RG-MH-30810 · RERA P51700079145 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken
  • Rs 75.00 crore secured on the land, in favour of Maharashtra State Cooperative Bank Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2030Possession promisedmoved 24 months from the original
8 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 85%
318 of 341Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Paradise C H S Ltd is a Others project by Paradise CHS Ltd in Thane, Maharashtra, registered with MahaRERA as P51700079145 on 10 Feb 2025. Possession is promised by 31 Oct 2030. The completion date has moved by 24 months from the original filing. 23 of the 341 units on this registration are recorded sold or booked, and 8 of 44 construction stages are filed complete.

At a glance

Project

  • NameParadise C H S Ltd
  • TypeOthers
  • Location
    • Sector - 7
    • Sanpada -Navi Mumbai
    • Navi Mumbai (M Corp.)
    • Thane
    • 400705
  • Pincode400705
  • RERA no.P51700079145
  • ReraGenie IDRG-MH-30810

Builder

  • NameParadise CHS Ltd
  • Entity typeSociety

Key dates

this monthRegisteredFeb 2025First promiseOct 2028Revised toOct 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Feb 2025
  • Promised completion31 Oct 2030
  • Revised completionRevised to 31 Oct 2030 (originally 31 Oct 2028)
  • Buildings4 building records
  • Documents filed70 files

Current status

7%23 of 341 units booked
18.9%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rehab Tower ANA42281120112
Rehab Tower BNA42281120112
Commercial BlockNA82055
Incentive Tower CNA42281120112

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 85%.

Rehab Tower A32%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)85%
Plinth100%
Stilt Floor68%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Rehab Tower B31%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)77%
Plinth100%
Stilt Floor59%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial Block32%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)82%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Incentive Tower C25%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)77%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed907

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots907
Closed/Covered907
BuildingClosed/CoveredTotal
Rehab Tower A227227
Rehab Tower B227227
Commercial Block227227
Incentive Tower C226226

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area10,266 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofMaharashtra State Cooperative Bank Limited
Secured amountRs 75.00 crore
CERSAI search filedYes
Declared on12 Sep 2025

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI68410.38
Proposed, not sanctioned61,410 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT 88, SECTOR 17 VASHI NEW MUMBAI 400703
Estimated costRs 550.93 cr
Cost incurredRs 104.39 cr
Work done18.95%
BuildingWingEstimatedIncurred
Rehab Tower ANARs 130.85 crRs 25.99 cr
Rehab Tower BNARs 130.85 crRs 25.99 cr
Commercial BlockNARs 130.85 crRs 25.99 cr
Incentive Tower CNARs 130.85 crRs 25.99 cr
-NARs 27.55 crRs 42.15 lakh

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSopan Prabhu
ArchitectSOPAN PRABHU ARCHITECT & PLANNERS
EngineerCSE Consultants
EngineerReci Engineering Pvt. Ltd.
EngineerSK CONSULTANTS & ENGINEERS
EngineerPrathamesh Borkar
Chartered AccountantVikas Abhang & Associates
Chartered AccountantN B SAYED & ASSOCIATES
Chartered AccountantCA Rutuja Narsingh & Associates
PartnerRole in project
Paradise CHS Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12092502572Oct 2028 → Oct 2030

Reason as filed by the promoterConstruction was delayed due to factors beyond the promoter’s control, including intermittent stoppage of work caused by financial liquidity constraints, delayed approvals from concerned authorities, and disruption in availability of labor and construction materials. The promoter has since streamlined funding arrangements and mobilized resources to ensure timely completion of the remaining work. Hence, an extension of the project registration is sought to complete the balance construction in accordance with approved plans.. Given the circumstances, we kindly request an extension until 31-10-20

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2030

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Paradise Chs Ltd as on June 2026.pdf17 Jul 2026
Withdrawal Update Form 2File: Form 2 - Paradise Chs Ltd as on June 2026.pdf17 Jul 2026
Withdrawal Update Form 3File: Form 3 - Paradise Chs Ltd as on June 2026.pdf17 Jul 2026
Form 2A (FY 2025-2026)File: Paradise CHS_Form -2A_FY Year 2025-26.pdf8 Jul 2026
Withdrawal Update Form 1File: Form - 1 Architect Certificate Mar - 2026 (Signed).pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 - Paradise C H S Ltd-as on 31st Mar 2026.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 - Paradise C H S Ltd-as on 31st Mar 2026.pdf24 Apr 2026
Layout approvalFile: Plan - Paradise CHS.pdf19 Feb 2026
Withdrawal Update Form 1File: Form 1 - Paradise C H S Ltd - Dec 2025.pdf14 Jan 2026
Withdrawal Update Form 2File: Form 2 - Paradise C H S Ltd as on Dec 2025.pdf14 Jan 2026
Withdrawal Update Form 3File: Form 3 - Paradise C H S Ltd - Dec 2025.pdf14 Jan 2026
Withdrawal Update Form 1File: Form 1 - Paradise C H S Ltd as on Sep 2025.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 - Paradise C H S Ltd as on Sept 2025.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3 - Paradise C H S Ltd - Sept 2025.pdf20 Oct 2025
Form 1File: Form 1 - Paradise chs ltd as on March 2025.pdf12 Sep 2025
Form 2File: Form 2 - Paradise chs ltd as on March 2025.pdf12 Sep 2025
Form 3File: Form 3 - Paradise chs ltd as on March 2025.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Paradise chs ltd as on March 2025.pdf12 Sep 2025
Withdrawal Update Form 1File: Form 1 - Paradise C H S Ltd as on June 2025.pdf12 Sep 2025
Withdrawal Update Form 2File: Form 2 - Paradise chs ltd as on june 2025 new.pdf12 Sep 2025
Withdrawal Update Form 3File: Form 3 - Paradise C H S Ltd as on June 2025.pdf12 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 2024-25 signed.pdf12 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Paradise CHS Ltd Revised End Use Certificate.pdf18 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Declaration for Unit count.pdf8 Jan 2025
Other - FinanceFile: Declaration for Unit count.pdf8 Jan 2025
Other - FinanceFile: declaration.pdf13 Dec 2024
Proforma of Allotment letterFile: AL_Paradise CHS LTD_06122024.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final First Form 3 - Paradise C H S Ltd revised.pdf12 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation_Allotment.pdf12 Dec 2024
Other - TechnicalFile: Annexure A - Order No 50.pdf12 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation_AFS_11zon.pdf12 Dec 2024
Proforma of Agreement for saleFile: AFS_Execution_Paradise CHS LTD_07122024.pdf12 Dec 2024
CERSAI detailsFile: Declaration of Cersai.pdf11 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured and unsecured finance availed for the project (Revised)_11zon.pdf11 Dec 2024
Building plan approvalFile: Layout Page 2.pdf10 Dec 2024
Building plan approvalFile: Layout Page 3.pdf10 Dec 2024
Building plan approvalFile: Layout Page 4.pdf10 Dec 2024
Building plan approvalFile: Layout Page 5-7.pdf10 Dec 2024
Building plan approvalFile: Layout Page 8-9.pdf10 Dec 2024
Building plan approvalFile: Layout Page 10-11.pdf10 Dec 2024
Building plan approvalFile: Layout Page 12.pdf10 Dec 2024
Building plan approvalFile: Layout Page 13.pdf10 Dec 2024
Building plan approvalFile: Layout Page 14.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 10-11.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 14.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 13.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 12.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 8-9.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 4.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 3.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 2.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 5-7.pdf10 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification Mail - Paradise CHSL.pdf9 Dec 2024
Copy of the legal title reportFile: Final Title Report_03-12-2024_11zon.pdf4 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Finance.pdf4 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Legal.pdf4 Dec 2024
Declaration in FORM BFile: Form B - Promoter.pdf4 Dec 2024
Declaration about Commencement CertificateFile: Format D - Declaration of Commencement Certificate.pdf4 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - All RERA Designated Bank Accounts.pdf4 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Finance.pdf4 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Legal.pdf4 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf4 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Declaration of M S C Bank (Revised).pdf4 Dec 2024
Layout approvalFile: Layout Page 1.pdf20 Nov 2024
Building plan approvalFile: Layout Page 1.pdf20 Nov 2024
PAN CardFile: Paradise PAN CARD AAAAP3651R.pdf20 Nov 2024
Copy of Layout Approval (in case of layout)File: Layout Page 1.pdf20 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: REVISED CC_Letter_Paradise_CHS_03_07_Sanpada_AutoDCR.pdf20 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Page 1.pdf20 Nov 2024
Other - LegalFile: Revalidated Conveyance Deed.pdf20 Nov 2024

How this compares with Thane

7%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Paradise C H S Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sanpada -Navi Mumbai7,600+ in Thane

Builder: Paradise CHS Ltd

Paradise CHS Ltd has 1 registration on MahaRERA, including Paradise C H S Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Paradise C H S Ltd is delayed beyond 31 Oct 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Paradise C H S Ltd?

The registered promoter entity is Paradise CHS Ltd, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Paradise C H S Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Paradise C H S Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Paradise C H S Ltd?

The professionals named in the filing: Architect: Sopan Prabhu; Architect: SOPAN PRABHU ARCHITECT & PLANNERS; Engineer: CSE Consultants; Engineer: Reci Engineering Pvt. Ltd.; Engineer: SK CONSULTANTS & ENGINEERS; Engineer: Prathamesh Borkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Paradise C H S Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Paradise C H S Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Paradise C H S Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.