ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / ORCHID INFINITY

Registered No litigation declared Residential / Group Housing project

ORCHID INFINITY

By LANDMARKS ORCHID INFRA

RG-MH-50418 · RERA P50500055292 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 94%
22 of 29Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

ORCHID INFINITY is a Residential / Group Housing project by LANDMARKS ORCHID INFRA in Nagpur, Maharashtra, registered with MahaRERA as P50500055292 on 14 Mar 2024. Possession is promised by 31 Dec 2027. 7 of the 29 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameORCHID INFINITY
  • TypeResidential / Group Housing
  • Location
    • Shiv Shanti Apartment
    • Hill Road
    • Shivajinagar
    • AMBAZARI
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440010
  • Pincode440010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500055292
  • ReraGenie IDRG-MH-50418

Builder

  • NameLANDMARKS ORCHID INFRA
  • Entity typePartnership
  • PartnersVINOD DATTATRY NALAMWAR, MANJUSHA VINOD NALAMWAR
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Current status

24%7 of 29 units booked
92.0%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ORCHID INFINITYNA161529029

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 94%.

ORCHID INFINITY: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises94%
Sanitary Fittings within the flats / premises71%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks84%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.69%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.56%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes48%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes53%
Storm Water DrainsYes26%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes33%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes12%
Electrical meter room, sub-station, receiving stationYes47%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Closed/Covered43

Land and ownership24

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area892 sq m
Land owned byThe promoter, with other names on the file
Named landowners24
LandownerVillageDistrict
LANDMARKS ORCHID INFRANagpur (M Corp.)Nagpur
LANDMARK ORCHID INFRANagpur (M Corp.)Nagpur
SAROJ MANIKACHAND SANKLANagpur (M Corp.)Nagpur
MANGALA GIRISH VAIDYANagpur (M Corp.)Nagpur
CHETAN GIRISH VAIDYANagpur (M Corp.)Nagpur
KRISHNA RAJARAMJI BHARGAVANagpur (M Corp.)Nagpur
SHASHI KRISHNA BHARGAVANagpur (M Corp.)Nagpur
KISHOR MADHUKAR MOGHENagpur (M Corp.)Nagpur
NISHA AVINASH MALEWARNagpur (M Corp.)Nagpur
NAVIN AVINASH MALEWARNagpur (M Corp.)Nagpur
PREMA MAMOJ DAIGAVANENagpur (M Corp.)Nagpur
DILIP SADASHIV MALEWARNagpur (M Corp.)Nagpur
SHAMKANT HARICHANDRA NAGALKARNagpur (M Corp.)Nagpur
KANNALURU VEERAGAVAN VIJAYANagpur (M Corp.)Nagpur
RAJESH JAWAHARLAL JAISWALNagpur (M Corp.)Nagpur
PADMAKAR DHONDUJI PATILNagpur (M Corp.)Nagpur
MUKESHKUMAR AYODHYAPRASAD JAISWALNagpur (M Corp.)Nagpur
MADHUCHANDA DASNagpur (M Corp.)Nagpur
SOMA RAHUL DATEYNagpur (M Corp.)Nagpur
UDAY DEORAO GOHOKARNagpur (M Corp.)Nagpur
YUKTI GIRISH VAIDYANagpur (M Corp.)Nagpur
KETAN AVINASH MALEWARNagpur (M Corp.)Nagpur
PRADEEP SADASHIV MALEWARNagpur (M Corp.)Nagpur
ANUDHA MUKESHKUMAR JAISWALNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNAGPUR MUNICIPAL CORPORATION (NMC)
Permissible FSI3571.13
Proposed, not sanctioned3,514 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPP AGRASEN CHATTRALAYA, RAVI NAGAR SQUARE, AMRAVATI ROAD, NAGPUR 440001
Estimated costRs 7.37 cr
Cost incurredRs 6.78 cr
Work done92.0%
BuildingWingEstimatedIncurred
ORCHID INFINITYNARs 7.37 crRs 6.78 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVAISHALI GAIKWAD
EngineerAFSAR R AHAMAD
EngineerAKSHAY KUMAR RAJENDRA JAISWAL
EngineerASHISH Y SONI
Chartered AccountantCA ANKIT TALREJA
PartnerRole in project
LANDMARKS ORCHID INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ORCHID INFINITY MARCH 2026.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2 MARCH ORCHID INFINITY MARCH 2026.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 ORCHID INFINITY MARCH 2026.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM 1 DEC 2026 INFINITY.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM 2 DEC 2026 INFINITY.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM 3 DEC 2026 INFINITY.pdf19 Apr 2026
Withdrawal Update Form 1File: FORM 1 DEC 2026 INFINITY.pdf7 Feb 2026
Withdrawal Update Form 2File: FORM 2 DEC 2026 INFINITY.pdf7 Feb 2026
Withdrawal Update Form 3File: FORM 3 DEC 2026 INFINITY.pdf7 Feb 2026
Withdrawal Update Form 1File: form 1 sept month.pdf20 Jan 2026
Withdrawal Update Form 2File: form 2 sept month.pdf20 Jan 2026
Withdrawal Update Form 3File: form 3 sept month.pdf20 Jan 2026
Withdrawal Update Form 1File: form 1 june month.pdf3 Dec 2025
Withdrawal Update Form 1File: form 1 sept month.pdf3 Dec 2025
Withdrawal Update Form 2File: form 2 june month.pdf3 Dec 2025
Withdrawal Update Form 2File: form 2 sept month.pdf3 Dec 2025
Withdrawal Update Form 3File: form 3 june month.pdf3 Dec 2025
Withdrawal Update Form 3File: form 3 sept month.pdf3 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 OI.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OI.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 OI.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold OI.pdf22 Apr 2025
Building plan approvalFile: 1.pdf28 Mar 2025
Building plan approvalFile: 2.pdf28 Mar 2025
Building plan approvalFile: 3.pdf28 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf28 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf28 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf28 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Permit.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Orchid Infinity_Dec-2024.pdf21 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Orchid Infinity.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: orchid infinity-2-3.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Orchid Infinity_SEP_2024.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: orchid infinity-1.pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Orchid Infinity 2023-24.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June-24.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ORCHID INFINITY.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Orchid Infinity.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Orchid Infinity_J.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Orchid Infinity_SEP-24.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Orchid Infinity (2) (1).pdf7 Mar 2024
Other - TechnicalFile: form d (2)_Royal Regency Kalidas.pdf7 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf16 Feb 2024
Other - LegalFile: Redevelopment Agreement Pg No 1 to 10.pdf16 Feb 2024
Other - LegalFile: Redevelopment Agreement Pg No 11 to 20.pdf16 Feb 2024
Other - LegalFile: Redevelopment Agreement Pg No 21 to 30.pdf16 Feb 2024
Other - LegalFile: Redevelopment Agreement Pg No 31 to 40.pdf16 Feb 2024
Other - LegalFile: Infinity General Power of Attorney 1 to 8.pdf16 Feb 2024
Other - LegalFile: Infinity General Power of Attorney 9 to 17.pdf16 Feb 2024
Declaration in FORM BFile: FORM B.pdf31 Jan 2024
Proforma of Agreement for saleFile: Deviation Report for Model Form of Agreement for sale.pdf31 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report for Model Form of Agreement for sale.pdf31 Jan 2024
Layout approvalFile: Building Map.pdf10 Jan 2024
Building plan approvalFile: Building Map.pdf10 Jan 2024
Details of encumbrances concerned to FinanceFile: No Finance and legal encumbrance.pdf10 Jan 2024
Details of encumbrances concerned to LegalFile: No Finance and legal encumbrance.pdf10 Jan 2024
Copy of Layout Approval (in case of layout)File: Building Map.pdf10 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Map.pdf10 Jan 2024
Declaration in FORM BFile: Form B Vinod and Manjusha.pdf10 Jan 2024
CERSAI detailsFile: Cersai Report.pdf10 Jan 2024
PAN CardFile: 1 LOI PAN CARD.pdf27 Dec 2023
Copy of the legal title reportFile: 2 LOI LEGAL TITLE REPORT.pdf27 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: 5 COMMENCEMENT CERTIFICATE.pdf27 Dec 2023
Declaration about Commencement CertificateFile: 6 DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf27 Dec 2023
Proforma of Agreement for saleFile: PROFORMA OF AGREEMENT FOR SALE 1 TO 20 PAGES.pdf27 Dec 2023
Proforma of Agreement for saleFile: PROFORMA OF AGREEMENT FOR SALE 21 TO 39 PAGES.pdf27 Dec 2023
Proforma of Allotment letterFile: PROFORMA OF ALLOTMENT LETTER.pdf27 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK DETAILS.pdf27 Dec 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT OF ALLOTMENT LETTER.pdf27 Dec 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT OF AGREEMENT FOR SALE.pdf27 Dec 2023

How this compares with Nagpur

24%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ORCHID INFINITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBAZARI2,800+ in Nagpur

2 kmORCHID INFINITYCompleted 10Lapsed / revoked 6Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: LANDMARKS ORCHID INFRA

LANDMARKS ORCHID INFRA has 2 registrations on MahaRERA, including ORCHID INFINITY and ORCHID SHIVNERI. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ORCHID INFINITY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ORCHID INFINITY?

The registered promoter entity is LANDMARKS ORCHID INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ORCHID INFINITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ORCHID INFINITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ORCHID INFINITY?

The professionals named in the filing: Architect: VAISHALI GAIKWAD; Engineer: AFSAR R AHAMAD; Engineer: AKSHAY KUMAR RAJENDRA JAISWAL; Engineer: ASHISH Y SONI; Chartered Accountant: CA ANKIT TALREJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ORCHID INFINITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ORCHID INFINITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ORCHID INFINITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.