Home / Browse projects / Pune, Maharashtra / Park Infinia - L1, K3 and I4
Park Infinia - L1, K3 and I4
By Kumar Properties and Real Estate Pvt. Ltd.
RG-MH-53404 · RERA P52100045667 · Last updated on MahaRERA portal: 4 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Park Infinia - L1, K3 and I4 is a Residential / Group Housing project by Kumar Properties and Real Estate Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100045667 on 6 Jun 2022. The registration is recorded completed; possession was promised by 31 Dec 2024. 166 of the 168 units on this registration are recorded sold or booked, and 23 of 33 construction stages are filed complete.
At a glance
Project
- NamePark Infinia - L1, K3 and I4
- TypeResidential / Group Housing
- Location
- Pune Saswad Road
- Hadapsar
- Fursungi
- Haveli
- Pune
- 412308
- Pincode412308
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045667
- ReraGenie IDRG-MH-53404
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on6 Jun 2022
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings3 building records
- Documents filed74 files
Current status
Figures as on 4 Dec 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| L1 | NA | 15 | 0 | 56 | 0 | 56 |
| K3 | NA | 15 | 0 | 56 | 0 | 56 |
| I4 | NA | 15 | 0 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 4 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
23 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.
L187%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
K387%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 92% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 67% |
I484%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 87% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 92% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 4 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
Parking filed168
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| L1 | 31 | 25 | 56 |
| K3 | 31 | 25 | 56 |
| I4 | 31 | 25 | 56 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| L1 | NA | Rs 10.54 cr | Rs 10.15 cr |
| K3 | NA | Rs 10.54 cr | Rs 10.15 cr |
| I4 | NA | Rs 10.54 cr | Rs 10.15 cr |
| - | NA | Rs 4.31 cr | Rs 4.31 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arch Jagadish P Deshpande |
| Architect | Vishal J Deshpande |
| Engineer | Mahesh Rasal |
| Chartered Accountant | Supriya Abhijit Mundada |
| Chartered Accountant | GMKS & Co. Chartered Accountants |
| Partner | Role in project |
|---|---|
| Kumar Properties and Real Estate Pvt. Ltd. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 Oct 2024
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: 240905_Form 4_R1.pdf | 4 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 240412_OC_ L1 K3.pdf | 14 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 240903_OC_I4.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Park infinia-L1,K3,I4.pdf | 14 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: 240905_Form 4_R1.pdf | 14 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: 240905_Form 4_R1.pdf | 14 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 240412_OC_ L1 K3.pdf | 14 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 240903_OC_I4.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Park infinia-L1,K3,I4.pdf | 14 Oct 2024 |
| Occupational CertificateFile: 240412_OC_ L1 & K3.pdf | 24 Sep 2024 |
| Occupational CertificateFile: 240903_OC_I4.pdf | 24 Sep 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory_compressed.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Jul 2024 |
| Proforma of Agreement for saleFile: 240610_K3_AFS_Ready Possession.pdf | 12 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 24_Park Infinia - L1, K3 and I4.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Apr 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: 240308_Decl about Grievance Redressal Cell.pdf | 8 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 24_Park Infinia - L1, K3 and I4_compressed.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 56_Park Infinia - L1 K3 I4.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: 24_Park Infinia - L1, K3 and I4.pdf | 19 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 19 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 25 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 20 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: 30_Park Infinia - L1, K3 and I4.pdf | 20 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 21 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 21 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 17 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 17 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 17 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 17 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA certificate.pdf | 17 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 17 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: 30_Park Infinia - L1, K3 and I4.pdf | 13 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: 30_Park Infinia - L1, K3 and I4.pdf | 19 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: 30_Park Infinia - L1, K3 and I4.pdf | 21 Jul 2022 |
| Layout approvalFile: 4_Layout_R1.pdf | 19 May 2022 |
| Building plan approvalFile: 13_Building Plan_I4_1.pdf | 19 May 2022 |
| Building plan approvalFile: 13_Building Plan_I4_2.pdf | 19 May 2022 |
| Building plan approvalFile: 13_Building Plan_K3.pdf | 19 May 2022 |
| Building plan approvalFile: 13_Building Plan_L1.pdf | 19 May 2022 |
| PAN CardFile: 1_Pan Card.pdf | 19 May 2022 |
| Copy of the legal title reportFile: 2_Legal Title Report.pdf | 19 May 2022 |
| Copy of the legal title reportFile: 2_Legal Title Report_2.pdf | 19 May 2022 |
| Copy of the legal title reportFile: 2_Legal Title Report_3.pdf | 19 May 2022 |
| Details of encumbrancesFile: 3_Encumbrance Certificate.pdf | 19 May 2022 |
| Copy of Layout Approval (in case of layout)File: 4_Layout_R1.pdf | 19 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_I4_1.pdf | 19 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_I4_2.pdf | 19 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_K3.pdf | 19 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan_L1.pdf | 19 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 12_Commencement Certificate_1.pdf | 19 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 12_Commencement Certificate_2.pdf | 19 May 2022 |
| Declaration about Commencement CertificateFile: 14_Declaration_Commencement Certificate.pdf | 19 May 2022 |
| Declaration in FORM BFile: 6_Form B_Declaration_compressed.pdf | 19 May 2022 |
| CERSAI detailsFile: 3_Encumbrance Certificate.pdf | 19 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8_CA Certificate.pdf | 19 May 2022 |
| Proforma of Allotment letterFile: 5_Allotment and Agreement.pdf | 19 May 2022 |
Promoter's earlier projects10
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Park Infinia - L2, L3, L4, K4, K5, J4 | Fursungi | 336 | Completed | Sep 2024 | Jan 2024 |
| Park Infinia - I1, I2, I3, J2, J3 and K1 | Fursungi | 336 | Completed | Jun 2023 | Jun 2022 |
| Kumar Picasso - O | Hadapsar | 132 | Completed | Feb 2022 | Jan 2021 |
| Park Infinia Phase IV | Fursungi | 112 | Completed | Feb 2022 | Dec 2020 |
| Picasso Phase II | Hadapsar | 88 | Completed | Dec 2019 | Sep 2018 |
| Park Infinia Phase III | Fursungi | 334 | Completed | May 2019 | Mar 2018 |
| Kumar Picasso - E | Hadapsar | 94 | Completed | May 2017 | Late, Jun 2017 |
| Park Infinia Phase II | Fursungi | 564 | Completed | Jan 2014 | Jul 2013 |
| Park Infinia Phase I | Fursungi | 470 | Completed | Jun 2011 | Aug 2010 |
| Kumar Picasso Phase I | Hadapsar | 198 | Completed | Dec 2010 | Sep 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
Keep Park Infinia - L1, K3 and I4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hadapsar13,700+ in Pune
Filed coordinates, straight-line distance. 95 registered projects within 2 km.
Ashtavinayak City Phase - 3
Ashtavinayak City Pune LLP
CELESTIA
Malpani Properties
SAMRUDDHI HEIGHTS
Shree Samruddhi Corporation
Suyog Shrushti
Suyog Developers
Ashtavinayak City Phase - 4
Ashtavinayak Reality
Everra Phase 1
Honcho Properties Private Limited
Builder: Kumar Properties and Real Estate Pvt. Ltd.
Kumar Properties and Real Estate Pvt. Ltd. has 8 registrations on MahaRERA, including Park Infinia Phase III and Picasso Phase II. Its filings disclose 10 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Park Infinia - L1, K3 and I4 is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Park Infinia - L1, K3 and I4?
The registered promoter entity is Kumar Properties and Real Estate Pvt. Ltd., a company as per the filing. Its CIN U45202PN1994PTC077842 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Park Infinia - L1, K3 and I4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Park Infinia - L1, K3 and I4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Park Infinia - L1, K3 and I4?
The professionals named in the filing: Architect: Arch Jagadish P Deshpande; Architect: Vishal J Deshpande; Engineer: Mahesh Rasal; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: GMKS & Co. Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Park Infinia - L1, K3 and I4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback