Home / Browse projects / Nagpur, Maharashtra / ORANGE CITY PARK Phase 1
ORANGE CITY PARK Phase 1
By MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED
RG-MH-04045 · RERA P50500035027 · Last updated on MahaRERA portal: 21 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ORANGE CITY PARK Phase 1 is a Residential / Group Housing project by MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500035027 on 29 Apr 2022. Possession is promised by 31 Dec 2027. 0 of the 133 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameORANGE CITY PARK Phase 1
- TypeResidential / Group Housing
- Location
- hingna
- wanadongri
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 441110
- Pincode441110
- RERA no.P50500035027
- ReraGenie IDRG-MH-04045
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Apr 2022
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings3 building records
- Documents filed85 files
Current status
Figures as on 21 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 24 | 7 | 112 | 0 | 112 |
| Building 2 | NA | 6 | 2 | 9 | 0 | 9 |
| Building No 3 | NA | 6 | 2 | 12 | 0 | 12 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Plinth, at 60%.
WING A34%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 60% |
| Stilt Floor | 45% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 264%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 364%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed210
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING A | 51 | 155 | 206 |
| Building 2 | 2 | 0 | 2 |
| Building No 3 | 2 | 0 | 2 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 13.57 cr | Rs 9.71 cr |
| Building No 3 | NA | Rs 2.27 cr | Rs 2.14 cr |
| Building 2 | NA | Rs 1.59 cr | Rs 1.45 cr |
| - | NA | Rs 54.95 lakh | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ALOK LUNIA |
| Engineer | ASHFAQUE HUSAIN |
| Chartered Accountant | Nooruddin Husain |
| Partner | Role in project |
|---|---|
| MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12501529 | Nidhey Nitin Indurkar | MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED | 08/05/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Apr -Jun 25.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: FORM 2 JAN-MAR 2025 380.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: form3 jan-mar 2025 380_compressed.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: Apr -Jun 25.pdf | 7 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 JAN-MAR 2025 380.pdf | 7 Apr 2026 |
| Withdrawal Update Form 3File: form3 jan-mar 2025 380_compressed.pdf | 7 Apr 2026 |
| Withdrawal Update Form 1File: Apr -Jun 25.pdf | 23 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 JAN-MAR 2025 380.pdf | 23 Dec 2025 |
| Withdrawal Update Form 3File: form3 jan-mar 2025 380_compressed.pdf | 23 Dec 2025 |
| Withdrawal Update Form 1File: Apr -Jun 25.pdf | 2 Sep 2025 |
| Withdrawal Update Form 1File: Apr -Jun 25.pdf | 2 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2 JAN-MAR 2025 380.pdf | 2 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2 JAN-MAR 2025 380.pdf | 2 Sep 2025 |
| Withdrawal Update Form 3File: form3 jan-mar 2025 380_compressed.pdf | 2 Sep 2025 |
| Withdrawal Update Form 3File: form3 jan-mar 2025 380_compressed.pdf | 2 Sep 2025 |
| Form 1File: Apr-Jun 24.pdf | 1 Sep 2025 |
| Form 2File: FORM 2 APR-JUN 2024 380.pdf | 1 Sep 2025 |
| Form 3File: form 3 apr-jun 2024 380_compressed.pdf | 1 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Apr-Jun 24.pdf | 1 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: July-Sep 2024.pdf | 1 Sep 2025 |
| Form 3File: form 3 jul-sep 2024 380_compressed.pdf | 1 Sep 2025 |
| Form 2File: FORM 2 JUL-SEP 2024 380.pdf | 1 Sep 2025 |
| Form 1File: jul-Sep 24.pdf | 1 Sep 2025 |
| Form 1File: Oct -Dec 24.pdf | 1 Sep 2025 |
| Form 2File: FORM 2 OCT-DEC 2024 380.pdf | 1 Sep 2025 |
| Form 3File: form 3 oct-dec2024 380_compressed.pdf | 1 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Oct - Dec 24.pdf | 1 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Jan-March 25.pdf | 1 Sep 2025 |
| Form 3File: form3 jan-mar 2025 380_compressed.pdf | 1 Sep 2025 |
| Form 2File: FORM 2 JAN-MAR 2025 380.pdf | 1 Sep 2025 |
| Form 1File: Apr -Jun 25.pdf | 1 Sep 2025 |
| Form 1File: Apr-Jun 23.pdf | 29 Aug 2025 |
| Form 2File: form 2 apr-jun 2023 380.pdf | 29 Aug 2025 |
| Form 3File: form3 380 apr-jun 2023_compressed.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Apr-Jun 23.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Jul-Sep 2023.pdf | 29 Aug 2025 |
| Form 1File: Jul-Sep 23.pdf | 29 Aug 2025 |
| Form 2File: form2 jul-sep 2023 380.pdf | 29 Aug 2025 |
| Form 3File: form 3 jul-sep 2023_compressed.pdf | 29 Aug 2025 |
| Form 3File: form 3 380 oct-dec 2023_compressed.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Oct - Dec 2023.pdf | 29 Aug 2025 |
| Form 1File: Oct-Dec 23.pdf | 29 Aug 2025 |
| Form 2File: form2 oct-dec 2023 380.pdf | 29 Aug 2025 |
| Form 1File: Jan-March 24.pdf | 29 Aug 2025 |
| Form 2File: form2 jan-mar 2024 380.pdf | 29 Aug 2025 |
| Form 3File: Form3 380 jan-mar 2024_compressed.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Jan-March 2024.pdf | 29 Aug 2025 |
| Form 1File: Apr-Jun 22.pdf | 27 Aug 2025 |
| Form 2File: form 2 380 apr-jun 2022.pdf | 27 Aug 2025 |
| Form 3File: form3 380 apr-jun 2022_compressed.pdf | 27 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Apr-Jun 2022.pdf | 27 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Jul-Sep 2022.pdf | 27 Aug 2025 |
| Form 1File: Jul-Sep 22.pdf | 27 Aug 2025 |
| Form 2File: form 2 380 july-sep 2022.pdf | 27 Aug 2025 |
| Form 3File: form 3 380 july-sep 2022_compressed.pdf | 27 Aug 2025 |
| Form 3File: form 3 380 oct-dec 2022_compressed.pdf | 27 Aug 2025 |
| Form 1File: Oct-Dec 22.pdf | 27 Aug 2025 |
| Form 2File: form 2 380 oct-dec2022.pdf | 27 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Oct-Dec 2022.pdf | 27 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Jan-march 2023.pdf | 27 Aug 2025 |
| Form 1File: Jan-March 23.pdf | 27 Aug 2025 |
| Form 2File: form2 380 jan-mar2023.pdf | 27 Aug 2025 |
| Form 3File: form3 380 jan-mar 2023_compressed.pdf | 27 Aug 2025 |
| Building plan approvalFile: scan415.pdf | 28 Apr 2022 |
| Building plan approvalFile: scan416.pdf | 28 Apr 2022 |
| Building plan approvalFile: scan418.pdf | 28 Apr 2022 |
| Building plan approvalFile: scan419.pdf | 28 Apr 2022 |
| Building plan approvalFile: scan421.pdf | 28 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan415.pdf | 28 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan416.pdf | 28 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan418.pdf | 28 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan419.pdf | 28 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan421.pdf | 28 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca CERTIFICATE NEW FORMAT_compressed (1).pdf | 28 Apr 2022 |
| Details of encumbrancesFile: emcumbrance.pdf | 18 Apr 2022 |
| Declaration about Commencement CertificateFile: Fomat D.pdf | 18 Apr 2022 |
| CERSAI detailsFile: CERSAI.pdf | 18 Apr 2022 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 18 Apr 2022 |
| Copy of the legal title reportFile: Wanadongri Title Report 001-converted-compressed.pdf | 13 Apr 2022 |
| Layout approvalFile: Layout map.pdf | 19 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ORANGE CITY PARK Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near wanadongri2,800+ in Nagpur
A2 Universal
Aditya Anagha Multi State Credit Co-Operat
Nagpur Marina
HOABL Impactum Land Private Limited
CANAL FRONT-02
SHIVAJI LAND BUILDERS AND DEVELOPERS
MAuli Nagar 12
P SQUARE REALTY
KANCHAN NAGARI 7
SHUBH INFRASTRUCTURE
MAULI TOWN- 21
KIRTISAGAR REALTY PRIVATE LIMITED
See every Nagpur project, with the district possession charts
Builder: MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED
MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED has 3 registrations on MahaRERA, including ORANGE CITY PARK Phase 1 and Orange Nagri. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if ORANGE CITY PARK Phase 1 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ORANGE CITY PARK Phase 1?
The registered promoter entity is MILLENIUM DEVELOPERS AND PROMOTERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ORANGE CITY PARK Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ORANGE CITY PARK Phase 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ORANGE CITY PARK Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ORANGE CITY PARK Phase 1?
The professionals named in the filing: Architect: ALOK LUNIA; Engineer: ASHFAQUE HUSAIN; Chartered Accountant: Nooruddin Husain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ORANGE CITY PARK Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback