Home / Browse projects / Nagpur, Maharashtra / ORANGE CITY PARK Phase 2

Registered No litigation declared Residential / Group Housing project

ORANGE CITY PARK Phase 2

By MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED

RG-MH-60067 · RERA P50500076856 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
1 of 44Construction stages doneacross 4 buildings; furthest along: Plinth, 30%
140 of 140Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

ORANGE CITY PARK Phase 2 is a Residential / Group Housing project by MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500076856 on 3 Jul 2024. Possession is promised by 31 Dec 2028. 0 of the 140 units on this registration are recorded sold or booked, and 1 of 44 construction stages are filed complete.

At a glance

Project

  • NameORANGE CITY PARK Phase 2
  • TypeResidential / Group Housing
  • Location
    • HINGNA
    • WANADONGRI
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 441110
  • Pincode441110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500076856
  • ReraGenie IDRG-MH-60067

Builder

  • NameMILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsRABAB MAIMOON, KHUZAIMA KUTUBUDDIN MAIMOON
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jul 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed63 files

Current status

0%0 of 140 units booked
11.3%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA881120112
BUILDING NO 2NA22606
BUILDING NO 3NA2212012
BUILDING NO 4NA2210010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Plinth, at 30%.

BUILDING NO 113%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth30%
Stilt Floor10%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed73

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots73
Closed/Covered28
Open Space45
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 128028
BUILDING NO 201717
BUILDING NO 301414
BUILDING NO 401414

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Apr 2026

Approvals and building plan

Sanctioning authorityMaharashtra Housing And Area Development Authority
Permissible FSI9232.77
Proposed, not sanctioned9,233 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR,PATNI BHAVAN, GANDHIBAGH,NAGPUR 440002
Estimated costRs 17.98 cr
Cost incurredRs 2.03 cr
Work done11.31%
BuildingWingEstimatedIncurred
BUILDING NO 1NARs 13.25 crRs 1.64 cr
BUILDING NO 3NARs 2.22 crRs 18.32 lakh
BUILDING NO 4NARs 1.40 crRs 11.56 lakh
BUILDING NO 2NARs 1.11 crRs 9.16 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectALOK LUNIA
EngineerASHFAQUE HUSAIN
Chartered AccountantNooruddin Husain
PartnerRole in project
MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 April-June25.pdf9 May 2026
Withdrawal Update Form 2File: Form 2.pdf9 May 2026
Withdrawal Update Form 3File: apr-jun 25 (2)_compressed.pdf9 May 2026
Withdrawal Update Form 1File: Form-1 April-June25.pdf7 Apr 2026
Withdrawal Update Form 1File: Form-1 April-June25.pdf7 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf7 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf7 Apr 2026
Withdrawal Update Form 3File: apr-jun 25 (2)_compressed.pdf7 Apr 2026
Withdrawal Update Form 3File: apr-jun 25 (2)_compressed.pdf7 Apr 2026
Withdrawal Update Form 1File: Form-1 April-June25.pdf23 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf23 Dec 2025
Withdrawal Update Form 3File: apr-jun 25 (2)_compressed.pdf23 Dec 2025
Withdrawal Update Form 1File: Form-1 April-June25.pdf28 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf28 Aug 2025
Withdrawal Update Form 3File: apr-jun 25 (2)_compressed.pdf28 Aug 2025
Form 1File: Form-1July-sep24.pdf12 Aug 2025
Form 2File: Engineer Certificate July24 - Sep24).pdf12 Aug 2025
Form 3File: CA Certificate (July24-Sep24)_compressed.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory July-sep24.pdf12 Aug 2025
Form 1File: Form-1 Oct-Dec24.pdf12 Aug 2025
Form 2File: Engineer Certificate (Oct24 - Dec24).pdf12 Aug 2025
Form 3File: CA Certificate (Oct24-Dec24)_compressed.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory oct-dec24.pdf12 Aug 2025
Form 1File: Form-1 Jan-March25.pdf12 Aug 2025
Form 2File: Engineer Certificate (Jan25 - Mar25).pdf12 Aug 2025
Form 3File: CA Certificate (Jan25-Mar25)_compressed.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Jan-March25.pdf12 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer Certificate - DONE.pdf1 Jul 2024
Other - LegalFile: sale deed orange.pdf17 Jun 2024
Other - LegalFile: sale deed orange 2.pdf17 Jun 2024
Other - LegalFile: 7-12.pdf17 Jun 2024
Building plan approvalFile: BUILDING-1_compressed.pdf17 May 2024
Building plan approvalFile: Building2_compressed.pdf17 May 2024
Building plan approvalFile: Building3_compressed.pdf17 May 2024
Building plan approvalFile: Building4_compressed.pdf17 May 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING-1_compressed.pdf17 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Building2_compressed.pdf17 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Building3_compressed.pdf17 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Building4_compressed.pdf17 May 2024
Commencement Certificates / NA Order for plotted developmentFile: cc verification mail.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 ornage phase 2.pdf16 Apr 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL (1).pdf8 Mar 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL (1).pdf8 Mar 2024
Other - TechnicalFile: ANNEXURE-A ORDER 50.pdf8 Mar 2024
Layout approvalFile: 246 LAYOUT_compressed.pdf2 Sep 2023
Building plan approvalFile: 246 BUILDING PLAN -1_compressed.pdf2 Sep 2023
PAN CardFile: MILLENNIUM PAN 1.pdf2 Sep 2023
Copy of the legal title reportFile: Legal Title Report.pdf2 Sep 2023
Details of encumbrances concerned to FinanceFile: eNCUMBRANCE.pdf2 Sep 2023
Details of encumbrances concerned to LegalFile: eNCUMBRANCE.pdf2 Sep 2023
Copy of Layout Approval (in case of layout)File: 246 LAYOUT_compressed.pdf2 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 246 BUILDING PLAN -1_compressed.pdf2 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 246.pdf2 Sep 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf2 Sep 2023
Declaration in FORM BFile: fORM b.pdf2 Sep 2023
CERSAI detailsFile: cERSAI.pdf2 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 ORANGE (1).pdf2 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of intrest (1).pdf2 Sep 2023
Proforma of Agreement for saleFile: Agreement.pdf2 Sep 2023
Proforma of Allotment letterFile: Allotment letter.pdf2 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seprate account disclouser.pdf2 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation Alottment.pdf2 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Deviation AGREEMENT.pdf2 Sep 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ORANGE CITY PARK Phase 1P50500035027wanadongri, Nagpur133Apr 2022OngoingDec 2027Not due yet

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ORANGE CITY PARK Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WANADONGRI2,800+ in Nagpur

2 kmORANGE CITY PARK Phase 2Completed 18Lapsed / revoked 9Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED

MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED has 3 registrations on MahaRERA, including ORANGE CITY PARK Phase 1 and Orange Nagri. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ORANGE CITY PARK Phase 2 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ORANGE CITY PARK Phase 2?

The registered promoter entity is MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ORANGE CITY PARK Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ORANGE CITY PARK Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ORANGE CITY PARK Phase 2?

The professionals named in the filing: Architect: ALOK LUNIA; Engineer: ASHFAQUE HUSAIN; Chartered Accountant: Nooruddin Husain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ORANGE CITY PARK Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ORANGE CITY PARK Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ORANGE CITY PARK Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.