Registered No litigation declared Residential / Group Housing project

PARIVAR RESIDENCY

By PARIVAR DEVELOPERS

RG-MH-28315 · RERA P99000025455 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 43 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 43 months from the original
13 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
40 of 106Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

PARIVAR RESIDENCY is a Residential / Group Housing project by PARIVAR DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000025455 on 3 Jun 2020. Possession is promised by 30 Jun 2027. The completion date has moved by 43 months from the original filing. 66 of the 106 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.

At a glance

Project

  • NamePARIVAR RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • VILLAGE MAKANE
    • SAPHALE WEST
    • Makane
    • Palghar
    • 401102
  • Pincode401102
  • RERA no.P99000025455
  • ReraGenie IDRG-MH-28315

Builder

  • NamePARIVAR DEVELOPERS
  • Entity typePartnership
  • PartnersMIHIR MILIND BHATE, KAMLESH MOHANDAS LAKHWANI, RAMESH VASANT PATIL
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2020First promiseNov 2023Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jun 2020
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Nov 2023)
  • Buildings2 building records
  • Documents filed81 files

Current status

62%66 of 106 units booked
89.2%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA7762567
WING BNA5539039

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

WING A66%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
WING B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes30%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes40%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed119

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots119
Open Space119
BuildingOpen SpaceTotal
WING A5959
WING B6060

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,860 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jul 2025
LandownerVillageDistrict
NANDKUMAR D PATILSaphalePalghar

Approvals and building plan

Sanctioning authorityCOLLECTOR PALGHAR
Permissible FSI5004.97
Proposed, not sanctioned5,005 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3 4 5 AND 6 SWASTIK PARK SAPHALE PALGHAR ROAD THANE 401102
Estimated costRs 7.24 cr
Cost incurredRs 6.46 cr
Work done89.2%
BuildingWingEstimatedIncurred
WING ANARs 3.26 crRs 3.19 cr
WING BNARs 3.26 crRs 3.19 cr
-NARs 72.39 lakhRs 7.24 lakh

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectROSHAN PATIL & ASSOCIATES
ArchitectANJALIS ASSOCIATES
EngineerJITESH PATEL
EngineerSHAH & ASSOCIATES
EngineerMIHIR BHATE
EngineerVIMAL AGRAWAL
Chartered AccountantKUNAL A MODY AND CO
Chartered AccountantAAKASH R DADIA AND CO
Chartered AccountantUMESH P. MESTRY & CO
PartnerRole in project
PARIVAR DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000017959Nov 2023 → Jun 2026

Reason as filed by the promoterTHE PROJECT IS BEING EXTENDED DUE TO COVID DUE TO WHICH THERE WAS A SLOW DOWN IN CONSTRUCTION SERVICE.

EA23062621489Nov 2023 → Jun 2027

Reason as filed by the promoterFINISHING WORK REGARDING EXTERNAL SERVICES / SITE DEVELOPEMENT WORKS ARE PENDING AND DUE TO BE COMPLETED SOON. OCCUPANCY CERTIFICATE IS ALSO EXPECTED TO BE RECEIVED BY 30/06/2027.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1.pdf20 Jul 2026
Withdrawal Update Form 2File: FORM-2.pdf20 Jul 2026
Withdrawal Update Form 3File: FORM-3.pdf20 Jul 2026
Form 2A (FY 2024-2025)File: FORM 2A.pdf23 Jun 2026
Form 2A (FY 2025-2026)File: F Y 2025-26.pdf23 Jun 2026
Withdrawal Update Form 1File: FORM-1.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM-2.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM-3 FINAL F.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 SIGNED.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2 SIGNED.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3 SIGNED.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf5 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf5 Nov 2025
Withdrawal Update Form 3File: FORM-3.pdf5 Nov 2025
Form 5 (FY 2024-2025)File: form 5 final.pdf14 Oct 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf20 Jul 2025
Form 1File: FORM 1.pdf20 Jul 2025
Form 2File: FORM 2 Q 4.pdf20 Jul 2025
Form 3File: FORM 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold.pdf20 Jul 2025
Form 2A (FY 2022-2023)File: FORM 2A FY 22-23.pdf20 Jul 2025
Form 2A (FY 2023-2024)File: FORM 2A FY 23-24.pdf20 Jul 2025
Form 5 (FY 2020-2021)File: FORM 5 - 2020-21.pdf20 Jul 2025
Form 5 (FY 2021-2022)File: FORM 5 - 2021-22.pdf20 Jul 2025
Form 5 (FY 2022-2023)File: FORM 5 - 2022-23.pdf20 Jul 2025
Form 5 (FY 2023-2024)File: FORM 5 - 2023-24.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q 4.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 F Y 2023-24.pdf24 Dec 2024
Layout approvalFile: LAYOUT PLAN-Parivar_11zon.pdf1 Jul 2024
Building plan approvalFile: BUILDING PLAN-pARIVAR_11zon.pdf1 Jul 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN-Parivar_11zon.pdf1 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN-pARIVAR_11zon.pdf1 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: 2 Commencement Certificates _ NA Order for plotted development.pdf1 Jul 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf1 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_11zon (1).pdf20 May 2024
Building plan approvalFile: BUILDING PLAN_11zon.pdf18 May 2024
Layout approvalFile: LAYOUT PLAN_11zon.pdf18 May 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN_11zon.pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_11zon.pdf18 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_11zon.pdf18 May 2024
Declaration about Commencement CertificateFile: CC DECLARATION.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final.pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Final.pdf18 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Final.pdf18 May 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FINAL.pdf18 May 2024
Other - LegalFile: Agreement_11zon (1).pdf18 May 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FINAL.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: sold and unsold.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf21 Nov 2023
Declaration in FORM BFile: FORM B NANDU_compressed.pdf11 Nov 2023
Declaration in FORM BFile: FORM B NEW NILESH_compressed.pdf11 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_compressed.pdf11 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JITESH_compressed.pdf11 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHAH AND SHAH_compressed.pdf11 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM2A.pdf11 Nov 2023
Disclosure of sold/ booked inventoryFile: PARIVAR DEV SOLD AND UNSOLD INVENTORY.pdf11 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_compressed.pdf11 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 parivar.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: parivar 20-21.pdf11 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Aug 2021
Layout approvalFile: LAYOUT_compressed.pdf22 May 2020
Building plan approvalFile: BUILDING PLAN_compressed.pdf22 May 2020
PAN CardFile: PAN CARD.pdf22 May 2020
Copy of the legal title reportFile: TITLE SEARCH REPORT.pdf22 May 2020
Details of encumbrancesFile: ENCUMBRANCE LETTER.pdf22 May 2020
Copy of Layout Approval (in case of layout)File: LAYOUT_compressed.pdf22 May 2020
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_compressed.pdf22 May 2020
Commencement Certificates / NA Order for plotted developmentFile: PARIVAR DEVELOPERS CC_compressed.pdf22 May 2020
Declaration in FORM BFile: NILESH SHAH FORM B_compressed (1).pdf22 May 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (1).pdf22 May 2020

How this compares with Palghar

62%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 43 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARIVAR RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAPHALE WEST3,200+ in Palghar

Builder: PARIVAR DEVELOPERS

PARIVAR DEVELOPERS has 2 registrations on MahaRERA, including AEROSOL and PARIVAR RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if PARIVAR RESIDENCY is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARIVAR RESIDENCY?

The registered promoter entity is PARIVAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARIVAR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARIVAR RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARIVAR RESIDENCY?

The professionals named in the filing: Architect: ROSHAN PATIL & ASSOCIATES; Architect: ANJALIS ASSOCIATES; Engineer: JITESH PATEL; Engineer: SHAH & ASSOCIATES; Engineer: MIHIR BHATE; Engineer: VIMAL AGRAWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARIVAR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARIVAR RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARIVAR RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.