Home / Browse projects / Mumbai Suburban, Maharashtra / Paradigm Antalya
Paradigm Antalya
By Gajaanan Property Developers Private Limited
RG-MH-03021 · RERA P51800020208 · Last updated on MahaRERA portal: 6 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 65 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Paradigm Antalya is a Others project by Gajaanan Property Developers Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800020208 on 29 Mar 2019. Possession is promised by 30 Dec 2036. 65 complaints are on record with the regulator.
At a glance
Project
- NameParadigm Antalya
- TypeOthers
- Location
- relief Road
- Oshiwara
- Andheri
- Mumbai Suburban
- 400102
- Pincode400102
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800020208
- ReraGenie IDRG-MH-03021
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Mar 2019
- Promised completion30 Dec 2036
- Revised completionNone
- Buildings20 building records
- Documents filed191 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Proposed Sale Building No 4 Wing A | NA | 44 | 36 | 0 | 0 | 0 |
| Proposed Sale Building no 4 Wing B | NA | 44 | 0 | 0 | 0 | 0 |
| Proposed Sale Building no 4 Wing C | NA | 44 | 0 | 0 | 0 | 0 |
| Sale Building no 1A | NA | 40 | 0 | 0 | 0 | 0 |
| Proposed Sale Building no 1 Wing B | NA | 47 | 0 | 0 | 0 | 0 |
| Proposed Sale Building no 1 Wing C | NA | 47 | 0 | 0 | 0 | 0 |
| Proposed Sale Building no 1 Wing D | NA | 47 | 0 | 0 | 0 | 0 |
| proposed Sale Building no 1 Wing E | NA | 47 | 0 | 0 | 0 | 0 |
| Proposed Sale Building No 1 Wing F | NA | 47 | 0 | 0 | 0 | 0 |
| Proposed Sale Building No 1 Wing G | NA | 47 | 0 | 0 | 0 | 0 |
| Paradigm Alaya - Sale Building No 2 Wing A | NA | 44 | 0 | 0 | 0 | 0 |
| Paradigm Alaya - Sale Building No 2 Wing B | NA | 44 | 0 | 0 | 0 | 0 |
| Paradigm Alaya - Sale Building No 2 Wing C | NA | 44 | 0 | 0 | 0 | 0 |
| proposed sale building no 2 wing D | NA | 47 | 0 | 0 | 0 | 0 |
| Proposed Sale Building No 3 Wing A | NA | 47 | 0 | 0 | 0 | 0 |
| Proposed Sale Building No 3 Wing B | NA | 47 | 0 | 0 | 0 | 0 |
| Proposed Sale Building No 3 Wing C | NA | 47 | 0 | 0 | 0 | 0 |
| Proposed Sale Building No 3 Wing D | NA | 47 | 0 | 0 | 0 | 0 |
| Proposed Sale Building No 3 Wing E | NA | 47 | 0 | 0 | 0 | 0 |
| Proposed Sale Building No 3 Wing F | NA | 47 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 220 construction stages are filed complete across 20 buildings. The stage furthest along is Internal walls, at 60%.
Proposed Sale Building No 4 Wing A0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building no 4 Wing B0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building no 4 Wing C0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Sale Building no 1A67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building no 1 Wing B0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building no 1 Wing C0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building no 1 Wing D0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
proposed Sale Building no 1 Wing E0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building No 1 Wing F0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building No 1 Wing G0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Paradigm Alaya - Sale Building No 2 Wing A0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Paradigm Alaya - Sale Building No 2 Wing B0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Paradigm Alaya - Sale Building No 2 Wing C0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
proposed sale building no 2 wing D0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building No 3 Wing A0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building No 3 Wing B0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building No 3 Wing C0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building No 3 Wing D0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building No 3 Wing E0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Sale Building No 3 Wing F0%
| Activity | Progress |
|---|---|
| Excavation | 1% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed280
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Proposed Sale Building No 4 Wing A | 1 | 1 |
| Proposed Sale Building no 4 Wing B | 1 | 1 |
| Proposed Sale Building no 4 Wing C | 1 | 1 |
| Sale Building no 1A | 264 | 264 |
| Proposed Sale Building no 1 Wing B | 1 | 1 |
| Proposed Sale Building no 1 Wing C | 1 | 1 |
| Proposed Sale Building no 1 Wing D | 1 | 1 |
| proposed Sale Building no 1 Wing E | 1 | 1 |
| Proposed Sale Building No 1 Wing F | 1 | 1 |
| Proposed Sale Building No 1 Wing G | 1 | 1 |
| proposed sale building no 2 wing D | 1 | 1 |
| Proposed Sale Building No 3 Wing A | 1 | 1 |
| Proposed Sale Building No 3 Wing B | 1 | 1 |
| Proposed Sale Building No 3 Wing C | 1 | 1 |
| Proposed Sale Building No 3 Wing D | 1 | 1 |
| Proposed Sale Building No 3 Wing E | 1 | 1 |
| Proposed Sale Building No 3 Wing F | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Devang Gandhi Design Studio |
| Engineer | Frames |
| Chartered Accountant | B N Bhadricha & Co |
| Partner | Role in project |
|---|---|
| Gajaanan Property Developers Private Limited | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 8240/2021 | Bombay High Court | Pre Admission |
| 29538/2022 | Bombay High Court | Pre Admission |
Complaints filed with MahaRERA65
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000209567 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | AZHAR SHAKEEL JAMADAR | 21/01/2022 |
| CC006000000209578 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | GULNAAZ ASIF KHAN | 21/01/2022 |
| CC006000000209664 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MOHAMMED ISHAQUE SHAIKH | 21/01/2022 |
| CC006000000209666 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | RABIA BASREEMD HANIF SHAIKH | 21/01/2022 |
| CC006000000251589 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | YASMEEN MOHAMMED RAFIQUE SHAIKH | 29/06/2022 |
| CC006000000251591 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | AKHTAR ALI ASGAR ALI ANSARI | 29/06/2022 |
| CC006000000251593 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | SANIA MEHDI NAQVI | 29/06/2022 |
| CC006000000251603 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | CHANDAN CHANDRAKANT RANE | 29/06/2022 |
| CC006000000251604 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | AMNA DAR | 29/06/2022 |
| CC006000000251687 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | NISAR AHMED SHAIKH MOHAMMED | 08/07/2022 |
| CC006000000251689 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | FATEMA BEGUM NISAR AHMED SHAIKH | 08/07/2022 |
| CC006000000303309 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | SHAKEEL KADAR SHAIKH | 14/11/2022 |
| CC006000000303310 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | JIYAUL KHAN | 14/11/2022 |
| CC006000000303311 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | NIZAR MISTRY | 14/11/2022 |
| CC006000000303316 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | SHALINI BHAVESH MENON | 14/11/2022 |
| CC006000000303317 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | Jarrar Chaudhary and Javed Chaudhary | 14/11/2022 |
| CC006000000334009 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | SHABANA MUSHTAQUE SHAIKH | 27/03/2023 |
| CC006000000334010 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | SANTOSH RAMRAO JADHAV | 27/03/2023 |
| CC006000000334011 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | SADAF MALIKJAAN KHAN | 27/03/2023 |
| CC006000000334012 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | SHAKIL AHMED KHAN | 27/03/2023 |
| CC006000000396116 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | AAKASH NARENDRA BAGADA | 06/07/2023 |
| CC006000000396118 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | JAVED SHAMIM KHAN | 06/07/2023 |
| CC006000000396119 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | SHAMIM AHMED KHAN | 06/07/2023 |
| CC006000000397395 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MRS ZAREEN FATMA MOHAMMAD ATEEQUE SIDDIQUE | 08/09/2023 |
| CC006000000397397 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR MOHAMMAD ATEEQUE SIDDIQUE | 08/09/2023 |
| CC006000000397415 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR SHAIKH ASAD MOHAMMED SHAFIULLAH ANDMRS. RAFAT ASAD SHAIKH | 15/09/2023 |
| CC006000000397416 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MRS AYESHA MOHAMMED ARSHAD ANSARI | 15/09/2023 |
| CC006000000397420 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MRS.AYESHA JAVED SHAIKH AND MR JAVED A.SHAIKH | 15/09/2023 |
| CC006000000397422 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR ABDUL REHMAN LIYAKAT SAYED | 15/09/2023 |
| CC006000000397423 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR.ZULFIKARALI Y. FATTEH AND MR MEHNDIHASAN YAKUB FATTEH | 15/09/2023 |
| CC006000000429384 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR MOHAMMED ALIM KHAN,MR SADDAM HUSSAIN KHAN,MR MOHAMMED GAUS KHAN | 01/03/2024 |
| CC006000000429388 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR KHAN FIROZ AHMED | 01/03/2024 |
| CC006000000480311 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | Mr. Naseem Ahmed Khan | 18/05/2024 |
| CC006000000480316 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | Mr. Ayyub Mohd Yusuf | 18/05/2024 |
| CC006000000480339 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | Mr. Rehan Murad Sayyed | 18/05/2024 |
| CC006000000590959 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR RAHAT KAZMI AND MRS ASIYARAHAT KAZMI | 09/07/2024 |
| CC006000000590963 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR ARIFKHAN,MR ABDULSAMAD SALIM CHAIWALA,MR MOHAMMED WASIM WASIM ABDUL AZIZ KASMANI | 09/07/2024 |
| CC006000000591017 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR . MOHAMMED HANIF ABDUL KADAR SHAIKH MRS BISMILLAH MOHD HANIF SHAIKH | 08/07/2024 |
| CC006000000591026 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR.QMAR ALI FAYYAZ KHAN | 08/07/2024 |
| CC006000000591027 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR.SAMIULLA IBRAHIM MRS YASMEEN SAMIULLA SAUDAGAR | 08/07/2024 |
| CC006000000591029 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MRS SARTAJ ABDUL REHMAN QURESHI | 08/07/2024 |
| CC006000000591253 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR. SARFARAZ HUSAIN ZAHID HUSAIN ANSARI | 25/07/2024 |
| CC006000000591257 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR . MAQSOOD MAQBOOL KHAN | 25/07/2024 |
| CC006000000591260 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR MOHAMMED LATIF UMAR SHAIKH AND MRS MARIYAMBI LATIF SHAIKH | 25/07/2024 |
| CC006000000591262 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MS SHENAAZ ARA AKBAR ALI AND MR AKBAR ALI | 25/07/2024 |
| CC006000000591263 | GAJAANAN PROPERTY DEVELOPERS PRIVATE LIMITED | MR NAUSHAD R. ANSARI AND MRS ANSARI RUBINA NAUSHAD | 25/07/2024 |
| CC006000000479880 | Mohammad Naved Mirza | Gajaanan Property Developers Private Limited | 21/04/2024 |
| CC12401067 | Gajaanan Property Developers Private Limited | SAEED AHMED KHAN (Respondent) | 07/12/2024 |
| CC12400697 | Preeti Jatindar Malhotra | Gajaanan Property Developers Private Limited | 07/11/2024 |
| CC12401068 | Gajaanan Property Developers Private Limited | MR KASEEM AHMED KHAN | 07/12/2024 |
| CC12500023 | Gajaanan Property Developers Private Limited | MUKHIDA SAYROZ HASANALI AND MUKHIDA MANISHA SAYROZ | 03/01/2025 |
| CC12500024 | Gajaanan Property Developers Private Limited | ASHWIN ATMARAM SALUNKE AND MITALI ASHWIN SALUNKE | 03/01/2025 |
| CC12500029 | Gajaanan Property Developers Private Limited | ABDUL RAZZAQUE HASAN ALI SHAIKH and AFSANA SHAIKH | 03/01/2025 |
| CC12500028 | Gajaanan Property Developers Private Limited | ABDUL RAZZAQUE HASAN ALI SHAIKH and AFSANA SHAIKH | 03/01/2025 |
| CC12500027 | Gajaanan Property Developers Private Limited | HUMAIRA AKRAM QURESHI | 03/01/2025 |
| CC12500026 | Gajaanan Property Developers Private Limited | ISHA ALEEM RAZA | 03/01/2025 |
| CC12500025 | Gajaanan Property Developers Private Limited | MR SANDEEP KRISHNA GOWDA MRS TRUPTI SANDEEP GOWDA | 03/01/2025 |
| CC12500868 | KAMIL AHMED TAUFIQUE AHMED SHAIKH | Gajaanan Property Developers Private Limited | 13/03/2025 |
| CC12600333 | Gajaanan Property Developers Private Limited | VIJAY SINGH UJAGAR SINGH BALI | 17/01/2026 |
| CC12600332 | Gajaanan Property Developers Private Limited | UTTAM KUMAR CHATTOPADHYAY | 17/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2036
Documents filed191
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 191 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Paradigm Anatalya as on March 2025.pdf | 6 Jul 2026 |
| Form 2File: Form 2 - Paradigm Anatalya as on March 2025.pdf | 6 Jul 2026 |
| Form 3File: Form 3 - Paradigm Anatalya as on March 2025.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Paradigm Antalya as on March 2025.pdf | 6 Jul 2026 |
| OthersFile: Anantala Plan and Part Oc.pdf | 6 Jul 2026 |
| Form 1File: Antalya - Form 1 Dec 2025.pdf | 23 Jun 2026 |
| Form 2File: Antalya - Form 2 - Dec 2025.pdf | 23 Jun 2026 |
| Form 3File: Antalya - Form 3 Dec 2025 (Compressed).pdf | 23 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 -.pdf | 23 Jun 2026 |
| Form 1File: Antalya - Form 1 March 2026.pdf | 23 Jun 2026 |
| Form 2File: Antalya - Form 2 of March 2026.pdf | 23 Jun 2026 |
| Form 3File: Antalya - Form 3 March 2026.pdf | 23 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Antalya - Circular-29 March 2026.pdf | 23 Jun 2026 |
| Form 1File: Form 1 - Paradigm Antalya as on Sep 2025.pdf | 15 Jun 2026 |
| Form 2File: Form 2 - Paradigm Antalya as on Sep 2025.pdf | 15 Jun 2026 |
| Form 3File: Form 3 - Paradigm Antalya as on Sep 2025.pdf | 15 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Paradigm Antalya as on Sep 2025.pdf | 15 Jun 2026 |
| Form 1File: Form 1 - Paradigm Antalya as on June 2025_compressed.pdf | 26 May 2026 |
| Form 2File: Form 2 - Paradigm Antalya as on June 2025_compressed.pdf | 26 May 2026 |
| Form 3File: Form 3 - Paradigm Antalya as on June 2025.pdf | 26 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Paradigm Antalya as on June 2025.pdf | 26 May 2026 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY ASSURANCE FORM 2A RERA 2023 - 2024.pdf | 24 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Antalya sold unsold till March 2025.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Alaya sold unsold till March 2025.pdf | 18 Apr 2025 |
| Details of encumbrancesFile: Declaration on Encumbrance.pdf | 11 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 April 2023 to June 2023.pdf | 11 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 July to Sept 2023.pdf | 11 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Oct 2023 to Dec 2023.pdf | 11 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jan 2024 to March 2024.pdf | 11 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 April 2024 to June 2024.pdf | 11 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 July 2024 to Sept 2024.pdf | 11 Apr 2025 |
| Declaration about Commencement CertificateFile: Declaration on CC.pdf | 11 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi July Sept 19.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi April June 19.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi July Sept 22.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi April June 22.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi Jan March 22.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi Oct Dec 21.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi July Sept 21.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi April June 21.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi Jan March 21.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi Oct Dec 20.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi July Sept 20.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi Jan March 20.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certi Oct Dec 19.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 March'2024.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 March 2023.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 2022.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Sept 2022.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 June 2022.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 March 2022.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 2021.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Sep 2021.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 March 2021.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 June 2021.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 June 2019.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Sept 2019.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 2019.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Mar 2020.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 June 2020.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Sep 2020.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 2020.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jan to March 2023.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Oct to Dec 2022.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 July to Sept 2022.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 April to June 2022.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 April to June 2020.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jan to March 2022.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Oct to Dec 2021.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 July to Sept 2021.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 April to June 2021.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jan to March 2021.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Oct to Dec 2020.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 July to Sept 2020.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jan to March 2020.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Oct to Dec 2019.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 July to Sept 2019.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Apr to June 2019.pdf | 9 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Antalya April 2022 to March 2023.pdf | 9 Apr 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| CASA PALAZZOP51800008441 | Borivali (East), Mumbai Suburban | Aug 2017 | Completed | Feb 2022Registered original: Mar 2019 | Jan 1970 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 191 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Paradigm Antalya on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Oshiwara6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 324 registered projects within 2 km.
ROSWALT ZAIDEN
A S HIGHTECH LLP
Dream Signature
Prime Realtors
Sayba Noor
Star Raises
Gurukrupa Ekam
GURUKRUPA REALCON INFRABUILD LLP
The Westpark Phase-1
WESTPARK DEVELOPERS PRIVATE LIMITED
Kalpataru Hrushikesh
Kalpataru Townships Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Gajaanan Property Developers Private Limited
Gajaanan Property Developers Private Limited has 2 registrations on MahaRERA, including Paradigm Antalya and Arkan. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Paradigm Antalya is delayed beyond 30 Dec 2036?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Paradigm Antalya?
The registered promoter entity is Gajaanan Property Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Paradigm Antalya?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Paradigm Antalya?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Paradigm Antalya?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Paradigm Antalya?
The professionals named in the filing: Architect: Devang Gandhi Design Studio; Engineer: Frames; Chartered Accountant: B N Bhadricha & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Paradigm Antalya?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback