA | 15 | 0 | 0 | 0 | 0 |
| L3 | NA | 15 | 0 | 0 | 0 | 0 |
| L4 | NA | 15 | 0 | 0 | 0 | 0 |
| K4 | NA | 15 | 0 | 0 | 0 | 0 |
| K5 | NA | 15 | 0 | 0 | 0 | 0 |
| J4 | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 13 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
56 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is External plumbing and external plaster, at 92%.
L286%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
L391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
L491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
K487%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 92% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
K591%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
J491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 13 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 66% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 69% |
| Storm Water Drains | Yes | 66% |
| Landscaping & Tree Planting | Yes | 66% |
| Street Lighting | Yes | 66% |
| Community Buildings | Yes | 80% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 66% |
| Solid Waste Management And Disposal | Yes | 66% |
| Water conservation /Rain water harvesting | Yes | 66% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 60% |
| Electrical meter room, sub-station, receiving station | Yes | 55% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed336
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| L2 | 31 | 25 | 56 |
| L3 | 31 | 25 | 56 |
| L4 | 32 | 24 | 56 |
| K4 | 31 | 25 | 56 |
| K5 | 31 | 25 | 56 |
| J4 | 32 | 24 | 56 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Jagadish P Deshpande |
| Engineer | Neha Dighe |
| Chartered Accountant | Supriya Abhijit Mundada |
| Partner | Role in project |
|---|---|
| Kumar Properties and Real Estate Pvt. Ltd. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Aug 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 13 Feb 2024
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 230426_L3 L4_Completion Certificate.pdf | 13 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 230123_J4 K5_Completion Certificate.pdf | 13 Feb 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: 240213_Form 4_Architect certificate.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 16 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 240115_L2 K4 _Completion Certificate.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 23_Park Infinia - L2, L3, L4, K4, K5, J4.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 37_Park Infinia - L2 L3 L4 K4 K5 and J4.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: 23_Park Infinia - L2, L3, L4, K4, K5, J4_compressed.pdf | 19 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 19 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 25 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: 19_Park Infinia - L2, L3, L4, K4, K5, J4.pdf | 20 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 21 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 21 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 21 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 21 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_1.pdf | 17 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 17 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_1.pdf | 17 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_2.pdf | 17 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: 19_Park Infinia - L2, L3, L4, K4, K5, J4_compressed.pdf | 13 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 37_Park Infinia - L2 L3 L4 K4 K5 and J4.pdf | 19 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: 19_Park Infinia - L2, L3, L4, K4, K5, J4_compressed.pdf | 17 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: 19_Park Infinia - L2, L3, L4, K4, K5, J4_Disclosure of Sold Inventory.pdf | 21 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 16 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 16 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 5_Form 2A_Quality.pdf | 16 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: 19_Park Infinia - L2, L3, L4, K4, K5, J4_Disclosure of Sold Inventory_compressed.pdf | 16 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 16 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: 19_Park Infinia - L2, L3, L4, K4, K5, J4_Disclosure of Sold Inventory.pdf | 2 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg certificate.pdf | 22 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 22 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Park Infinia - L2 L3 L4 K4 K5 and J4.pdf | 13 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: 19_Park Infinia - L2, L3, L4, K4, K5, J4_Disclosure of Sold Inventory.pdf | 22 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 8 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 8 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 5_Quality Certificate_Form 2A.pdf | 8 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 8 Oct 2021 |
| Declaration about Commencement CertificateFile: 37_Park Infinia - L2 L3 L4 K4 K5 and J4.pdf | 7 Oct 2021 |
| Proforma of Allotment letterFile: 210318_L2 L3 L4 K4 K5 J4_Allotment and Agreement.pdf | 18 Mar 2021 |
| Layout approvalFile: 4_Layout.pdf | 24 Aug 2020 |
| Building plan approvalFile: 13_Building Plan_J4.pdf | 24 Aug 2020 |
| Building plan approvalFile: 13_Building Plan_K4 K5.pdf | 24 Aug 2020 |
| Building plan approvalFile: 13_Building Plan_L2 L4.pdf | 24 Aug 2020 |
| Building plan approvalFile: 13_Building Plan_L3.pdf | 24 Aug 2020 |
| PAN CardFile: 1_Pan Card.pdf | 24 Aug 2020 |
| Copy of the legal title reportFile: 2_Legal Title Report.pdf | 24 Aug 2020 |
| Copy of the legal title reportFile: 2_Legal Title Report_2.pdf | 24 Aug 2020 |
| Details of encumbrancesFile: 2_Legal Title Report_2.pdf | 24 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: 4_Layout.pdf | 24 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_J4.pdf | 24 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_K4 K5.pdf | 24 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_L2 L4.pdf | 24 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_L3.pdf | 24 Aug 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: 12_Commencement Certificate.pdf | 24 Aug 2020 |
| Declaration in FORM BFile: 6_Form B_Declaration_R1.pdf | 24 Aug 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8_CA Certificate.pdf | 24 Aug 2020 |
| Proforma of Allotment letterFile: 5_Allotment Letter and Agreement for Sale.pdf | 24 Aug 2020 |
Promoter's earlier projects10
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Park Infinia - L2, L3, L4, K4, K5, J4 | Fursungi | 336 | Completed | Sep 2024 | Jan 2024 |
| Park Infinia - I1, I2, I3, J2, J3 and K1 | Fursungi | 336 | Completed | Jun 2023 | Jun 2022 |
| Kumar Picasso - O | Hadapsar | 132 | Completed | Feb 2022 | Jan 2021 |
| Park Infinia Phase IV | Fursungi | 112 | Completed | Feb 2022 | Dec 2020 |
| Picasso Phase II | Hadapsar | 88 | Completed | Dec 2019 | Sep 2018 |
| Park Infinia Phase III | Fursungi | 334 | Completed | May 2019 | Mar 2018 |
| Kumar Picasso - E | Hadapsar | 94 | Completed | May 2017 | Late, Jun 2017 |
| Park Infinia Phase II | Fursungi | 564 | Completed | Jan 2014 | Jul 2013 |
| Park Infinia Phase I | Fursungi | 470 | Completed | Jun 2011 | Aug 2010 |
| Kumar Picasso Phase I | Hadapsar | 198 | Completed | Dec 2010 | Sep 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
Keep Park Infinia - L2, L3, L4, K4, K5 and J4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hadapsar13,700+ in Pune
Filed coordinates, straight-line distance. 96 registered projects within 2 km.
Ashtavinayak City Phase - 3
Ashtavinayak City Pune LLP
CELESTIA
Malpani Properties
SAMRUDDHI HEIGHTS
Shree Samruddhi Corporation
Suyog Shrushti
Suyog Developers
Ashtavinayak City Phase - 4
Ashtavinayak Reality
Everra Phase 1
Honcho Properties Private Limited
Builder: Kumar Properties and Real Estate Pvt. Ltd.
Kumar Properties and Real Estate Pvt. Ltd. has 8 registrations on MahaRERA, including Park Infinia Phase III and Picasso Phase II. Its filings disclose 10 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Park Infinia - L2, L3, L4, K4, K5 and J4 is delayed beyond 30 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Park Infinia - L2, L3, L4, K4, K5 and J4?
The registered promoter entity is Kumar Properties and Real Estate Pvt. Ltd., a company as per the filing. Its CIN U45202PN1994PTC077842 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Park Infinia - L2, L3, L4, K4, K5 and J4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Park Infinia - L2, L3, L4, K4, K5 and J4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Park Infinia - L2, L3, L4, K4, K5 and J4?
The professionals named in the filing: Architect: Jagadish P Deshpande; Engineer: Neha Dighe; Chartered Accountant: Supriya Abhijit Mundada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Park Infinia - L2, L3, L4, K4, K5 and J4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback