Home / Browse projects / Nagpur, Maharashtra / ORANGE CITY PARK Phase 1

Registered No litigation declared Residential / Group Housing project

ORANGE CITY PARK Phase 1

By MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED

RG-MH-04045 · RERA P50500035027 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
15 of 33Construction stages doneacross 3 buildings; furthest along: Plinth, 60%
133 of 133Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

ORANGE CITY PARK Phase 1 is a Residential / Group Housing project by MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500035027 on 29 Apr 2022. Possession is promised by 31 Dec 2027. 0 of the 133 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameORANGE CITY PARK Phase 1
  • TypeResidential / Group Housing
  • Location
    • hingna
    • wanadongri
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 441110
  • Pincode441110
  • RERA no.P50500035027
  • ReraGenie IDRG-MH-04045

Builder

  • NameMILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsRABAB MAIMOON, KHUZAIMA KUTUBUDDIN MAIMOON
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed85 files

Current status

0%0 of 133 units booked
73.9%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA2471120112
Building 2NA62909
Building No 3NA6212012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Plinth, at 60%.

WING A34%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth60%
Stilt Floor45%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building 264%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 364%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed210

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots210
Closed/Covered55
Open Space155
BuildingClosed/CoveredOpen SpaceTotal
WING A51155206
Building 2202
Building No 3202

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,900 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Aug 2025

Approvals and building plan

Sanctioning authorityMaharashtra Housing And Area Development Authority
Permissible FSI8532.6
Proposed, not sanctioned8,533 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHAL, NAGPUR
Estimated costRs 17.98 cr
Cost incurredRs 13.30 cr
Work done73.94%
BuildingWingEstimatedIncurred
WING ANARs 13.57 crRs 9.71 cr
Building No 3NARs 2.27 crRs 2.14 cr
Building 2NARs 1.59 crRs 1.45 cr
-NARs 54.95 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectALOK LUNIA
EngineerASHFAQUE HUSAIN
Chartered AccountantNooruddin Husain
PartnerRole in project
MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501529Nidhey Nitin IndurkarMILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED08/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Apr -Jun 25.pdf21 May 2026
Withdrawal Update Form 2File: FORM 2 JAN-MAR 2025 380.pdf21 May 2026
Withdrawal Update Form 3File: form3 jan-mar 2025 380_compressed.pdf21 May 2026
Withdrawal Update Form 1File: Apr -Jun 25.pdf7 Apr 2026
Withdrawal Update Form 2File: FORM 2 JAN-MAR 2025 380.pdf7 Apr 2026
Withdrawal Update Form 3File: form3 jan-mar 2025 380_compressed.pdf7 Apr 2026
Withdrawal Update Form 1File: Apr -Jun 25.pdf23 Dec 2025
Withdrawal Update Form 2File: FORM 2 JAN-MAR 2025 380.pdf23 Dec 2025
Withdrawal Update Form 3File: form3 jan-mar 2025 380_compressed.pdf23 Dec 2025
Withdrawal Update Form 1File: Apr -Jun 25.pdf2 Sep 2025
Withdrawal Update Form 1File: Apr -Jun 25.pdf2 Sep 2025
Withdrawal Update Form 2File: FORM 2 JAN-MAR 2025 380.pdf2 Sep 2025
Withdrawal Update Form 2File: FORM 2 JAN-MAR 2025 380.pdf2 Sep 2025
Withdrawal Update Form 3File: form3 jan-mar 2025 380_compressed.pdf2 Sep 2025
Withdrawal Update Form 3File: form3 jan-mar 2025 380_compressed.pdf2 Sep 2025
Form 1File: Apr-Jun 24.pdf1 Sep 2025
Form 2File: FORM 2 APR-JUN 2024 380.pdf1 Sep 2025
Form 3File: form 3 apr-jun 2024 380_compressed.pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: Apr-Jun 24.pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: July-Sep 2024.pdf1 Sep 2025
Form 3File: form 3 jul-sep 2024 380_compressed.pdf1 Sep 2025
Form 2File: FORM 2 JUL-SEP 2024 380.pdf1 Sep 2025
Form 1File: jul-Sep 24.pdf1 Sep 2025
Form 1File: Oct -Dec 24.pdf1 Sep 2025
Form 2File: FORM 2 OCT-DEC 2024 380.pdf1 Sep 2025
Form 3File: form 3 oct-dec2024 380_compressed.pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: Oct - Dec 24.pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: Jan-March 25.pdf1 Sep 2025
Form 3File: form3 jan-mar 2025 380_compressed.pdf1 Sep 2025
Form 2File: FORM 2 JAN-MAR 2025 380.pdf1 Sep 2025
Form 1File: Apr -Jun 25.pdf1 Sep 2025
Form 1File: Apr-Jun 23.pdf29 Aug 2025
Form 2File: form 2 apr-jun 2023 380.pdf29 Aug 2025
Form 3File: form3 380 apr-jun 2023_compressed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Apr-Jun 23.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Jul-Sep 2023.pdf29 Aug 2025
Form 1File: Jul-Sep 23.pdf29 Aug 2025
Form 2File: form2 jul-sep 2023 380.pdf29 Aug 2025
Form 3File: form 3 jul-sep 2023_compressed.pdf29 Aug 2025
Form 3File: form 3 380 oct-dec 2023_compressed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Oct - Dec 2023.pdf29 Aug 2025
Form 1File: Oct-Dec 23.pdf29 Aug 2025
Form 2File: form2 oct-dec 2023 380.pdf29 Aug 2025
Form 1File: Jan-March 24.pdf29 Aug 2025
Form 2File: form2 jan-mar 2024 380.pdf29 Aug 2025
Form 3File: Form3 380 jan-mar 2024_compressed.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: Jan-March 2024.pdf29 Aug 2025
Form 1File: Apr-Jun 22.pdf27 Aug 2025
Form 2File: form 2 380 apr-jun 2022.pdf27 Aug 2025
Form 3File: form3 380 apr-jun 2022_compressed.pdf27 Aug 2025
Disclosure of Sold and Booked InventoryFile: Apr-Jun 2022.pdf27 Aug 2025
Disclosure of Sold and Booked InventoryFile: Jul-Sep 2022.pdf27 Aug 2025
Form 1File: Jul-Sep 22.pdf27 Aug 2025
Form 2File: form 2 380 july-sep 2022.pdf27 Aug 2025
Form 3File: form 3 380 july-sep 2022_compressed.pdf27 Aug 2025
Form 3File: form 3 380 oct-dec 2022_compressed.pdf27 Aug 2025
Form 1File: Oct-Dec 22.pdf27 Aug 2025
Form 2File: form 2 380 oct-dec2022.pdf27 Aug 2025
Disclosure of Sold and Booked InventoryFile: Oct-Dec 2022.pdf27 Aug 2025
Disclosure of Sold and Booked InventoryFile: Jan-march 2023.pdf27 Aug 2025
Form 1File: Jan-March 23.pdf27 Aug 2025
Form 2File: form2 380 jan-mar2023.pdf27 Aug 2025
Form 3File: form3 380 jan-mar 2023_compressed.pdf27 Aug 2025
Building plan approvalFile: scan415.pdf28 Apr 2022
Building plan approvalFile: scan416.pdf28 Apr 2022
Building plan approvalFile: scan418.pdf28 Apr 2022
Building plan approvalFile: scan419.pdf28 Apr 2022
Building plan approvalFile: scan421.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: scan415.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: scan416.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: scan418.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: scan419.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: scan421.pdf28 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca CERTIFICATE NEW FORMAT_compressed (1).pdf28 Apr 2022
Details of encumbrancesFile: emcumbrance.pdf18 Apr 2022
Declaration about Commencement CertificateFile: Fomat D.pdf18 Apr 2022
CERSAI detailsFile: CERSAI.pdf18 Apr 2022
Proforma of Allotment letterFile: Allotment letter.pdf18 Apr 2022
Copy of the legal title reportFile: Wanadongri Title Report 001-converted-compressed.pdf13 Apr 2022
Layout approvalFile: Layout map.pdf19 Mar 2022

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ORANGE CITY PARK Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near wanadongri2,800+ in Nagpur

Builder: MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED

MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED has 3 registrations on MahaRERA, including ORANGE CITY PARK Phase 1 and Orange Nagri. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ORANGE CITY PARK Phase 1 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ORANGE CITY PARK Phase 1?

The registered promoter entity is MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ORANGE CITY PARK Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ORANGE CITY PARK Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ORANGE CITY PARK Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ORANGE CITY PARK Phase 1?

The professionals named in the filing: Architect: ALOK LUNIA; Engineer: ASHFAQUE HUSAIN; Chartered Accountant: Nooruddin Husain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ORANGE CITY PARK Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ORANGE CITY PARK Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ORANGE CITY PARK Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.