Home / Browse projects / Sangli, Maharashtra / PARAS PLAZA

Completed No litigation declared Others project

PARAS PLAZA

By M.K.BUILDERS & DEVELOPERS

RG-MH-27444 · RERA P53100034111 · Last updated on MahaRERA portal: 3 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

PARAS PLAZA is a Others project by M.K.BUILDERS & DEVELOPERS in Sangli, Maharashtra, registered with MahaRERA as P53100034111 on 24 Mar 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NamePARAS PLAZA
  • TypeOthers
  • Location
    • TIRTHANKAR COLONY
    • SAMVSHARAN CHOUK
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100034111
  • ReraGenie IDRG-MH-27444

Builder

  • NameM.K.BUILDERS & DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAVFM2275N1ZF
  • PartnersAMOL ASHOK KOGNOLE, PRIYA AMOL KOGNOLE, NEEMA ATUL KOGNOLE, SHAKUNTALA ASHOK KOGNOLE
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2022First promiseDec 2024Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Mar 2022
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARAS PLAZANA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

PARAS PLAZA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area438 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Feb 2026
LandownerVillageDistrict
DADASAHEB D PATILPune (CB)Pune
Mrs SHUBHANGI D PATILPune (CB)Pune
ANIL A KOGNOLESangli Miraj Kupwad (M Corp.)Sangli
Mrs BHARTI A KOGNOLESangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Sanctioning authoritysangli miraj kupwad municipal corporation
Permissible FSI699.98
Proposed, not sanctioned700 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANGLI MARKET YARD GALLI NO 2 FRONT OF SEVAGRUH SANGLI

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Atul A Kognole
ArchitectAtul Ashok Kognole
EngineerEr Amol A Kognole
EngineerAMOL ASHOK KOGNOLE
Chartered AccountantCA Vinod R Patil
Chartered Accountantvinod rajgonda patil
Chartered AccountantJyoti G. Kadam
PartnerRole in project
M.K.BUILDERS & DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53100026008Dec 2024 → Dec 2025

Reason as filed by the promoterDEAR SIR/MADAM We m/s M.K.Builders have received rera registration for our said project PARAS PLAZA in c.s.no 3688 near vruddh sevashram sangli vide rera no P53100034111. our project is completed in all respect and file for obtaining oc (complition certificate) is on desk of corporation with entery no DDMCM/2024/274178/54022 Dated 08/07/2024 with proposal no 282038. because of fire safty noc work delayed by our agency we unable to get oc till date. we hope we will gate noc in coming week. no other quries than fire noc is there in our proposal. considering this we hope extension from Maharera f

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Feb 2025

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Paras form 3 31 Dec 2024.pdf3 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: paras complition certificate.pdf19 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PARAS COMPLITION.pdf19 Feb 2025
Declaration in FORM BFile: form b for ext.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ar cert jan 2025.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: er cert jan 2025.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: paras architect cert jun2024.pdf1 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: paras architect cert sep2024.pdf1 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Paras form3 june2024.pdf1 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Paras form3 sep2024_compressed.pdf1 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Paras engineer cert june2024.pdf1 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: paras engineer cert sep2024.pdf1 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality ass cert Paras 2324.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: paras ar certificate march 24 .pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: paras er cert march 24 _compressed.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: paras er cert march 24 .pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: paras ar certificate march 24 .pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: paras form5 24.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Paras ArCert.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Paras ErCert.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Paras jun23 CA_compressed.pdf10 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Paras sep23 CA_compressed.pdf10 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Paras Dec23 CA_compressed.pdf10 Jan 2024
Disclosure of sold/ booked inventoryFile: paras plaza inventory 030124.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1paras30623.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1paras51023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 paras 300623.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 paras 300923.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArForm1 30622.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArForm130922.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar form1 311222.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar letter 31323 paras.pdf6 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er form2 30622.pdf6 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ErForm2 30922.pdf6 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Erform2 311222.pdf6 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: er lett paras 31323.pdf6 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA paras 2023.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CAform30622_compressed.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CAform3 30922_compressed.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form3311222_compressed.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form3 31323_compressed.pdf6 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: C A FORM5.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar letter 31323 paras.pdf5 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: er lett paras 31323.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: er lett paras 31323.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: magdum engineer certificate Paras .pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form5 paras plaza.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: engineer certificate 31032022.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate 31032022.pdf30 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: paras rera account.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: paras inventory letter .pdf22 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Paras .pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate 31032022.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: magdum engineer certificate Paras .pdf16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A FORM3_compressed (1).pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: C A FORM5.pdf16 Feb 2023
PAN CardFile: pan card.pdf23 Mar 2022
Copy of the legal title reportFile: title flow paras_compressed.pdf23 Mar 2022
Copy of the legal title reportFile: legal tital paras_compressed.pdf23 Mar 2022
Details of encumbrancesFile: encumbrance paras_compressed.pdf23 Mar 2022
Declaration about Commencement CertificateFile: form D decaration.pdf23 Mar 2022
Declaration in FORM BFile: form b paras plaza_compressed.pdf23 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Paras ca form3_compressed.pdf23 Mar 2022
Proforma of Allotment letterFile: allotment letter PARAS.pdf23 Mar 2022
CERSAI detailsFile: CERSAI PARAS.pdf18 Mar 2022
Proforma of Allotment letterFile: m k builders agt sale paras.pdf18 Mar 2022
Layout approvalFile: Paras sanction layout.pdf8 Mar 2022
Copy of Layout Approval (in case of layout)File: Paras sanction layout.pdf8 Mar 2022
Building plan approvalFile: paras plaza sanction plan_compressed.pdf3 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: paras plaza sanction plan_compressed.pdf3 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: paras plaza Bparwana_compressed.pdf3 Mar 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SWAPNASHILP RESIDANCYP53100020636BALAJINAGR, Sangli-Apr 2019CompletedApr 2025Nov 2021
MITHIL RESIDENCYVARNALI LANE NO 3 OPP RAILWAY STATION1-CompletedApr 2014Late, Jul 2014

How this compares with Sangli

11%of Sangli projects moved their completion datethis one moved by 12 months
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep PARAS PLAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAMVSHARAN CHOUK790+ in Sangli

2 kmPARAS PLAZACompleted 38Lapsed / revoked 26Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 80 registered projects within 2 km.

Builder: M.K.BUILDERS & DEVELOPERS

M.K.BUILDERS & DEVELOPERS has 3 registrations on MahaRERA, including SWAPNASHILP RESIDANCY and BALAJI RESIDANCY. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if PARAS PLAZA is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARAS PLAZA?

The registered promoter entity is M.K.BUILDERS & DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAVFM2275N1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARAS PLAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARAS PLAZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARAS PLAZA?

The professionals named in the filing: Architect: Ar Atul A Kognole; Architect: Atul Ashok Kognole; Engineer: Er Amol A Kognole; Engineer: AMOL ASHOK KOGNOLE; Chartered Accountant: CA Vinod R Patil; Chartered Accountant: vinod rajgonda patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARAS PLAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARAS PLAZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARAS PLAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.