ReraGenieLog inGet a buyer report

Home / Browse projects / Mysore, Karnataka / PARAMOUNT RITZ

Registration approved No litigation declared Residential/Group Housing project

PARAMOUNT RITZ

By PARAMOUNT CONSTRUCTION VENTURES PVT LTD

RG-KA-40153 · RERA PRM/KA/RERA/1268/378/PR/150726/008809

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Jump to the 19 documents Report an error

PARAMOUNT RITZ is a Residential/Group Housing project by PARAMOUNT CONSTRUCTION VENTURES PVT LTD in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/150726/008809 on 15 Jul 2026. Possession is promised by 31 Dec 2030.

At a glance

Project

  • NamePARAMOUNT RITZ
  • TypeResidential/Group Housing
  • Location
    • MYSORE
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1268/378/PR/150726/008809
  • ReraGenie IDRG-KA-40153

Builder

  • NamePARAMOUNT CONSTRUCTION VENTURES PVT LTD
  • Entity typeCompany
  • CINU45309KA2023PTC169781
  • GSTIN29AANCP4860H1ZW
  • Authorized SignatoryMADHUSUDHAN R
  • DirectorMADHUSUDHAN R
  • DirectorsMADHUSUDHAN R, SHABEER ALIPUTHIYOTTIL
  • Project HeadMADHU B
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2026PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Jul 2026
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed19 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARAMOUNT RITZ---71071

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
1--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 63.35 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 34.20 cr-
On-site expenditure-Salaries of workersRs 13.25 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 7.69 cr-
Payment of taxesRs 4.96 cr-
On-site expenditure-Site OverheadRs 2.00 cr-
On-site expenditure-Consultants FeesRs 1.25 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGOPINATH
EngineerCHETHANSIDGIDDI
Chartered AccountantSATISH R

Documents filed19

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/150726/008809 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RTC, survey 19/2-
Mutation, survey 19/2-
Encumbrance Certificate, survey 19/2-
Conversion/Alienation Order, survey 19/2-
Sale/Title/Gift Deed, survey 19/2-
JDA, survey 19/2-
Khatha, survey 19/2-
Registration CertificateFile: CIN.pdf-
Memorandum of AssociationFile: ParamountConstructionPL_MoA.pdf-
Article of AssociationFile: ParamountConstructionPL_AoA.pdf-
GST CertificateFile: GST Registration Certificate.pdf-
Organization StructureFile: Anexxure11.pdf-
Certificate issued by CA Form 1File: CA certificate_Ritz (1).pdf-
Certificate issued by Architect Form 2File: Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Form3 (3) (1).pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit_0001.pdf-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationStatusPromisedDelivered
PARAMOUNT BOULEVARD-2SY NO 192 OPP ROOST HOTEL , HINKAL VILLAGE, KASABA HOBLI, HUNSUR MAIN ROAD, MYSORE , MYSORE , Mysore, Karnataka - 570017OngoingMar 2029Not due yet
PARAMOUNT RHAPSODYNo.2270/1, D-19, 19/1,19/2,19/3,19/4,19/5,19/6,19/7,19/8 , ‘Chittaranjan Mahal’ Vinoba Road , MYSORE , Mysore, Karnataka - 570012OngoingDec 2027Not due yet

How this compares with Mysore

28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep PARAMOUNT RITZ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

Builder: PARAMOUNT CONSTRUCTION VENTURES PVT LTD

PARAMOUNT CONSTRUCTION VENTURES PVT LTD has 3 registrations on RERA Karnataka, including PARAMOUNT BOULEVARD-2 and PARAMOUNT RITZ. Its filings declare 2 earlier projects, none of them declared completed. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if PARAMOUNT RITZ is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PARAMOUNT RITZ?

The registered promoter entity is PARAMOUNT CONSTRUCTION VENTURES PVT LTD, a company as per the filing. Its CIN U45309KA2023PTC169781 and GSTIN 29AANCP4860H1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PARAMOUNT RITZ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PARAMOUNT RITZ?

The professionals named in the filing: Architect: GOPINATH; Engineer: CHETHANSIDGIDDI; Chartered Accountant: SATISH R. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARAMOUNT RITZ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARAMOUNT RITZ. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARAMOUNT RITZ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.