Home / Browse projects / Mumbai Suburban, Maharashtra / Paradigm Anantaara

Registered No litigation declared Others project

Paradigm Anantaara

By Shubhyuvi Infrastructure LLP

RG-MH-66397 · RERA P51800034854 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
1Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

Paradigm Anantaara is a Others project by Shubhyuvi Infrastructure LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034854 on 28 Apr 2022. Possession is promised by 31 Dec 2030. 1 complaint is on record with the regulator.

At a glance

Project

  • NameParadigm Anantaara
  • TypeOthers
  • Location
    • Chikuwadi Road
    • Laxman Bhandari marg
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800034854
  • ReraGenie IDRG-MH-66397

Builder

  • NameShubhyuvi Infrastructure LLP
  • Entity typeOthers
  • Named personsParth Mehta, Swadesh Anand

Key dates

this monthRegisteredApr 2022PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2022
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings3 building records
  • Documents filed136 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Segment I of Sale Building from Ground to 30th FloorsNA4332000
Segment II of Sale Building 31st to 40th FloorsNA430000
Segment III of Sale Building 41st floor and aboveNA430000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

Segment I of Sale Building from Ground to 30th Floors0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Segment II of Sale Building 31st to 40th Floors0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Segment III of Sale Building 41st floor and above0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed189

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots189
Closed/Covered189
BuildingClosed/CoveredTotal
Segment I of Sale Building from Ground to 30th Floors155155
Segment II of Sale Building 31st to 40th Floors1414
Segment III of Sale Building 41st floor and above2020

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,110 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityLUM REHABILITÁTION AUTHORITY
Permissible FSI41217.0
Proposed, not sanctioned17,015 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGlacisTower Basement and Ground Floor Plot No 391 CST No E1271 Linking Road Khar W Mumbai 400052

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAspire Architects & Consultants
EngineerFrames
Chartered AccountantB N Bhadricha & Co
PartnerRole in project
Shubhyuvi Infrastructure LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600348Bhakti AchrekarShubhyuvi Infrastructure LLP22/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Paradigm Anantaara as on June 2025.pdf23 Jun 2026
Form 2File: Anantaara - Form 2 - June 2025.pdf23 Jun 2026
Form 3File: Form 3 - CA Certificate - 30 06 25_Signed.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Paradigm Anantaara as on June 202544.pdf23 Jun 2026
Form 1File: Form 1 September 2025.pdf23 Jun 2026
Form 2File: Form 2 - Engineer Certificate - Anantaara - Sept 2025.pdf23 Jun 2026
Form 3File: Form 3 - CA Certificate - Sept 25_Signed.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Anantaara - Circular 29 Sept 2025.pdf23 Jun 2026
Form 1File: Anantaara - Form 1 - Dec 2025.pdf23 Jun 2026
Form 2File: Anantaara - Form 2 Dec 2025.pdf23 Jun 2026
Form 3File: Form 3 - CA Certificate - 31 12 2025.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Anantaara Circular 29 - Dec 2025.pdf23 Jun 2026
Form 1File: Form 1 - Anantaara March 2026.pdf23 Jun 2026
Form 2File: Form 2 - March 2026 - Anantaara.pdf23 Jun 2026
Form 3File: Form 3 - CA Certificate - 31 03 26 Anantaara.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Anantaara March 2026.pdf23 Jun 2026
Layout approvalFile: Plan 1_11zon_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 2_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 3_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 4_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 5_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 6_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 7_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 8_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 9_11zon_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 10_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 11_11zon_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 12_11zon_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 13_11zon_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 14_11zon_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 15_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 16_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 17_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 18_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 19_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 20_11zon.pdf14 Jul 2025
Building plan approvalFile: Plan 21_11zon.pdf14 Jul 2025
Copy of Layout Approval (in case of layout)File: Plan 1_11zon_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 11_11zon_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 21_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 20_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 19_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 18_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 17_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 16_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 15_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 14_11zon_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 13_11zon_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 12_11zon_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 10_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 9_11zon_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 8_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 7_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 6_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 5_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 4_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3_11zon.pdf14 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2_11zon.pdf14 Jul 2025
Details of encumbrances concerned to FinanceFile: Details of Encumbrance - Shubhyuvi - IndusInd - signed.pdf18 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Anantaara FCC upto 10 th floor dated 15-01-2024.pdf18 Mar 2025
Details of encumbrances concerned to LegalFile: Details of Encumbrance - Shubhyuvi - IndusInd - signed.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec'2023.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar'2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June' 2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept' 2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec'2024.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: Shubhyuvi sold Unsold till dec 2024.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Anantaara sold unsold till sept 2024.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: Anantaara sold unsold till june 2024.pdf5 Aug 2024
Disclosure of sold/ booked inventoryFile: Anantaara sold unsold inventory Mar 2024.pdf5 Jun 2024
Proforma of Agreement for saleFile: RERA Agreement Anantaara Final.pdf6 Mar 2024
Deviation Report with respect to model copy of AgreementFile: RERA Agreement Anantaara Deviation Highlighted.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM-1 July-Sept 2023 Shubhyuvi.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM-1 Oct-Dec 2023 Shubhyuvi.pdf28 Feb 2024
Disclosure of sold/ booked inventoryFile: Anantaara sold unsold - Dec 2023.pdf28 Feb 2024
Details of encumbrances concerned to FinanceFile: Anantaara - Finance Encumbrances.pdf18 Dec 2023
Details of encumbrances concerned to LegalFile: Anantaara - Finance Encumbrances.pdf18 Dec 2023
Building plan approvalFile: Amended IOA 1.pdf27 Oct 2023
Building plan approvalFile: Amended IOA 4.pdf27 Oct 2023
Building plan approvalFile: Amended IOA 13.pdf27 Oct 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Paradigm Anantaara on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Laxman Bhandari marg6,700+ in Mumbai Suburban

2 kmParadigm AnantaaraCompleted 159Lapsed / revoked 93Other 221Dot size: filed unitsN

Filed coordinates, straight-line distance. 473 registered projects within 2 km.

Builder: Shubhyuvi Infrastructure LLP

Shubhyuvi Infrastructure LLP has 1 registration on MahaRERA, including Paradigm Anantaara. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Paradigm Anantaara is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Paradigm Anantaara?

The registered promoter entity is Shubhyuvi Infrastructure LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Paradigm Anantaara?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Paradigm Anantaara?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Paradigm Anantaara?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Paradigm Anantaara?

The professionals named in the filing: Architect: Aspire Architects & Consultants; Engineer: Frames; Chartered Accountant: B N Bhadricha & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Paradigm Anantaara?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Paradigm Anantaara. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Paradigm Anantaara to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.