Home / Browse projects / Nagpur, Maharashtra / Park House Holistic
Park House Holistic
By Luxora Infrastructure Private Limited
RG-MH-01670 · RERA P50500011398 · Last updated on MahaRERA portal: 11 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 84 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Park House Holistic is a Residential / Group Housing project by Luxora Infrastructure Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500011398 on 31 Aug 2017. Possession is promised by 30 Dec 2026. The completion date has moved by 84 months from the original filing. 12 of the 31 units on this registration are recorded sold or booked, and 48 of 128 construction stages are filed complete.
At a glance
Project
- NamePark House Holistic
- TypeResidential / Group Housing
- Location
- Kharsoli Road
- Mauza
- Pipla
- Nagpur (Rural)
- Nagpur
- 440034
- Pincode440034
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500011398
- ReraGenie IDRG-MH-01670
Builder
- NameLuxora Infrastructure Private Limited
- Entity typeCompany
- CINU70100MH2007PTC166943
- GSTIN27AABCL2854K2ZA
- DirectorsDeepak Mahadeo Vasandani, Tarun Hundalani
- Other registrations22 more →
- Completed8 of 23
- No longer live4 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Aug 2017
- Promised completion30 Dec 2026
- Revised completionRevised to 30 Dec 2026 (originally 31 Dec 2019)
- Buildings16 building records
- Documents filed294 files
Current status
Figures as on 11 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Park House Holistic Row House No. 13 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 14 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 15 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 16 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 17 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 18 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 19 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 20 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 21 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 22 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 23 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 24 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 25 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 26 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No. 27 | NA | 2 | 2 | 1 | 0 | 1 |
| Park House Holistic Row House No 12 | NA | 2 | 2 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building16
As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
48 of 128 construction stages are filed complete across 16 buildings. The stage furthest along is Installation of Lifts, at 90%.
Park House Holistic Row House No. 1367%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 1467%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 1567%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 1667%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 1767%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 1867%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 1967%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 2067%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 2167%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 2267%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 2367%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 2467%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 2567%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 2667%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No. 2767%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Park House Holistic Row House No 1264%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 16% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 62% |
| Water Supply | Yes | 35% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 67% |
| Storm Water Drains | Yes | 67% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 10% |
| Community Buildings | Yes | 50% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 37% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Park House Holistic Row House No. 13 | NA | Rs 1 | Rs 1 |
| Park House Holistic Row House No. 14 | NA | Rs 1 | Rs 1 |
| Park House Holistic Row House No. 15 | NA | Rs 1 | Rs 1 |
| Park House Holistic Row House No. 16 | NA | Rs 1 | Rs 1 |
| Park House Holistic Row House No. 17 | NA | Rs 1 | Rs 1 |
| Park House Holistic Row House No. 18 | NA | Rs 1 | Rs 1 |
| Park House Holistic Row House No. 19 | NA | Rs 1 | Rs 1 |
| Park House Holistic Row House No. 20 | NA | Rs 1 | Rs 1 |
| Park House Holistic Row House No. 21 | NA | Rs 1 | Rs 1 |
| Park House Holistic Row House No. 22 | NA | Rs 1 | Rs 1 |
| Park House Holistic Row House No. 23 | NA | Rs 1 | Rs 1 |
| Park House Holistic Row House No. 24 | NA | Rs 1 | Rs 1 |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Studio Eleven |
| Engineer | Jeevan Ramkrishna Kute |
| Chartered Accountant | Jain Nirmal Kumar & Associates |
| Chartered Accountant | Neha Joshi |
| Partner | Role in project |
|---|---|
| Luxora Infrastructure Private Limited | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to the fact that a new 18m wide DP road was proposed by NMC in the Regional Plan which directly affected the project after the start of its construction, construction of the project was delayed until clarifications were successfully received on the same.
Reason as filed by the promoterDue to the fact that a new 18 m wide DP road was proposed by NMC in the regional plan which directly affected the project after the start of the construction, construction was delayed until clarifications were succesfully received on the same. The new project completion date will be 31st Dec 2025 as we would like to apply via section 7(3) with customer consent.
Reason as filed by the promoterWe, LUXORA INFRASTRUCTURE PRIVATE LIMITED, Promoter of the real estate project “PARK HOUSE HOLISTIC”, bearing MahaRERA Registration No. P50500011398, hereby submit this application seeking an extension of Twelve (12) months for completion of the said project. We respectfully submit that the delay in completion of the project has occurred due to circumstances beyond the control of the promoter. The progress of the project was impacted due to delays in obtaining statutory approvals and revalidations, fluctuations in the real estate market affecting sales and cash flow, and delay in development o
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Mar 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 Jan 2022
Documents filed294
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 294 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: QA_Cert_Park House Holistic_Mar_26.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: Arch_Cert_Upload_Park House Holistic_Mar_26.pdf | 5 May 2026 |
| Withdrawal Update Form 2File: Engg_Cert_Park House Holistic_Mar_26.pdf | 5 May 2026 |
| Withdrawal Update Form 3File: CA_Cert_Upload_Holistic_Mar_26.pdf | 5 May 2026 |
| Building plan approvalFile: PHH PLAN 1.pdf | 24 Mar 2026 |
| Building plan approvalFile: PHH PLAN 2.pdf | 24 Mar 2026 |
| Building plan approvalFile: PHH PLAN 3.pdf | 24 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE JUN-2020.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE JUN-2020.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA JUN-2020.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_30-06-2020.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE SEP-2020.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE SEP-2020.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA SEP-2020.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_30-09-2020.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE DEC-2020.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE DEC-2020.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA DEC-2020.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_31-12-2020.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE MAR-2021.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE MAR-2021.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA MAR-2021.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_31-03-2021.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE JUN-2021.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE JUN-2021.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA JUN-2021.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_30-06-2021.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE SEP-2021.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE SEP-2021.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA SEP-2021.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_30-09-2021.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE DEC-2021.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE DEC-2021.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA DEC-2021.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_31-12-2021.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE MAR-2022.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE MAR-2022.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA MAR-2022.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_31-03-2022.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE JUN-2022.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE JUN-2022.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA JUN-2022.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_30-06-2022.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE SEP-2022.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE SEP-2022.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA SEP-2022.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_30-09-2022 (1).pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE DEC-2022.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE DEC-2022.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA DEC-2022.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_31-12-2022.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE MAR-2023.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE MAR-2023.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA MAR-2023 (1).pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_31-03-2023.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE JUN-2023.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE JUN-2023.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA JUN-2023.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_30-06-2023.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE SEP-2023.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE SEP-2023.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA SEP-2023.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_30-09-2023.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE DEC-2023.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE DEC-2023.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA DEC-2023.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_31-12-2023.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE MAR-2024.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE MAR-2024.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA MAR-2024.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_31-03-2024.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE JUN-2024.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE JUN-2024.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA JUN-2024.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_30-06-2024.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE SEP-2024.pdf | 4 Mar 2026 |
| Form 2File: PARK HOUSE HOLISTIC FORM-2 ENGINEER CERTIFICATE SEP-2024.pdf | 4 Mar 2026 |
| Form 3File: PARK HOUSE HOLISTIC FORM-3 CA SEP-2024.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked_Holistic_30-09-2024.pdf | 4 Mar 2026 |
| Form 1File: PARK HOUSE HOLISTIC FORM-1 ARCHITECT CERTIFICATE DEC-2024.pdf | 4 Mar 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 22 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 294 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Park House Holistic on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mauza2,800+ in Nagpur
Filed coordinates, straight-line distance. 54 registered projects within 2 km.
BHEDE NAGARI -CHARITON
DILIP GANPATRAO BHEDE
Godrej Orchard Estate
Godrej Properties Limited
MELBOURNE CITY
M/S 4 PILLARS REALTY
GARDEN HOMES ATHARVA NAGARI VII
ATHARVA INFRASTRUCTURES
ROYAL EMPIRE
M B INFRA
Ved Vidhi Ventures
Ved Vidhi Ventures
See every Nagpur project, with the district possession charts
Builder: Luxora Infrastructure Private Limited
Luxora Infrastructure Private Limited has 23 registrations on MahaRERA, including Treeline 5 and Vista 3B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if Park House Holistic is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Park House Holistic?
The registered promoter entity is Luxora Infrastructure Private Limited, a company as per the filing. Its CIN U70100MH2007PTC166943 and GSTIN 27AABCL2854K2ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Park House Holistic?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Park House Holistic?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Park House Holistic?
The professionals named in the filing: Architect: Studio Eleven; Engineer: Jeevan Ramkrishna Kute; Chartered Accountant: Jain Nirmal Kumar & Associates; Chartered Accountant: Neha Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Park House Holistic?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback