Home / Browse projects / Pune, Maharashtra / CELESTIA

Registered No litigation declared Others project

CELESTIA

By Malpani Properties

RG-MH-19143 · RERA P52100078194 · Last updated on MahaRERA portal: 5 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
5 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 90%
173 of 378Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

CELESTIA is a Others project by Malpani Properties in Pune, Maharashtra, registered with MahaRERA as P52100078194 on 29 Nov 2024. Possession is promised by 31 Dec 2028. 205 of the 378 units on this registration are recorded sold or booked, and 5 of 33 construction stages are filed complete.

At a glance

Project

  • NameCELESTIA
  • TypeOthers
  • Location
    • -
    • Fursungi
    • Haveli
    • Pune
    • 412308
  • Pincode412308
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078194
  • ReraGenie IDRG-MH-19143

Builder

  • NameMalpani Properties
  • Entity typePartnership
  • GSTIN27ABKFM3422D1ZI
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersNitin Suresh Malpani, Devendra Satish Bhattad
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects3 →

Key dates

this monthRegisteredNov 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed95 files

Current status

54%205 of 378 units booked
74.3%Work done, per cost certificate

Figures as on 5 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA951120112
C WINGNA18151124116
D WINGNA161313218150

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 90%.

B WING45%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING53%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
D WING17%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed224

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots224
Closed/Covered224
BuildingClosed/CoveredTotal
B WING5555
C WING6969
D WING100100

Land and ownership25

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area16,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners25
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jun 2025
LandownerVillageDistrict
BALAJI SAMBHAJI SHITOLEPune (M Corp.)Pune
SANDHYA SHANTARAM SHITOLEPune (M Corp.)Pune
Neelam Subhash ShitolePune (M Corp.)Pune
Chandrakant Marutrao ShitolePune (M Corp.)Pune
Malati Sudam KondhalkarPune (M Corp.)Pune
Nitin Sudam KondhalkarPune (M Corp.)Pune
Dattatarya Govind KondalkarPune (M Corp.)Pune
Sambhaji Marutrao ShitolePune (M Corp.)Pune
Shantaram Vasantrao ShitolePune (M Corp.)Pune
Anil Daulata KhondhalkarPune (M Corp.)Pune
Shobha Balasaheb NavalePune (M Corp.)Pune
Sachin Sudam KondhalkarPune (M Corp.)Pune
Mayuri Nilesh PokalePune (M Corp.)Pune
Shalan Uttam KondhalkarPune (M Corp.)Pune
Avdhut Uttam KondhalkarPune (M Corp.)Pune
Sarika Janardan BharatvanshiPune (M Corp.)Pune
Monika Vitthal PawarPune (M Corp.)Pune
Jyotiba Dagadu KondalkarPune (M Corp.)Pune
Ratan Govind KondalkarPune (M Corp.)Pune
Sujata Dipak ChoraghePune (M Corp.)Pune
Rajashri Sandip KunjirPune (M Corp.)Pune
Monika Satish KalbhorPune (M Corp.)Pune
Balasaheb ShitolePune (M Corp.)Pune
Vikas Vasantrao ShitolePune (M Corp.)Pune
Subhash Shivaji DeshmukhPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNCIPAL CORPORATION
Permissible FSI72229.32
Proposed, not sanctioned24,018 sq m
Buildings approved4
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHE CITY JEWEL MALL BELOW BHAGGAT TARACHAND 709 NARAYAN LAXMI ROAD PUNE 411030
Estimated costRs 54.65 cr
Cost incurredRs 40.61 cr
Work done74.3%
BuildingWingEstimatedIncurred
D WINGNARs 15.25 crRs 5.88 cr
B WINGNARs 14.70 crRs 14.46 cr
C WINGNARs 14.70 crRs 14.46 cr
-NARs 10.00 crRs 5.80 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAILESH DANDANE
EngineerAnish Vikas Shah
Chartered AccountantBRIJESH CHANDAK
Chartered AccountantParag Patwa & Associates
PartnerRole in project
Malpani Properties-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf5 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf5 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf26 May 2026
Withdrawal Update Form 2File: Form 2.pdf26 May 2026
Withdrawal Update Form 3File: Form 3.pdf26 May 2026
Withdrawal Update Form 1File: CELESTIA-FORM 1 - 30-09-2025_.pdf5 May 2026
Withdrawal Update Form 2File: CELESTIA-FORM 2- 30-09-2025.pdf5 May 2026
Withdrawal Update Form 3File: CELESTIA-FORM 3- 30-09-2025.pdf5 May 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf4 May 2026
Layout approvalFile: 1-10_compressed.pdf18 Aug 2025
Building plan approvalFile: 1-10_compressed.pdf18 Aug 2025
Building plan approvalFile: 2-10_compressed.pdf18 Aug 2025
Building plan approvalFile: 3-10_compressed.pdf18 Aug 2025
Building plan approvalFile: 4-10_compressed.pdf18 Aug 2025
Building plan approvalFile: 5-10_compressed.pdf18 Aug 2025
Building plan approvalFile: 6-10_compressed.pdf18 Aug 2025
Building plan approvalFile: 7-10_compressed.pdf18 Aug 2025
Building plan approvalFile: 8-10_compressed.pdf18 Aug 2025
Building plan approvalFile: 9-10_compressed.pdf18 Aug 2025
Building plan approvalFile: 10-10_compressed.pdf18 Aug 2025
Form 1File: Form 1 Q3.pdf18 Aug 2025
Form 2File: Form 2 Q3.pdf18 Aug 2025
Form 3File: Form 3 Q3.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf18 Aug 2025
Withdrawal Update Form 1File: Form 1.pdf18 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf18 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf18 Aug 2025
Form 1File: Form 1_compressed.pdf4 Jul 2025
Form 2File: Form 2_compressed.pdf4 Jul 2025
Form 3File: Form 3_compressed.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Promoters Disclosure.pdf4 Jul 2025
Disclosure of sold/ booked inventoryFile: CELESTIA Disclosure of Sold or Booked Inventory 31-12-2024.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: CELESTIA Disclosure of Sold or Booked Inventory 31-12-2024.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Celestia Form 1_11zon.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Celestia Form 3_11zon.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Celestia Form 3 last 2 page.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Celestia Form 2_11zon.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Celestia Form 1_11zon.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Celestia Form 3_11zon.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Celestia Form 3 last 2 page.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Celestia Form 2_11zon.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf22 Nov 2024
Copy of the legal title reportFile: Format A - Legal Title.pdf13 Nov 2024
Copy of the legal title reportFile: 2 Copy of the legal title report.pdf13 Nov 2024
Details of encumbrances concerned to FinanceFile: Encumbrances - Legal.pdf13 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: PMC TO RERA.pdf13 Nov 2024
Details of encumbrances concerned to LegalFile: Encumbrances - Legal.pdf13 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: KOTAK BANK LETTER-1-8_compressed.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG_compressed.pdf8 Nov 2024
Building plan approvalFile: 12 -12_compressed.pdf28 Oct 2024
Building plan approvalFile: 11 -12_compressed.pdf28 Oct 2024
Building plan approvalFile: 10 -12_compressed.pdf28 Oct 2024
Building plan approvalFile: 9 -12_compressed.pdf28 Oct 2024
Building plan approvalFile: 8 -12_compressed.pdf28 Oct 2024
Building plan approvalFile: 7 -12_compressed.pdf28 Oct 2024
Building plan approvalFile: 6 -12_compressed.pdf28 Oct 2024
Building plan approvalFile: 5 -12_compressed.pdf28 Oct 2024
Building plan approvalFile: 4 -12_compressed.pdf28 Oct 2024
Building plan approvalFile: 3 -12_compressed.pdf28 Oct 2024
Building plan approvalFile: 2 -12_compressed.pdf28 Oct 2024
Layout approvalFile: 1 -12_compressed.pdf28 Oct 2024
PAN CardFile: PAN Card.pdf28 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Finance.pdf28 Oct 2024
Copy of Layout Approval (in case of layout)File: 1 -12_compressed.pdf28 Oct 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER-DRAFT 01-10-2024.pdf28 Oct 2024
Declaration in FORM BFile: FORM B - MP DSB_compressed.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIGNED_compressed.pdf28 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 9 -12_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 -12_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 -12_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 -12_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 -12_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 -12_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 7 -12_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 8 -12_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 10 -12_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 11 -12_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 12 -12_compressed.pdf28 Oct 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
GREEN PARK PLOT 1P52100032284Fursungi, PuneDec 2021CompletedJun 2025Mar 2025
GREEN PARK PLOT 2P52100025390Fursungi, PuneMay 2020CompletedAug 2024Feb 2023

How this compares with Pune

54%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CELESTIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Fursungi13,700+ in Pune

2 kmCELESTIACompleted 27Lapsed / revoked 11Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: Malpani Properties

Malpani Properties has 4 registrations on MahaRERA, including GREEN PARK PLOT 2 and GREEN PARK PLOT 1. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if CELESTIA is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CELESTIA?

The registered promoter entity is Malpani Properties, a partnership as per the filing. Its GSTIN 27ABKFM3422D1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CELESTIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CELESTIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CELESTIA?

The professionals named in the filing: Architect: SHAILESH DANDANE; Engineer: Anish Vikas Shah; Chartered Accountant: BRIJESH CHANDAK; Chartered Accountant: Parag Patwa & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CELESTIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CELESTIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CELESTIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.