Home / Browse projects / Mysore, Karnataka / Palacia I Greens -A2
Palacia I Greens -A2
By SAMUDAY CONSTRUCTION AND DEVELOPERS MYSORE
RG-KA-83688 · RERA PRM/KA/RERA/1268/378/PR/161225/008339 · Last updated on RERA Karnataka portal: 25 Jul 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Palacia I Greens -A2 is a Residential/Group Housing project by SAMUDAY CONSTRUCTION AND DEVELOPERS MYSORE in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/161225/008339 on 16 Dec 2025. Possession is promised by 31 May 2028. 7 of the 27 units on this registration are recorded sold or booked, and 5 of 16 construction stages are filed complete.
At a glance
Project
- NamePalacia I Greens -A2
- TypeResidential/Group Housing
- Location
- MYSORE
- 570006
- Pincode570006
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1268/378/PR/161225/008339
- ReraGenie IDRG-KA-83688
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on16 Dec 2025
- Promised completion31 May 2028
- Revised completionNone
- Buildings1 building record
- Documents filed174 files
Current status
Figures as on 25 Jul 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A2 | - | - | - | 27 | 0 | 27 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 25 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 16 construction stages are filed complete. The stage furthest along is Masonry Construction, at 50%.
Building: 34% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 50% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 25 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Ex.Left.Col.K K Karumbaiah | - | - |
| Ex.Left.Col.K K Karumbaiah | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 10.25 cr | Rs 5.25 cr |
| Payment of fees | Rs 1.80 cr | - |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 50.00 lakh | Rs 6.99 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 7.00 lakh | Rs 3.00 lakh |
| On-site expenditure-Salaries of workers | Rs 5.40 lakh | Rs 2.00 lakh |
| On-site expenditure-Consultants Fees | Rs 5.00 lakh | Rs 2.00 lakh |
| On-site expenditure-Site Overhead | Rs 5.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vinay Patil & Associates |
| Engineer | SS CONS (Rajkumar Krishna Bhonde) |
| Chartered Accountant | Kisan & Co. K ( Kishan M Pandya) |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed174
As listed on the registration, under the names the promoter filed them with; the newest 80 of 174 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/161225/008339 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Q4 CA.pdf | 25 Jul 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: A2 RERA ArchQ420.pdf | 25 Jul 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Eng q4.pdf | 25 Jul 2026 |
| Q4 2025-26 Water supply and sewage board | 25 Jul 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 25 Jul 2026 |
| Q4 2025-26 Fire and Safety | 25 Jul 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA Q1.pdf | 25 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: A2 RERA ArchQ1.pdf | 25 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: ENGG Q1.pdf | 25 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 25 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 25 Jul 2026 |
| Q1 2026-27 Fire and Safety | 25 Jul 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA.pdf | 10 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Arch.pdf | 10 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: ENgg .pdf | 10 Mar 2026 |
| Q3 2025-26 Water supply and sewage board | 10 Mar 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 10 Mar 2026 |
| Q3 2025-26 Fire and Safety | 10 Mar 2026 |
| Profit and loss account, balance sheet & ITR, 2023-24 with CA UDIN along with schedule AttachedFile: FY-2023-24 ITR.pdf | 21 Oct 2025 |
| Upload Original commencement certificate for recent dateFile: A2 CR.png | 21 Jul 2025 |
| profit and loss account, balance sheet & ITR, 2023-24 with CA UDIN along with scheduleFile: ITR SCDM 2324 2mb.pdf | 21 Jul 2025 |
| Upload profit and loss account, balance sheet & ITR, 2023-24 with CA UDIN along with scheduleFile: ITR SCDM- 23-24 2mb.pdf | 16 Jun 2025 |
| Upload Original commencement certificate for recent date (Applied for the same)File: Commencement.pdf | 16 Jun 2025 |
| profit and loss account, balance sheet & ITR, 2023-24 with CA UDIN along with scheduleFile: ITR SCDM 2324.pdf | 14 May 2025 |
| title deed of the current land owner as per latest transaction for full extent of the projectFile: Title deed Katumbaiah.pdf | 14 May 2025 |
| notarized affidavit regarding all pending or cleared litigations /non-litigation by clearly mentioniFile: Affidavit no litigation.pdf | 14 May 2025 |
| 1) Upload profit and loss account, balance sheet & ITR, 2022-23 with CA UDINFile: ITR -2022-23.pdf | 8 Apr 2025 |
| 2) Upload profit and loss account, balance sheet & ITR 2023-24 with CA UDINFile: ITR SCDM- 23-24 (1)_merged_compressed.pdf | 8 Apr 2025 |
| 3)Approved Master plan Extract ear mark the proposed land and certified by the concern AuthorityFile: A2 Sanctioned plan.pdf | 8 Apr 2025 |
| 4)Village map certified by the concern officer with demarcation of proposed landFile: Adobe Scan Apr 08, 2025.pdf | 8 Apr 2025 |
| 5) Please upload the brief estimated cost of construction in detail certified by the EngineerFile: Estimate.pdf | 8 Apr 2025 |
| Upload profit and loss account, balance sheet & ITR and 2023-24File: ITR SCDM- 23-24.pdf | 13 Mar 2025 |
| Upload profit and loss account, balance sheet & ITR and 2022-23File: ITR -2022-23.pdf | 13 Mar 2025 |
| notarized affidavit regarding all pending or cleared litigations /non-litigationFile: Affidavit no litigation.pdf | 13 Mar 2025 |
| Approved Master plan Extract ear mark the proposed land and certified by the concern AuthorityFile: A2 Sanctioned plan.pdf | 13 Mar 2025 |
| 1) Upload profit and loss account, balance sheet & ITR, 2023-24 with CA UDIN along with scheduleFile: ITR SCDM- 23-24 (1).pdf | 8 Feb 2025 |
| 2)itle deed of the current land owner as per latest transaction for full extent of the projectFile: Title deed Katumbaiah.pdf | 8 Feb 2025 |
| 3)notarized affidavit regarding all pending or cleared litigations /non-litigationFile: Affidavit no litigation.pdf | 8 Feb 2025 |
| 4)uploaded Allotment letter, the Annexure-A, Stage wise time Schedule of completion of the Project iFile: AllotmentLetter.pdf | 8 Feb 2025 |
| 5) Please upload the brief estimated cost of construction certified by the Engineer.File: Construction Estimate.pdf | 8 Feb 2025 |
| profit and loss account, balance sheet & ITR 2022-23File: Audited Statement.pdf | 25 Dec 2024 |
| profit and loss account, balance sheet & ITR 2023-24File: ITR SCDM 202324.pdf | 25 Dec 2024 |
| title deed of the current land owner as per latest transactionFile: Gift_deed_sheela karumbaiah-karumbaiah2007-08.pdf | 25 Dec 2024 |
| EC from 21/5/2024 to till dateFile: ECC-21122024-7771975.pdf | 25 Dec 2024 |
| notarized affidavit regarding all pending or cleared litigations /non-litigation by clearly mentionFile: No Liti affidavit.pdf | 25 Dec 2024 |
| clear notarized affidavit in form-BFile: Form B.pdf | 25 Dec 2024 |
| notarized JD cum AffidavitFile: JD AFFI CUM DEC.pdf | 25 Dec 2024 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: SKETCH ADLR.pdf | 25 Dec 2024 |
| The uploaded document for single plot layout - uploaded as partly. so upload plan along with signedFile: approved Single layout plan.pdf | 25 Dec 2024 |
| Approved Original Single Plot layout plan work order originalFile: approved Single layout plan.pdf | 25 Dec 2024 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: A2 Sanctioned plan.pdf | 25 Dec 2024 |
| Upload Original commencement certificate.File: Commencement certificate.pdf | 25 Dec 2024 |
| Change of land use details.File: allination.pdf | 25 Dec 2024 |
| Land cost calculation sheet as per the guidance valueFile: Adobe Scan Dec 25, 2024.pdf | 25 Dec 2024 |
| Please mention the project name and project address in the affidavit and upload the section 3(1) notFile: Firm B Notarized.pdf | 25 Dec 2024 |
| Please mention Annexure-A and upload the proforma of the Allotment letterFile: AllotmentLetter.pdf | 25 Dec 2024 |
| profit and loss account, balance sheet & ITR, 2022-23 with CA UDIN along with scheduleFile: Audited Statement.pdf | 29 Nov 2024 |
| Data entry done separately for both and uploaded in the data entry sectionFile: Conversion Order Full.pdf | 29 Nov 2024 |
| katha extract issued by concerned local (New khata not yet issued)File: 3 Khata.pdf | 29 Nov 2024 |
| Form-B notarized affidavit with date of completion of project in DDMMYYYY FormatFile: Firm B Notarized.pdf | 29 Nov 2024 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original surveyFile: Survey sketch.pdf | 29 Nov 2024 |
| Approved Original Single Plot layout plaFile: Single Layout Plan.pdf | 29 Nov 2024 |
| Approved Original Single Plot layout plan work order.File: Single Layout Plan.pdf | 29 Nov 2024 |
| All original sanctioned drawings, floor plan, sectional drawings and elevations.File: A2 Sanctioned plan.pdf | 29 Nov 2024 |
| Original commencement certificate.File: Commencement certificate.pdf | 29 Nov 2024 |
| Approved Master plan Extract ear mark the proposed land and certified by the concern AuFile: A2 Sanctioned plan.pdf | 29 Nov 2024 |
| Engineer license certificate issued by the concerned local Planning authorityFile: rajbhonde_63609 (1).pdf | 29 Nov 2024 |
| STP design drawing as per the Guidelines of KSPCB NOCFile: STP Drawings as per KSPCB.pdf | 29 Nov 2024 |
| project name and project address and upload the notarized affidavitFile: Firm B Notarized.pdf | 29 Nov 2024 |
| proforma of the Allotment letterFile: AllotmentLetter.pdf | 29 Nov 2024 |
| Profit and loss account, balance sheet & ITR, 2022-23 with CA UDIN along with scheduleFile: Audited Statement.pdf | 13 Nov 2024 |
| Authenticated copy of current year RTC in PDF formatFile: RTC.pdf | 13 Nov 2024 |
| Khata from Local BodyFile: Khata endorsement 10-12-2014.pdf | 13 Nov 2024 |
| Form-B notarized affidavit with date of completion of project in DDMMYYYY FormatFile: Firm B Notarized.pdf | 13 Nov 2024 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey SketFile: Survey sketch.pdf | 13 Nov 2024 |
| Approved Original Single Plot layout planFile: Single Layout Plan.pdf | 13 Nov 2024 |
| Approved Original Single Plot layout plan work orderFile: Single Layout Plan.pdf | 13 Nov 2024 |
| Original sanctioned drawings, floor plan, sectional drawings and elevations.File: A2 Sanctioned plan.pdf | 13 Nov 2024 |
| commencement certificate.File: Commencement certificate.pdf | 13 Nov 2024 |
| Village mapFile: Village map.png | 13 Nov 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Palacia I Greens | Sy no 122/1A, Palacia I Greens, 2nd Stage, Bhogadi, Mysore-570006 | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mysore
Computed across the 700+ Mysore projects on ReraGenie, from their own filings.
Keep Palacia I Greens -A2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mysore700+ in Mysore
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
Construction of 2446 Dus at Mandakalli Mysore
MCC
Construction of 1440 houses at lalithadripura
City Corporation Myuru
Construction of 843 G+2 Houses
Chief Officer
JAL VAYU TOWERS
AIR FORCE NAVAL HOUSING BOARD
Sanaklp Temple Tree
Sankalp Constructions private limited
SANKALP CROWN PHASE 1
SANKALP CONSTRUCTIONS PRIVATE LIMITED
See every Mysore project, with the district possession charts
Builder: SAMUDAY CONSTRUCTION AND DEVELOPERS MYSORE
SAMUDAY CONSTRUCTION AND DEVELOPERS MYSORE has 3 registrations on RERA Karnataka, including Palacia I Greens -A2 and Palacia I Greens. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Mysore district page.
Frequently asked questions
What are my rights if Palacia I Greens -A2 is delayed beyond 31 May 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Palacia I Greens -A2?
The registered promoter entity is SAMUDAY CONSTRUCTION AND DEVELOPERS MYSORE, a partnership firm as per the filing. Its GSTIN 29ACUFS0403P2ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Palacia I Greens -A2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Palacia I Greens -A2?
The professionals named in the filing: Architect: Vinay Patil & Associates; Engineer: SS CONS (Rajkumar Krishna Bhonde); Chartered Accountant: Kisan & Co. K ( Kishan M Pandya). Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Palacia I Greens -A2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback