Home / Browse projects / Pune, Maharashtra / Pankaj Aasmaan Phase III
Pankaj Aasmaan Phase III
RG-MH-72408 · RERA P52100016512 · Last updated on MahaRERA portal: 17 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 62 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Pankaj Aasmaan Phase III is a Residential / Group Housing project by Pankaj Developers in Pune, Maharashtra, registered with MahaRERA as P52100016512 on 21 May 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 62 months from the original filing. 91 of the 120 units on this registration are recorded sold or booked, and 44 of 44 construction stages are filed complete.
At a glance
Project
- NamePankaj Aasmaan Phase III
- TypeResidential / Group Housing
- Location
- Lohagoan Wagholi Road
- Sant Nagar
- LOHGAON
- Haveli
- Pune
- 411047
- Pincode411047
- RERA no.P52100016512
- ReraGenie IDRG-MH-72408
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 May 2018
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 1 Oct 2021)
- Buildings4 building records
- Documents filed125 files
Current status
Figures as on 17 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| J | NA | 5 | 4 | 32 | 0 | 32 |
| I | NA | 5 | 4 | 32 | 0 | 32 |
| F | NA | 5 | 4 | 32 | 0 | 32 |
| E | NA | 5 | 4 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
44 of 44 construction stages are filed complete across 4 buildings.
J100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
I100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
F100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 20% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 50% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 25% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 0% |
Parking filed120
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| J | 32 | 32 |
| I | 32 | 32 |
| F | 32 | 32 |
| E | 24 | 24 |
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Pandurang Eknath Khese | LOHGAON | Pune |
| Baban Mahadev Khese | LOHGAON | Pune |
| Sandeep Raghunath Garud | LOHGAON | Pune |
| Pankaj Developers | Hadapsar | Pune |
| Sambaji Damodar Garud | LOHGAON | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| J | NA | Rs 4.56 cr | Rs 4.56 cr |
| I | NA | Rs 4.55 cr | Rs 4.55 cr |
| F | NA | Rs 4.55 cr | Rs 4.55 cr |
| E | NA | Rs 3.49 cr | Rs 3.49 cr |
| - | NA | Rs 77.26 lakh | Rs 47.90 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ankur Associates |
| Engineer | Ajit Popatrao Mahadik |
| Chartered Accountant | SS YelawandeAssociates |
| Chartered Accountant | SPCM and Associates |
| Chartered Accountant | RSMS AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| Pankaj Developers | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterI, Anil Ramrao Gogavale Partner of M/s Pankaj Developers having Maha RERA registered project Pankaj Aasmaan Phase III with Maha RERA registration No.P52100016512 hereby declare that while initial registration there was typo error in respect of Proposed Date of Completion. The Proposed Date of Completion as per Maha RERA Registration Certificate was 1-April-2021 which was due to Typo Error and should be considered as 1-April-2022. Further due to COVID-19 pandemic situation the proposed date of completion should be considered as 1-October-2022 after considering universal extension extended to al
Reason as filed by the promoterDue to COVID Pandemic project has been delayed. So we are requesting you to please Extent project completion Date up to 30/09/2024
Reason as filed by the promoterRespected Sir, We are providing you an update on the construction progress of our project. Despite the challenges of COVID-19 pandemic, We informing you that we have successfully completed 99% of the construction work. Currently, we are working on completing the common amenities and obtaining the completion certificate. We kindly request an extension of our project deadline until December 31, 2026. This extension will allow us to finalize the remaining tasks and ensure the successful completion of the project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 May 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 May 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed125
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A Phase III.pdf | 17 Jun 2026 |
| Withdrawal Update Form 1File: Phase III Architect.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Phase III.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: CA Phase III.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate Phase III.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: Form-2 Phase III.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate Form III.pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: Phase III.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Phase III.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: Phase III.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Architec Certificate Phase III.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Phase III.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: CA Phase III.pdf | 20 Apr 2026 |
| Form 2A (FY 2024-2025)File: Phase III Form 2A.pdf | 28 Oct 2025 |
| Form 2A (FY 2024-2025)File: Phase III Form 2A.pdf | 28 Oct 2025 |
| Form 5 (FY 2024-2025)File: From 5 Phase III.pdf | 14 Oct 2025 |
| Form 1File: ARCHITECTS CERTIFICATE PHASE--lll.pdf | 30 May 2025 |
| Form 2File: Engineer Certificate Phase III.pdf | 30 May 2025 |
| Form 3File: CA Certificate Phase III.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold & Unsold - Phase III.pdf | 30 May 2025 |
| Declaration in FORM BFile: Affidavit cum Declaration (RERA).pdf | 23 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration.pdf | 13 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 12 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: Model Agreement to Sale.pdf | 12 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Pankaj Developers- No Dues Prachay.pdf | 11 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Phase-III.pdf | 11 Nov 2024 |
| Certificates of CA (Form 3)File: CA Phase III .pdf | 11 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE, Phase III.pdf | 11 Nov 2024 |
| Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER.pdf | 11 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Pankaj Developers- No Dues Prachay.pdf | 11 Nov 2024 |
| Proforma of Agreement for saleFile: Agreement Draft.pdf | 11 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Phase III.pdf | 11 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate Phase III.pdf | 29 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Phase III.pdf | 23 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Phase III.pdf | 23 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Phase-III.pdf | 23 Jul 2024 |
| Certificates of CA (Form 3)File: CA Certificate Phase III.pdf | 23 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Phase III.pdf | 20 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE Phase III.pdf | 20 Jun 2024 |
| Certificates of CA (Form 3)File: CA Certificate Phase III.pdf | 20 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Rera Phase III.pdf | 20 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Phase III- 31-12-2023 Sold Unsold.pdf | 15 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Phase III 31-12-2023.pdf | 10 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Phase III- 31-12-2023.pdf | 10 Jan 2024 |
| Certificates of CA (Form 3)File: CA Certificate Phase-III 31-12-2023.pdf | 10 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Phase III.pdf | 4 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase III 30-09-2023.pdf | 29 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Phase III 30-09-2023.pdf | 29 Nov 2023 |
| Certificates of CA (Form 3)File: CA Certificate Phase III- 30-09-2023.pdf | 29 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase- III (30th June 2023).pdf | 1 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase - III June-2023.pdf | 1 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Phase III 2022-23.pdf | 1 Sep 2023 |
| Certificates of CA (Form 3)File: CA Cert Phase- III June 2023.pdf | 1 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase III - March 23.pdf | 4 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase III - March 23.pdf | 4 May 2023 |
| Certificates of CA (Form 3)File: Form 3 Phase III - March 23.pdf | 4 May 2023 |
| Declaration about Commencement CertificateFile: Form D Commencement Cert Phase III.pdf | 21 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Phase III 2019-20.pdf | 21 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Phase III 2020-21.pdf | 21 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Phase III 2021-22.pdf | 21 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase III March 2019.pdf | 8 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase III March 2020.pdf | 8 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase III March 2021.pdf | 8 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase III Sept 2022.pdf | 8 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase III Dec 2022.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase III March 2019.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase III March 2020.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase III March 2021.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase III March 2022.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase III Sep 22.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase III Dec 2022.pdf | 8 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Phase - III Up to Dec 2022.pdf | 8 Apr 2023 |
| Certificates of CA (Form 3)File: CA Certificate March 2019.pdf | 8 Apr 2023 |
| Certificates of CA (Form 3)File: CA Certificate March 2020.pdf | 8 Apr 2023 |
| Certificates of CA (Form 3)File: CA Certificate March 2021.pdf | 8 Apr 2023 |
| Certificates of CA (Form 3)File: CA Certificate Sept 2022.pdf | 8 Apr 2023 |
| Certificates of CA (Form 3)File: CA Certificate Dec 2022.pdf | 8 Apr 2023 |
| Declaration about Commencement CertificateFile: Declaration Phase- III.pdf | 17 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect certificate phase 3 up to March 2022_compressed.pdf | 17 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase III.pdf | 17 Oct 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Pankaj Aasmaan phase 1 | 72 73 lohegaon Haveli Pune | 119 | Completed | Dec 2019 | Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations, which the RERA portal never shows together
- All 125 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Pankaj Aasmaan Phase III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sant Nagar13,700+ in Pune
NESTERRA - PHASE 1
Triaa Skyscrapers LLP
Divine Garden Phase II
SHRIRAM ASSOCIATES
Divine Garden Phase 1
SHRIRAM ASSOCIATES
Solitaire Business Hub Viman Nagar Phase 1
Classic Promoters and Builders Private Lim
Krishna Lake Town
Krishna Housing
NIVASA ENCHANTE - PHASE I
NIVASA ASSOCIATES
Builder: Pankaj Developers
Pankaj Developers has 7 registrations on MahaRERA, including Pankaj Aasmaan Phase II and Pankaj Aasmaan Phase I. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Pankaj Aasmaan Phase III is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Pankaj Aasmaan Phase III?
The registered promoter entity is Pankaj Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Pankaj Aasmaan Phase III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Pankaj Aasmaan Phase III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Pankaj Aasmaan Phase III?
The professionals named in the filing: Architect: Ankur Associates; Engineer: Ajit Popatrao Mahadik; Chartered Accountant: SS YelawandeAssociates; Chartered Accountant: SPCM and Associates; Chartered Accountant: RSMS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Pankaj Aasmaan Phase III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback