ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / PALM CITY

Registered No litigation declared Residential / Group Housing project

PALM CITY

By ASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.

RG-MH-57137 · RERA P50500015376 · Last updated on MahaRERA portal: 20 Jul 2024

Source: official MahaRERA filing

Red flags

  • 47 complaints at MahaRERA
  • Completion date moved by 69 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 69 months from the original
46 of 110Construction stages doneacross 10 buildings; furthest along: Staircases, 80%
47Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

PALM CITY is a Residential / Group Housing project by ASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500015376 on 20 Feb 2018. Possession is promised by 31 Dec 2028. The completion date has moved by 69 months from the original filing. 47 complaints are on record with the regulator.

At a glance

Project

  • NamePALM CITY
  • TypeResidential / Group Housing
  • Location
    • WARDHA ROAD
    • GAWSI MANAPUR
    • Gawasi Manapur
    • Nagpur (Rural)
    • Nagpur
    • 440022
  • Pincode440022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500015376
  • ReraGenie IDRG-MH-57137

Builder

  • NameASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.
  • Entity typeCompany
  • Managing DirectorsGIRISH MOTILAL JAISWAL, AJAY KRISHNAMOHAN JAISWAL
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2018First promiseMar 2023Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Feb 2018
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Mar 2023)
  • Buildings10 building records
  • Documents filed96 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAVENDERNA10000
AMEYANA10000
RIDDHESHNA50000
ALEXANDERNA10000
PEARLNA10000
GANESHNA10000
ANKUSHNA50000
PARADISE 1NA10000
PARADISE 2NA10000
PARADISE 3NA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 20 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

46 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Staircases, at 80%.

LAVENDER88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
AMEYA77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
RIDDHESH85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
ALEXANDER85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
PEARL88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
GANESH85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
ANKUSH85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
PARADISE 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PARADISE 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PARADISE 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes70%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed946

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots946
Closed/Covered2
Open Space944
BuildingClosed/CoveredOpen SpaceTotal
LAVENDER0118118
AMEYA0118118
RIDDHESH101
ALEXANDER0118118
PEARL0118118
GANESH0118118
ANKUSH101
PARADISE 10118118
PARADISE 20118118
PARADISE 30118118

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area27,876 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1.0
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHHATRAPATI SQ WARDHA ROAD NAGPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectALOK LUNIA
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
ASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500020909Mar 2023 → Dec 2028

Reason as filed by the promoterAs per Order No. 40 Dated 27/12/2022 we are applying for Extension without majority consents of the allottees

EXT50500015160Mar 2023 → Mar 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19

Complaints filed with MahaRERA47

Case no.ComplainantRespondentFiled
CC004000000030156Bharati Jainendra BaranwalM/S Ashtavinayak Planners & Developers Pvt Ltd18/11/2019
CC004000000030157Trilokinath Devkrushna ChaturvediM/s Ashtavinayak Planners and Developers Pvt Ltd18/11/2019
CC004000000030159Jainendra Kumar BaranwalM/s Ashtavinayak Planners and Developers Pvt Ltd18/11/2019
CC004000000030158Ashishkumar Premshankar ShrivastavM/s Ashtavinayak Planners and Developers Pvt Ltd18/11/2019
CC004000000030414ANJANA MANOJ CHOUDHARYM/S ASHTAVINAYAK PLANNERS AND DEVELOPERS09/08/2022
CC004000000030415ARUNIMA MANOJ CHOUDHARYM/S ASHTAVINAYAK PLANNERS AND DEVELOPERS09/08/2022
CC004000000030416SANJAY NAGORAO DHOKEM/S ASHTAVINAYAK PLANNERS AND DEVELOPERS13/08/2022
CC004000000030475SANJAY MURLIDHAR NIMJEM/S ASHTAVINAYAK PLANNERS AND DEVELOPERS08/04/2023
CC004000000030477RUPESH CHANDRABHAN ASWANIM/S ASHTAVINAYAK PLANNERS AND DEVELOPERS08/04/2023
CC004000000030484JAINENDRA KUMAR BARANWALM/S ASHTAVINAYAK PLANNERS AND DEVELOPERS08/04/2023
CC004000000030492JITENDRA RAMESH FURSULEM/S ASHTAVINAYAK PLANNERS AND DEVELOPERS18/03/2023
CC004000000030493VINAYAK VYANKATESH KEWADKARM/S ASHTAVINAYAK PLANNERS AND DEVELOPERS18/03/2023
CC004000000030494ASHISHKUMAR PREMSHANKAR SHRIVASTAVAM/S ASHTAVINAYAK PLANNERS AND DEVELOPERS22/03/2023
CC004000000110610JAYANT MADHUKARRAO JOSHIM/S ASHTAVINAYAK PLANNERS & DEVELOPERS PVT LTD THROUGH ITS DIRECTORS GIRISH JAISWAL & AJAY JAISWAL26/06/2024
CC004000000110612VINOD KESHAORAO BHOYARM/S ASHTAVINAYAK PLANNERS & DEVELOPERS PVT LTD THROUGH ITS DIRECTORS GIRISH JAISWAL & AJAY JAISWAL26/06/2024
CC004000000110615KAJAL AJIT GANGULYM/S. ASHTAVINAYAK PLANNERS & DEVELOPERS PVT LTD THROUGH ITS DIRECTORS GIRISH JAISWAL & AJIT JAISWAL13/08/2024
CC004000000110617VILAS TUKARAM LIMAJEM/S. ASHTAVINAYAK PLANNER & DEVELOPERS PVT LTD THROUGH ITS DIRECTORS GIRISH JAISWAL & AJIT JAISWAL15/07/2024
CC004000000110619Shishirkant Ramesh SharmaM/S ASHTAVINAYAK PLANNERS AND DEVELOPERS PVT LTD THROUGH ITS DIRECTORS GIRISH JAISWAL & AJAY JAISWAL08/07/2024
CC004000000110620ROHAN DIWAKAR GONNADEM/S ASHTAVINAYAK PLANNERS & DEVELOPERS PVT LTD THROUGH ITS DIRECTORS GIRISH JAISWAL & AJAY JAISWAL08/07/2024
CC004000000110623SAURABH SUNIL GUJARM/S. ASHTAVINAYAK PLANNERS & DEVELOPERS THROUGH ITS DIRECTORS SHRI GIRISH JAISWAL & AJAY JAISWAL15/07/2024
CC004000000110624BHUMA PRAKASH IYERM/S. ASHTAVINAYAK PLANNERS & DEVELOPERS THROUGH ITS DIRECTORS GIRISH JAISWAL & AJAY JAISWAL15/07/2024
CC004000000110635M/s Ashtavinayak Planners & Developer Pvt. LtdTRILOKINATH D. CHATURVEDI22/07/2024
CC004000000110637VIVEK DEORAO JOSHIM/S ASHTAVINAYAK PLANNERS & DEVELOPERS THROUGH ITS DIRECTORS GIRISH JAISWAL & AJAY JAISWAL13/08/2024
CC12400007SHYAMSUNDER YESHWANTRAO GADEASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.02/09/2024
CC12400195UDAY JAGANNATH KULKARNIASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.23/09/2024
CC12400737PRASHANT NAMDEORAO LADHIASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.12/11/2024
CC12500181ARCHANA RAJESH RATKANTHIWARASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.20/01/2025
CC12500199Nikita Sandeep DeopareASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.21/01/2025
CC12500232SANJAY TIKARAM PUSTOLEASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.23/01/2025
CC12500837ABHAY HARIPRASAD JAISWALASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.11/03/2025
CC12500843KISHOR KESHAO CHOUDHARIASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.11/03/2025
CC12501498NAGARAO MARATRAO PARATEASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.05/05/2025
CC12501497VIJAY LALUSA KADHANEASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.05/05/2025
CC12501623GAURAO DEWANAND AGADEASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.19/05/2025
CC12501927VANDANA SAHEBRAO VIJAYKARASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.12/06/2025
CC12502059Neha Nagendra SinghASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.24/06/2025
CC12503322PRASHANT NAMDEORAO LADHIASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.17/09/2025
CC12503377CHANDRA MOHON PAULASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.22/09/2025
CC12503379CHANDRA MOHON PAULASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.22/09/2025
CC12503789MOHAN GAJANAN MAINKARASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.30/10/2025
CC12503791SATISH SHIVHAREASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.30/10/2025
CC12600355MSS NAGARAJU MEESALA NAGARAJUASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.19/01/2026
CC12601540Rajesh Rajendra PandeyASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.20/03/2026
CC12601593DEEPA VIJAYKUMAR LALWANIASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.22/03/2026
CC12601599MOTIRAM BHAGWAN JIBHAKATEASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.22/03/2026
CC12602607Swapnil Omprakash GawhaneASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.04/05/2026
CC12602861GAURAV HARSWARUP PANDEYASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.15/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jan 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 26 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Jul 2024
Certificates of CA (Form 3)File: 19 Certificates of CA (Form 3) (1).pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 24 Paradise included.pdf14 Jun 2024
Declaration in FORM BFile: Form B.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2023.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2020.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2021.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2022.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2023.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 june 2023.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sept 2023.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2023.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf5 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf5 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf5 Jun 2024
CERSAI detailsFile: CERSAI Declaration.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 june 2023.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 Sept 2023.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 Dec 2023.pdf5 Jun 2024
Certificates of CA (Form 3)File: Form 3 March 2024.pdf5 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf5 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Format Form 5 Palm City FY 22-23.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Palm City as on March 2024.pdf19 Apr 2024
Certificates of CA (Form 3)File: Form 3 - Palm City as on 31-03-2024.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on Sept 2023- Palm City.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on Sept 2023- Palm City.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Palm City as on Dec 2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on Sept 2023- Palm City.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on Sept 2023- Palm City.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Palm City as on Dec 2023.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3 - Palm City as on 30-09-2023.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3 - Palm City as on Dec 2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on June 2023- Palm City.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form 3 - Palm City as on 30-06-2023.pdf22 Nov 2023
Declaration in FORM BFile: Form B Palm City.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3- Palm City as on March 2018_compressed.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3- Palm City as on March 2019_compressed.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3- Palm City as on March 2020_compressed.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3- Palm City as on March 2021_compressed.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3- Palm City as on December 2021_compressed.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3- Palm City as on March 2022_compressed.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3- Palm City as on June 2022_compressed.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3- Palm City as on September 2022_compressed.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3- Palm City as on December 2022_compressed.pdf27 May 2023
Certificates of CA (Form 3)File: Form 3- Palm City as on March 2023_compressed (1).pdf27 May 2023
Declaration about Commencement CertificateFile: Format d - Palm city.pdf26 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 2023_compressed.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on March 2018- Palm City.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on March 2019- Palm City.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on March 2020- Palm City.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on March 2021- Palm City.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on December 2021- Palm City.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on March 2022- Palm City.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on June 2022- Palm City.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on September 2022- Palm City.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on December 2022- Palm City.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on March 2023- Palm City.pdf26 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-2020.pdf26 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-2021.pdf26 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-2022.pdf26 May 2023
Disclosure of sold/ booked inventoryFile: Circular 29 _compressed.pdf26 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form5 17-18.pdf26 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18 - 19 .pdf26 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf26 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf26 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf26 May 2023
Details of encumbrancesFile: INCUMBRANCES PALM CITY - Copy.pdf5 Feb 2018
OtherFile: Flat Cost Date Palm City Site.pdf5 Feb 2018
Layout approvalFile: MAP OF PALM CITY.pdf12 Jan 2018
Building plan approvalFile: BUILDING PLAN (2).pdf12 Jan 2018
Building plan approvalFile: BUILDING PLAN (3).pdf12 Jan 2018
Building plan approvalFile: BUILDING PLAN (4).pdf12 Jan 2018
Building plan approvalFile: BUILDING PLAN (5).pdf12 Jan 2018
Building plan approvalFile: BUILDING PLAN (6).pdf12 Jan 2018
Building plan approvalFile: BUILDING PLAN (7).pdf12 Jan 2018

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 69 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PALM CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GAWSI MANAPUR2,800+ in Nagpur

Builder: ASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD.

ASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD. has 1 registration on MahaRERA, including PALM CITY. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if PALM CITY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PALM CITY?

The registered promoter entity is ASHTAVINAYAK PLANNERS & DEVELOPERS PVT.LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PALM CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PALM CITY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PALM CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PALM CITY?

The professionals named in the filing: Architect: ALOK LUNIA; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PALM CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PALM CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PALM CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.