PARIVAR COMPLEX BUILDING NO 2

By PARIVAR HOMES

RG-MH-18355 · RERA P99000076862 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 60%
59 of 156Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

PARIVAR COMPLEX BUILDING NO 2 is a Others project by PARIVAR HOMES in Palghar, Maharashtra, registered with MahaRERA as P99000076862 on 3 Jul 2024. Possession is promised by 31 Dec 2028. 97 of the 156 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePARIVAR COMPLEX BUILDING NO 2
  • TypeOthers
  • Location
    • SARATODI
    • PALGHAR
    • 401102
  • Pincode401102
  • RERA no.P99000076862
  • ReraGenie IDRG-MH-18355

Builder

  • NamePARIVAR HOMES
  • Entity typePartnership
  • GSTIN27ABAFP6619H1Z4
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersKAMLESH MOHANDAS LAKHWANI, NILESH MAHENDRA SHAH
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jul 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed65 files

Current status

62%97 of 156 units booked
45.2%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING -ANA88441458
WING BNA8836743
WING CNA88441155

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 60%.

WING -A18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B55%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C51%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered72
BuildingClosed/CoveredTotal
WING -A2424
WING B2424
WING C2424

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,067 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jun 2025
LandownerVillageDistrict
MOHAN KASHINATH KINISaratodiPalghar

Approvals and building plan

Sanctioning authorityCOLLECTOR PALGHAR
Permissible FSI14968.46
Proposed, not sanctioned7,292 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHOP NO 3 4 6 SWASTIK PARK PALGHAR ROAD SAFALE EAST TALUKA PALGHAR 401102
Estimated costRs 16.71 cr
Cost incurredRs 7.56 cr
Work done45.24%
BuildingWingEstimatedIncurred
WING -ANARs 5.04 crRs 2.52 cr
WING BNARs 5.04 crRs 2.52 cr
WING CNARs 5.04 crRs 2.52 cr
-NARs 1.59 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRAN KASHINATH SHIVDE
EngineerSHAH AND ASSOCIATES
EngineerVIMAL AGRAWAL
Chartered AccountantBHAKTI K MODY
Chartered AccountantAAKASH R DADIA AND CO
PartnerRole in project
PARIVAR HOMES-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600463Bhakti AchrekarPARIVAR HOMES30/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2A.pdf19 Jun 2026
Form 2A (FY 2025-2026)File: FORM 2A FINAL.pdf19 Jun 2026
Withdrawal Update Form 1File: FORM-1.pdf27 Apr 2026
Withdrawal Update Form 2File: FORM-2.pdf27 Apr 2026
Withdrawal Update Form 3File: FORM-3 FINAL.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM 1 parivar homes.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3 - PARIVAR HOMES.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - parivar.pdf19 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf19 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf19 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf19 Oct 2025
Form 1File: Form 1.pdf17 Jun 2025
Form 2File: Form 2.pdf17 Jun 2025
Form 3File: Form 3 com.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Unsold Sold.pdf17 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf17 Jun 2025
Form 1File: Form-1.pdf17 Jun 2025
Form 2File: Form-2.pdf17 Jun 2025
Form 3File: Form-3.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold List.pdf17 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf17 Jun 2025
Form 1File: FORM 1.pdf17 Jun 2025
Form 2File: FORM 2.pdf17 Jun 2025
Form 3File: FORM 3.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf17 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf17 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold List.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 com.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Dec 2024
Disclosure of sold/ booked inventoryFile: Unsold Sold.pdf25 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: email parivar.pdf19 Jun 2024
Declaration about Commencement CertificateFile: CC declaration.pdf1 Jun 2024
Other - TechnicalFile: Annexure A.pdf1 Jun 2024
Building plan approvalFile: plan 4 parivar.pdf31 May 2024
Layout approvalFile: plan (3) (1).pdf31 May 2024
Building plan approvalFile: plan 2 parivar.pdf31 May 2024
Building plan approvalFile: plan 3 parivar.pdf31 May 2024
Copy of Layout Approval (in case of layout)File: plan (3) (1).pdf31 May 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 2 parivar.pdf31 May 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 3 parivar.pdf31 May 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 4 parivar.pdf31 May 2024
Commencement Certificates / NA Order for plotted developmentFile: PARIVAR HOMES CC.pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA part 1_merged.pdf31 May 2024
Copy of the legal title reportFile: Parivar Homes Title Search Report.pdf24 May 2024
Proforma of Allotment letterFile: PARIVAR HOMES ALLOTMENT LETTER.pdf24 May 2024
Proforma of Agreement for saleFile: PARIVAR HOMES AGREEMENT DRAFT.pdf24 May 2024
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT.pdf24 May 2024
Deviation Report with respect to model copy of AgreementFile: Agreement deviation.pdf24 May 2024
PAN CardFile: Parivar Homes Pan.pdf21 May 2024
Declaration in FORM BFile: Form B FINAL.pdf21 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow21 May 2024
Details of encumbrances concerned to FinanceFile: No encumbarance.pdf17 May 2024
Details of encumbrances concerned to LegalFile: No encumbarance.pdf17 May 2024
CERSAI detailsFile: cersai.pdf17 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Doi.pdf17 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: kamlesh Doi.pdf17 May 2024

How this compares with Palghar

62%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARIVAR COMPLEX BUILDING NO 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALGHAR3,200+ in Palghar

Builder: PARIVAR HOMES

PARIVAR HOMES has 2 registrations on MahaRERA, including PARIVAR COMPLEX BUILDING NO 2 and PARIVAR COMPLEX BUILDING NO 1 AND 3. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if PARIVAR COMPLEX BUILDING NO 2 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARIVAR COMPLEX BUILDING NO 2?

The registered promoter entity is PARIVAR HOMES, a partnership as per the filing. Its GSTIN 27ABAFP6619H1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARIVAR COMPLEX BUILDING NO 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PARIVAR COMPLEX BUILDING NO 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PARIVAR COMPLEX BUILDING NO 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARIVAR COMPLEX BUILDING NO 2?

The professionals named in the filing: Architect: KIRAN KASHINATH SHIVDE; Engineer: SHAH AND ASSOCIATES; Engineer: VIMAL AGRAWAL; Chartered Accountant: BHAKTI K MODY; Chartered Accountant: AAKASH R DADIA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARIVAR COMPLEX BUILDING NO 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARIVAR COMPLEX BUILDING NO 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARIVAR COMPLEX BUILDING NO 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.