Red flags
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PACIFIC TOWER is a Others project by CHAITANYA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100034823 on 28 Apr 2022. Possession is promised by 30 Sep 2027. The completion date has moved by 18 months from the original filing. 140 of the 193 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NamePACIFIC TOWER
- TypeOthers
- Location
- -
- PUNE
- Fursungi
- Haveli
- 412308
- Pincode412308
- RERA no.P52100034823
- ReraGenie IDRG-MH-55134
Builder
- NameCHAITANYA DEVELOPERS
- Entity typePartnership
- PartnersDEEPAK LOTAN GUJAR, RAKHI ANIL JAIN, MAHADEO SAMBHAJI MAGAR, SATISH DNYANESHWAR JAGTAP, RAJIV RAMDAS BHADALE, VIJAYBHAI BHARATBHAI BHOOT, RUPESH UTTAM MORE, DIPAK KUMAR BHARATBHAI BHOOT
- Other registrations14 more →
- Completed7 of 15
- No longer live4 lapsed, de-registered or revoked
- Declared earlier projects24 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Apr 2022
- Promised completion30 Sep 2027
- Revised completionRevised to 30 Sep 2027 (originally 31 Mar 2026)
- Buildings1 building record
- Documents filed123 files
Current status
Figures as on 12 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PACIFIC TOWER | NA | 14 | 14 | 181 | 12 | 193 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 85%.
PACIFIC TOWER: 57% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 85% |
| Basement (if any) | 80% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed100
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership27
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SITABAI NANASAHEB DHAMAL | Fursungi | Pune |
| ASHOK NANASAHEB DHAMAL | Fursungi | Pune |
| VASANT NANASAHEB DHAMAL | Fursungi | Pune |
| BEBI MAHADEV DHAMAL | Fursungi | Pune |
| RAVI MAHADEV DHAMAL | Fursungi | Pune |
| BHARTI BALASAHEB GARUD | Fursungi | Pune |
| AARTI AMIT KATAKE | Fursungi | Pune |
| SHIVAJI DASHRATH DHAMAL | Fursungi | Pune |
| BHIMA SHIVAJI DHAMAL | Fursungi | Pune |
| AJINKYA SHIVAJI DHAMAL | Fursungi | Pune |
| PUNAM SAGAR KALBHOR | Fursungi | Pune |
| DATTATRAY DASHRATH DHAMAL | Fursungi | Pune |
| AKSHAY DATTATRAY DHAMAL | Fursungi | Pune |
| SNEHAL DATTATRAY DHAMAL | Fursungi | Pune |
| BHAUSAHEB GULABRAO DHAMAL | Fursungi | Pune |
| NIRMALA BHAUSAHEB DHAMAL | Fursungi | Pune |
| AMOL BHAUSAHEB DHAMAL | Fursungi | Pune |
| CHAITRALI SANTOSH HARPALE | Fursungi | Pune |
| MONIKA HANUMANT PAWAR | Fursungi | Pune |
| PANDURANG GULABRAO DHAMAL | Fursungi | Pune |
| MEENA PANDURANG DHAMAL | Fursungi | Pune |
| PRAMOD PANDURANG DHAMAL | Fursungi | Pune |
| GITANJALI SANDEEP GAIKWAD | Fursungi | Pune |
| NANASAHEB DASHARATH DHAMAL | Fursungi | Pune |
| MAHADEV DASHARATH DHAMAL | Fursungi | Pune |
| SANGITA DATTATRAY DHAMAL | Fursungi | Pune |
| AMIT BHAUSAHEB DHAMAL | Fursungi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PACIFIC TOWER | NA | Rs 56.24 cr | Rs 31.08 cr |
| - | NA | Rs 3.36 cr | Rs 3.36 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATIT ADMULWAR ADMULWAR |
| Engineer | Kharat Yogesh Vasant |
| Chartered Accountant | RITESH SHAH |
| Chartered Accountant | YOGESH D MALI |
| Partner | Role in project |
|---|---|
| CHAITANYA DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTHE PROJECT IS COMPLETED NEARLY AROUND 55% , TO COMPLETE THE REMAINING CONSTRUCTION OF SAID PROJECT WE NEEED EXTENSION TILL DATE 30/09/2027
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Mar 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Sep 2027
Documents filed123
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate Form 1 March 2026.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Form 2 March 2026.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 12 May 2026 |
| Form 2A (FY 2022-2023)File: FORM 2A 2022-23 (1).pdf | 1 Apr 2026 |
| Form 2A (FY 2023-2024)File: Form 2A Year 2023 To 2024.pdf | 1 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A Year 2024 To 2025.pdf | 1 Apr 2026 |
| Form 5 (FY 2022-2023)File: FORM 5 2022-23.pdf | 31 Mar 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 2023-24.pdf | 31 Mar 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 2024-2025.pdf | 31 Mar 2026 |
| Form 1File: Form 1 30-09- 2023.pdf | 12 Feb 2026 |
| Form 2File: FORM 2 30-09-2023.pdf | 12 Feb 2026 |
| Form 3File: Form 3 30-09-2023.pdf | 12 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 30-09-2023.pdf | 12 Feb 2026 |
| Form 1File: FORM 1 30-09-2025.pdf | 11 Feb 2026 |
| Form 2File: FORM 2 30-09-2025.pdf | 11 Feb 2026 |
| Form 3File: FORM 3 30-09-2025.pdf | 11 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-09-2025.pdf | 11 Feb 2026 |
| Form 1File: Form 1 31-12-2025.pdf | 11 Feb 2026 |
| Form 2File: FORM 2 31-12-2025.pdf | 11 Feb 2026 |
| Form 3File: FORM 3 31-12-2025.pdf | 11 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-12- 2025.pdf | 11 Feb 2026 |
| Form 1File: FORM 1 31-03-2024.pdf | 11 Feb 2026 |
| Form 2File: FORM 2 31-03-2024.pdf | 11 Feb 2026 |
| Form 3File: FORM 3 31-03-2024.pdf | 11 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 31-03-2024.pdf | 11 Feb 2026 |
| Form 1File: FORM 1 30-09-2024.pdf | 11 Feb 2026 |
| Form 2File: FORM 2 30-09-2024.pdf | 11 Feb 2026 |
| Form 3File: FORM 3 30-09-2024.pdf | 11 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 30-09-2024.pdf | 11 Feb 2026 |
| Form 1File: FORM 1 31-12-2024.pdf | 11 Feb 2026 |
| Form 2File: Engineer Form 2 Dec 2024.pdf | 11 Feb 2026 |
| Form 3File: FORM 3 31-12-2024.pdf | 11 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 31-12-2024.pdf | 11 Feb 2026 |
| Form 1File: Architect Certificate Form 1 June 2025.pdf | 11 Aug 2025 |
| Form 2File: Engineer Certificate Form 2 June 2025.pdf | 11 Aug 2025 |
| Form 3File: CA Certificate Form 3 June 2025.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory June 2025.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold [March 2025].pdf | 7 Jun 2025 |
| Self-declaration of Quarterly Progress | 7 Jun 2025 |
| Form 1 | 7 Jun 2025 |
| Form 2File: Engineer Certificate Form-2 [March 2025].pdf | 7 Jun 2025 |
| Form 3File: CA certificate Form-3 March 2025.pdf | 7 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 March 2025.pdf | 30 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: F 5 Pacific Tower.pdf | 4 Apr 2025 |
| Copy of the legal title reportFile: title Report.pdf | 24 Mar 2025 |
| Building plan approvalFile: Final Drawing 1_3.pdf | 15 Mar 2025 |
| Building plan approvalFile: Final Drawings 4_6.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Drawings 7_9.pdf | 15 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE (1).pdf | 15 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Final Drawing 1_3.pdf | 15 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Final Drawings 4_6.pdf | 15 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Dec 2024.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Dec 2024 compressed.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2024.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Dec 2024.pdf | 24 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Dec 2024_compressed.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Dec 2024.pdf | 24 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2024.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep 2024.pdf | 30 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Sep 2024 (1).pdf | 29 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 Sep 2024.pdf | 29 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sep 2024.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate June 2024.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 2024 (2)_compressed.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate june 2024.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD-UNSOLD.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 PACIFIC TOWER_compressed.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 24.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 March 24.pdf | 18 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 5 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31 12 2023.pdf | 2 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31 12 2023.pdf | 2 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 30-09-2022.pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 31-12-2022.pdf | 20 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-09-2022.pdf | 20 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-12-2022.pdf | 20 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-2023.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2023 Pacific.pdf | 23 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2023 Pacific.pdf | 23 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 30-09-2023.pdf | 23 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations, which the RERA portal never shows together
- All 123 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PACIFIC TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE13,700+ in Pune
Ashtavinayak City Phase - 3
Ashtavinayak City Pune LLP
CELESTIA
Malpani Properties
SAMRUDDHI HEIGHTS
Shree Samruddhi Corporation
Suyog Shrushti
Suyog Developers
Ashtavinayak City Phase - 4
Ashtavinayak Reality
Everra Phase 1
Honcho Properties Private Limited
Builder: CHAITANYA DEVELOPERS
Chaitanya Developers has 15 registrations on MahaRERA, including Sea Vista and Chaitanya Srusti. Its filings disclose 24 earlier MahaRERA projects: declares 21 of 24 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if PACIFIC TOWER is delayed beyond 30 Sep 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PACIFIC TOWER?
The registered promoter entity is CHAITANYA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PACIFIC TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PACIFIC TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PACIFIC TOWER?
The professionals named in the filing: Architect: ATIT ADMULWAR ADMULWAR; Engineer: Kharat Yogesh Vasant; Chartered Accountant: RITESH SHAH; Chartered Accountant: YOGESH D MALI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PACIFIC TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback