Home / Browse projects / Mumbai Suburban, Maharashtra / ORCHID TOWER

Registered No litigation declared Commercial project

ORCHID TOWER

By Shree Laxmi Estate Pvt. Ltd.

RG-MH-30743 · RERA P51800047733 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
5 of 11Construction stages donefurthest along: Staircases, 95%
93 of 194Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

ORCHID TOWER is a Commercial project by Shree Laxmi Estate Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047733 on 21 Nov 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 101 of the 194 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameORCHID TOWER
  • TypeCommercial
  • Location
    • S V ROAD
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047733
  • ReraGenie IDRG-MH-30743

Builder

  • NameShree Laxmi Estate Pvt. Ltd.
  • Entity typeCompany
  • DirectorsNarendra Arjan Dhanani, Pritam Motiram Chawla, MAHENDER ARJAN DHANANI, Ashok Motiram Chawla

Key dates

this monthRegisteredNov 2022First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Nov 2022
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed90 files

Current status

52%101 of 194 units booked
44.3%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ORCHID TOWERNA20200194194

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

ORCHID TOWER: 74% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed192

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots192
Closed/Covered186
Open Space6

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,055 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jul 2025

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI13268.43
Proposed, not sanctioned13,268 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMangal Kunj Swami Vivekanand Road Borivali West Mumbai 400092
Estimated costRs 118.00 cr
Cost incurredRs 52.23 cr
Work done44.26%
BuildingWingEstimatedIncurred
ORCHID TOWERNARs 118.00 crRs 52.23 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay Shah
EngineerJaichand Kanaujia
Chartered AccountantS Nagwekar and Co
Chartered AccountantBhupendra P Shah and Co
PartnerRole in project
Shree Laxmi Estate Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07022619759Mar 2026 → Mar 2027

Reason as filed by the promoterDue to Tower Parking is under progress.We hereby submit our request for an extension of the project completion till March 2027

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12400004Amolika BandiwadekarShree Laxmi Estate Pvt. Ltd.23/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 OT June26.pdf18 Jul 2026
Withdrawal Update Form 2File: Form2 June26.pdf18 Jul 2026
Withdrawal Update Form 3File: Form3 CA June26.pdf18 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A-Mar26.pdf19 May 2026
Withdrawal Update Form 1File: Arch Form1 Mar26.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Mar26.pdf20 Apr 2026
Withdrawal Update Form 3File: Form3 Mar26 Estate.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Dec25 OT.pdf19 Jan 2026
Withdrawal Update Form 2File: Form2 Dec25.pdf19 Jan 2026
Withdrawal Update Form 3File: Form3 Estate dec25.pdf19 Jan 2026
Withdrawal Update Form 1File: Rera Form1.pdf18 Oct 2025
Withdrawal Update Form 2File: Form2 Sept25.pdf18 Oct 2025
Withdrawal Update Form 3File: Form3 Sept25.pdf18 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf18 Sep 2025
Withdrawal Update Form 1File: Form1 Archi June25.pdf25 Aug 2025
Withdrawal Update Form 2File: Form2 engg June25.pdf25 Aug 2025
Withdrawal Update Form 3File: form3 CA June25.pdf25 Aug 2025
Withdrawal Update Form 1File: Form1 Arch cert Mar25.pdf4 Aug 2025
Withdrawal Update Form 2File: Form2 OT Mar25.pdf4 Aug 2025
Withdrawal Update Form 3File: CA FORM3 MAR25 estate.pdf4 Aug 2025
Form 5 (FY 2024-2025)File: Form 5 Mar25.pdf4 Aug 2025
Form 1File: Form1 Arch cert Mar25.pdf19 Jul 2025
Form 2File: Form2 OT Mar25.pdf19 Jul 2025
Form 3File: CA FORM3 MAR25 estate.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold-unsold OT Mar25.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Arch cert Mar25.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Dec24 OT.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 CA Dec24.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold booked inve Sept24 OT.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: sold booked inven Dec24 OT.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 OT arch certi dec24.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM3 SEPT 24 OT.pdf4 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG SEPT 24.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Orchid Tower Sept24.pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form3 June24 OT.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 June24 engg OT.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: Mar24 sold unsold.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: sold unsold june24 Orchid Tower.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 June24 OT.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Orchid Tower March 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Estate engg Mar24.pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A Site supervisor fy23-24.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 annual report fy23-24.pdf8 Oct 2024
Building plan approvalFile: Amended Plan dtd9 july24 - converted less size.pdf6 Aug 2024
Building plan approvalFile: Amend letter approval_signed.pdf6 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan dtd9 july24 - converted less size.pdf6 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Amend letter approval_signed.pdf6 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: CC full dtd 1 Aug 2024.pdf6 Aug 2024
Declaration about Commencement CertificateFile: Declaration about cc 1st Aug 2024.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Arch certi Mar24.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: OT Engg certi sept23.pdf1 Jan 2024
Disclosure of sold/ booked inventoryFile: OT SOLD-UNSOLD sept23.pdf1 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Estate Form3 sept23.pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 engg certi Mar23.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: sold-unsold OT.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Orchid Tower Mar23.pdf10 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form5 Annual Report OT.pdf9 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi certi sept 23 OT.pdf26 Oct 2023
Declaration about Commencement CertificateFile: Declaration CC.pdf29 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC up to 10th flr dt31072024.pdf28 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: site supervisor fy22-23.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Orchid Tower.pdf4 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank letter new OT.pdf13 Feb 2023
Proforma of Agreement for saleFile: Orchid new RERA agreement.pdf29 Dec 2022
Proforma of Allotment letterFile: Allotment Orchid Final.pdf29 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Orchid Tower New Form.pdf11 Nov 2022
Details of encumbrances concerned to FinanceFile: encum Concerned.pdf4 Nov 2022
Details of encumbrances concerned to LegalFile: encum Concerned.pdf4 Nov 2022
Copy of the legal title reportFile: Orchid Tower new title Project.pdf6 Oct 2022
Proforma of Allotment letterFile: RERA Sale Agreement.pdf6 Oct 2022
Proforma of Agreement for saleFile: RERA Sale Agreement.pdf6 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engg certi.pdf4 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK FORMAT A declaration.pdf4 Oct 2022
Details of encumbrances concerned to FinanceFile: concerned to finance.pdf30 Sep 2022
Details of encumbrances concerned to LegalFile: Concerned to Legal.pdf30 Sep 2022
Declaration about Commencement CertificateFile: Declaration about cc.pdf30 Sep 2022
Proforma of Agreement for saleFile: Allotment draft.pdf30 Sep 2022
Proforma of Allotment letterFile: Allotment draft.pdf30 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation Report.pdf30 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf30 Sep 2022

How this compares with Mumbai Suburban

52%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ORCHID TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmORCHID TOWERCompleted 157Lapsed / revoked 87Other 216Dot size: filed unitsN

Filed coordinates, straight-line distance. 460 registered projects within 2 km.

Builder: Shree Laxmi Estate Pvt. Ltd.

Shree Laxmi Estate Pvt. Ltd. has 1 registration on MahaRERA, including ORCHID TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ORCHID TOWER is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ORCHID TOWER?

The registered promoter entity is Shree Laxmi Estate Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ORCHID TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ORCHID TOWER?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ORCHID TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ORCHID TOWER?

The professionals named in the filing: Architect: Sanjay Shah; Engineer: Jaichand Kanaujia; Chartered Accountant: S Nagwekar and Co; Chartered Accountant: Bhupendra P Shah and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ORCHID TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ORCHID TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ORCHID TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.