Registered Litigation declared Residential / Group Housing project

Oxford Golf Estates

By OXFORD GOLF VIEWS

RG-MH-72429 · RERA PR1261012502679 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • Rs 100.00 crore secured on the land, in favour of Sweekar Housing Pvt Ltd
  • The declared charge does not appear in the CERSAI report on the filing
  • Allotment letter deviates from the model form

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
561 of 681Construction stages doneacross 68 buildings; furthest along: Excavation, 0%
29 of 74Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 15 documents Report an error

Oxford Golf Estates is a Residential / Group Housing project by OXFORD GOLF VIEWS in Pune, Maharashtra, registered with MahaRERA as PR1261012502679 on 9 Mar 2026. Possession is promised by 31 Dec 2030. 45 of the 74 units on this registration are recorded sold or booked, and 561 of 681 construction stages are filed complete.

At a glance

Project

  • NameOxford Golf Estates
  • TypeResidential / Group Housing
  • Location
    • GAT No. 1168 (P) and Others
    • Lavale
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1261012502679
  • ReraGenie IDRG-MH-72429

Builder

  • NameOXFORD GOLF VIEWS
  • Entity typePartnership
  • GSTIN27AABFO4287E1Z8
  • PartnersANIRUDHA UTTAM SEOLEKAR, ASHOK KHUPCHAND KOTHARI, PARAG CHINUBHAI SHAH, LAKEWOOD DEVELOPERS AND SPORTS PVT LTD, OXFORD GOLF & RESORTS PVT LTD

Key dates

this monthRegisteredMar 2026PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Mar 2026
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings68 building records
  • Documents filed15 files

Current status

61%45 of 74 units booked
90.5%Work done, per cost certificate

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Villa Type 1- Cluster Villa - 34NA33404
Villa Type 1- Cluster Villa - 35NA33404
Villa Type 3- Luxury Villa - 4NA33101
Villa Type 3- Luxury Villa - 7NA33101
Villa Type 3- Luxury Villa - 8NA33101
Villa Type 3- Luxury Villa - 9NA33101
Villa Type 3- Luxury Villa - 10NA33101
Villa Type 3- Luxury Villa - 11NA33101
Villa Type 3- Luxury Villa - 14NA33101
Villa Type 3- Luxury Villa - 15NA33101
Villa Type 3- Luxury Villa - 17NA33101
Villa Type 3- Luxury Villa - 18NA33101
Villa Type 3- Luxury Villa - 19NA33101
Villa Type 3- Luxury Villa - 20NA33101
Villa Type 3- Luxury Villa - 21NA33101
Villa Type 3- Luxury Villa - 22NA33101
Villa Type 3- Luxury Villa - 23NA33101
Villa Type 3- Luxury Villa - 24NA33101
Villa Type 3- Luxury Villa - 6NA33101
Villa Type 3A - Luxury Villa Retained - 5 NA33101
Villa Type 3A - Luxury Villa Retained - 12NA33101
Villa Type 3A - Luxury Villa Retained - 13NA33101
Villa Type 6 - Row House- 1NA22101
Villa Type 6 - Row House - 2NA22101
Villa Type 6 - Row House - 3NA22101
Villa Type 6 - Row House - 4NA22101
Villa Type 6 - Row House - 5NA22101
Villa Type 6 - Row House - 6NA22101
Villa Type 6 - Row House - 7NA22101
Villa Type 6 - Row House - 8NA22101
Villa Type 6 - Row House - 9NA22101
Villa Type 6 - Row House - 10NA22101
Villa Type 6 - Row House - 11NA22101
Villa Type 6 - Row House - 12NA22101
Villa Type 6 - Row House - 12ANA22101
Villa Type 6 - Row House - 14NA22101
Villa Type 6 - Row House - 15NA22101
Villa Type 6 - Row House - 16NA22101
Villa Type 6 - Row House - 17NA22101
Villa Type 6 - Row House - 18NA22101
Villa Type 6 - Row House - 19NA22101
Villa Type 6 - Row House - 20NA22101
Villa Type 6 - Row House - 21NA22101
Villa Type 6 - Row House - 22NA22101
Villa Type 5./1 - Signature Villa - 1NA33101
Villa Type 5./1 - Signature Villa - 2NA33101
Villa Type 5./1 - Signature Villa - 3NA33101
Villa Type 5./1 - Signature Villa - 25NA33101
Villa Type 5./1 - Signature Villa - 26NA33101
Villa Type 5./1 - Signature Villa - 27NA33101
Villa Type 5./1 - Signature Villa - 29NA33101
Villa Type 5./1 - Signature Villa - 30NA33101
Villa Type 5./1 - Signature Villa - 31NA33101
Villa Type 5./1 - Signature Villa - 32NA33101
Villa Type 5./1 - Signature Villa - 33NA33101
Villa Type 5A - Signature Villa Retained - 16NA33101
Villa Type 6A - Row House - 1NA22101
Villa Type 6A - Row House - 2NA22101
Villa Type 6A - Row House - 3NA22101
Villa Type 6A - Row House - 4NA22101
Villa Type 6A - Row House - 5NA22101
Villa Type 6A - Row House - 6NA22101
Villa Type 6A - Row House - 7NA22101
Villa Type 6A - Row House - 8NA22101
Villa Type 5./2 - Signature Villa - 39NA22101
Villa Type 5./2 - Signature Villa - 40NA22101
Villa Type 5./2 - Signature Villa - 41NA22101
Villa Type 5./2 - Signature Villa - 42NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 68 buildings; the table lists the first 20.

561 of 681 construction stages are filed complete across 68 buildings. The stage furthest along is Excavation, at 0%.

Villa Type 1- Cluster Villa - 34100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 1- Cluster Villa - 35100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 4100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 7100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 8100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 9100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 10100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 11100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 14100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 15100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 17100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 18100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 19100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 20100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 21100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 22100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 23100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 24100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3- Luxury Villa - 6100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Villa Type 3A - Luxury Villa Retained - 5100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo100%
Water SupplyNo90%
Sewerage (Chamber, Lines, Septic Tank , STP)No60%
Storm Water DrainsNo100%
Landscaping & Tree PlantingNo100%
Street LightingNo100%
Community BuildingsNo100%
Treatment And Disposal Of Sewage And Sullage WaterNo90%
Solid Waste Management And DisposalNo90%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo100%
Electrical meter room, sub-station, receiving stationNo100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Open Space56
BuildingOpen SpaceTotal
Villa Type 1- Cluster Villa - 3411
Villa Type 1- Cluster Villa - 3511
Villa Type 3- Luxury Villa - 411
Villa Type 3- Luxury Villa - 711
Villa Type 3- Luxury Villa - 811
Villa Type 3- Luxury Villa - 911
Villa Type 3- Luxury Villa - 1011
Villa Type 3- Luxury Villa - 1111
Villa Type 3- Luxury Villa - 1411
Villa Type 3- Luxury Villa - 1511
Villa Type 3- Luxury Villa - 1711
Villa Type 3- Luxury Villa - 1811
Villa Type 3- Luxury Villa - 1911
Villa Type 3- Luxury Villa - 2011
Villa Type 3- Luxury Villa - 2111
Villa Type 3- Luxury Villa - 2211
Villa Type 3- Luxury Villa - 2311
Villa Type 3- Luxury Villa - 2411
Villa Type 3- Luxury Villa - 611
Villa Type 3A - Luxury Villa Retained - 511
Villa Type 3A - Luxury Villa Retained - 1211
Villa Type 3A - Luxury Villa Retained - 1311
Villa Type 6 - Row House- 111
Villa Type 6 - Row House - 211
Villa Type 6 - Row House - 311
Villa Type 6 - Row House - 411
Villa Type 6 - Row House - 511
Villa Type 6 - Row House - 611
Villa Type 6 - Row House - 711
Villa Type 6 - Row House - 811
Villa Type 6 - Row House - 911
Villa Type 6 - Row House - 1011
Villa Type 6 - Row House - 1111
Villa Type 6 - Row House - 1211
Villa Type 6 - Row House - 12A11
Villa Type 6 - Row House - 1411
Villa Type 6 - Row House - 1511
Villa Type 6 - Row House - 1611
Villa Type 6 - Row House - 1711
Villa Type 6 - Row House - 1811
Villa Type 6 - Row House - 1911
Villa Type 6 - Row House - 2011
Villa Type 6 - Row House - 2111
Villa Type 6 - Row House - 2211
Villa Type 5./1 - Signature Villa - 111
Villa Type 5./1 - Signature Villa - 211
Villa Type 5./1 - Signature Villa - 311
Villa Type 5./1 - Signature Villa - 2511
Villa Type 5./1 - Signature Villa - 2611
Villa Type 5./1 - Signature Villa - 2711
Villa Type 5./1 - Signature Villa - 2911
Villa Type 5./1 - Signature Villa - 3011
Villa Type 5./1 - Signature Villa - 3111
Villa Type 5./1 - Signature Villa - 3211
Villa Type 5./1 - Signature Villa - 3311
Villa Type 5A - Signature Villa Retained - 1611

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area396,966 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofSweekar Housing Pvt Ltd
Secured amountRs 100.00 crore
CERSAI search filedYes
Declared on24 Feb 2026
LandownerVillageDistrict
Knowledge City Education Private LimitedLavalePune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI36850.0
Proposed, not sanctioned36,753 sq m
Buildings approved68
Buildings sanctioned68

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHE RATNAKAR BANK LTD,11 MOLEDINA ROAD,NEAR NAAZ BAKERY, EAST STREET FACING, PUNE-411001.
Estimated costRs 386.37 cr
Cost incurredRs 349.74 cr
Work done90.52%
BuildingWingEstimatedIncurred
-NARs 128.23 crRs 118.23 cr
Villa Type 5./1 - Signature Villa - 1NARs 6.57 crRs 6.57 cr
Villa Type 5./1 - Signature Villa - 2NARs 6.57 crRs 6.57 cr
Villa Type 5./1 - Signature Villa - 3NARs 6.57 crRs 6.57 cr
Villa Type 5./1 - Signature Villa - 33NARs 6.57 crRs 6.57 cr
Villa Type 3- Luxury Villa - 4NARs 5.90 crRs 5.90 cr
Villa Type 3- Luxury Villa - 7NARs 5.90 crRs 5.90 cr
Villa Type 3- Luxury Villa - 8NARs 5.90 crRs 5.90 cr
Villa Type 3- Luxury Villa - 9NARs 5.90 crRs 5.90 cr
Villa Type 3- Luxury Villa - 10NARs 5.90 crRs 5.90 cr
Villa Type 3- Luxury Villa - 15NARs 5.90 crRs 5.90 cr
Villa Type 3- Luxury Villa - 18NARs 5.90 crRs 5.90 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPI CONSULTANTS
EngineerPARIN CONSTRUCTION
Chartered AccountantGAURAV JAIN A & COMPANY
Chartered AccountantAS Jinturkar and Co.
PartnerRole in project
OXFORD GOLF VIEWS-

Litigation declared3

CaseCourtStatus
239/2006/20069th Jt. C.J.S.D. & Addl. C. J. M.Ongoing
700/2014/20145th Jt. C.J.S.D. & Addl. C. J. M.Ongoing
1796/2006/2006Small Cause CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Dec 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed15

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf18 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf18 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf18 Jun 2026
Layout approvalFile: 00 LAYOUT PLAN.pdf28 Jan 2026
Declaration and undertaking (Annexure A)File: Annexure A - Declaration cum Undertaking.pdf12 Jan 2026
Layout approvalFile: LAYOUT PLAN-1.pdf10 Dec 2025
Building plan approvalFile: CLUSTER VILLA-2.pdf10 Dec 2025
Building plan approvalFile: CLUSTER VILLA-3.pdf10 Dec 2025
Building plan approvalFile: LUXURY VILLAS -4.pdf10 Dec 2025
Building plan approvalFile: LUXURY VILLAS RETAINED-5.pdf10 Dec 2025
Building plan approvalFile: ROW HOUSE-6.pdf10 Dec 2025
Building plan approvalFile: SIGNATURE VILLA-7.pdf10 Dec 2025
Building plan approvalFile: SIGNATURE VILLA RETAINED-8.pdf10 Dec 2025
Building plan approvalFile: SIGNATURE VILLA TYPE 2-9.pdf10 Dec 2025
Building plan approvalFile: ROW HOUSE TYPE 2-10.pdf10 Dec 2025

How this compares with Pune

61%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Oxford Golf Estates on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lavale13,700+ in Pune

2 kmOxford Golf EstatesCompleted 5Lapsed / revoked 1Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: OXFORD GOLF VIEWS

OXFORD GOLF VIEWS has 1 registration on MahaRERA, including Oxford Golf Estates. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Oxford Golf Estates is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Oxford Golf Estates?

The registered promoter entity is OXFORD GOLF VIEWS, a partnership as per the filing. Its GSTIN 27AABFO4287E1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Oxford Golf Estates?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Oxford Golf Estates?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Oxford Golf Estates?

The professionals named in the filing: Architect: PI CONSULTANTS; Engineer: PARIN CONSTRUCTION; Chartered Accountant: GAURAV JAIN A & COMPANY; Chartered Accountant: AS Jinturkar and Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Oxford Golf Estates?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Oxford Golf Estates. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Oxford Golf Estates to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.