ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / ONE REVENUE

Completed No litigation declared Residential / Group Housing project

ONE REVENUE

By KAILASH KANHAIYALAL GIDWANI

RG-MH-22762 · RERA P53100032225 · Last updated on MahaRERA portal: 23 May 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

ONE REVENUE is a Residential / Group Housing project by KAILASH KANHAIYALAL GIDWANI in Sangli, Maharashtra, registered with MahaRERA as P53100032225 on 15 Dec 2021. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameONE REVENUE
  • TypeResidential / Group Housing
  • Location
    • NEAR BAPAT MALA GULMOHAR COLONY SANGLI
    • NEAR BAPAT MALA
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • RERA no.P53100032225
  • ReraGenie IDRG-MH-22762

Builder

  • NameKAILASH KANHAIYALAL GIDWANI
  • Entity typeOthers
  • Named personskailash kanhaiyalal gidwani, sunil kanhaiyalal gidwani

Key dates

this monthRegisteredDec 2021PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Dec 2021
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ONE REVENUENA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ONE REVENUE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered18

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area663 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1672.17
Proposed, not sanctioned1,672 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCs no 13501 Sangli Miraj Road Rajarshi Shahu Arcade Sangli Maharashtra 416416

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN KANOJE
EngineerSHITAL KAVATHEKAR
EngineerSAJAN B CHAVAN
Chartered AccountantYASHPRASAD R SABANE
Chartered AccountantPRUTHVIRAJ M PAWAR
PartnerRole in project
KAILASH KANHAIYALAL GIDWANI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 May 2024

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION.pdf23 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: FROM 4.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf20 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ONE REVENUE - Quality Assurance - MARCH 2023.pdf20 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf20 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3_11zon.pdf20 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ONE REVENUE-FORM 5-CA- JUNE 2023.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ONE REVENUE - Architect Certificate - SEPT 2023.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: One Revenue Inventory Sept 2023.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3.pdf12 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ONE REVENUE - FORMAT A - Declaration of Seperate Bank Account - SEPT 2023.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ar Certificate for 30 9 23.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ONE REVENUE-FORM 2-ENGINEER CERTIFICATE- JUNE 2023.pdf6 Jul 2023
Disclosure of sold/ booked inventoryFile: ONE REVENUE-INVENTORY - JUNE 2023 (1).pdf6 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ONE REVENUE-FORM 3-CA - JUNE 2023_11zon.pdf6 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ONE REVENUE - FORM 2 ANNEXURE B - ENGINEERS CERTIFICATE - MARCH 2023 (1).pdf9 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ONE REVENUE FORM 3 - MARCH 2023 NEW.pdf9 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ONE REVENUE - ANNEXURE F - Form 5 - MARCH 2023.pdf9 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: One Revenue - FORM 1 Architect Certificate - March 2023.pdf10 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ONE REVENUE - FORM 2 ANNEXURE B - ENGINEERS CERTIFICATE - MARCH 2023_11zon.pdf10 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY 21-22.pdf10 May 2023
Disclosure of sold/ booked inventoryFile: ONE REVENUE - INVENTORY - MARCH 2023.pdf10 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ONE REVENUE FORM 3 MAR.pdf10 May 2023
Building plan approvalFile: ONE REVENUE APPROVED PLAN - NOV 2022_11zon.pdf13 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: ONE REVENUE APPROVED PLAN - NOV 2022_11zon.pdf13 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: One Revenue construction permission SKMC - Nov 2022.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: One Revenue - ANNEXURE A - FORM 1- Architect certificate - SEPT 2022.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: One Revenue - ANNEXURE A -FORM 1.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ONE REVENUE - ANNEXURE B FORM 2 - ENGINEER CERTIFICATE - SEPT 2022.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ONE REVENUE - ANNEXURE B - FORM 2 - ENGINEER CERTIFICATE - DEC 2022.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: ONE REVENUE - INVENTORY- SEPT 2022.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: ONE REVENUE - INVENTORY DEC 2022.pdf13 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ONE REVENUE - Form 3- Sept 2022_11zon.pdf13 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ONE REVENUE - Form 3-CA CERTIFICATE - Dec 2022_11zon.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.pdf13 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE CERTIFICATE.pdf13 Oct 2022
Disclosure of sold/ booked inventoryFile: SOLD - BOOKED INVENTORY.pdf13 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-compressed.pdf13 Oct 2022
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION FORM B.pdf9 Dec 2021
Declaration in FORM BFile: KAILASH GIDWANI FORM B.pdf9 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf9 Dec 2021
CERSAI detailsFile: CERSAI_Search_Report.pdf4 Dec 2021
Layout approvalFile: ORIGINAL NAKASHA.pdf23 Nov 2021
Building plan approvalFile: dwg.pdf23 Nov 2021
PAN CardFile: PAN CARD- KAILASH GIDWANI.pdf23 Nov 2021
PAN CardFile: PAN CARD- SUNIL GIDWANI.pdf23 Nov 2021
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf23 Nov 2021
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf23 Nov 2021
Copy of Layout Approval (in case of layout)File: ORIGINAL NAKASHA.pdf23 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: dwg.pdf23 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: BANDHKAM PARVANA.pdf23 Nov 2021
Declaration about Commencement CertificateFile: FORMAT D.pdf23 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf23 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 ENGINEER CERTIFICATE.pdf23 Nov 2021
Proforma of Allotment letterFile: agreement of sale.pdf23 Nov 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf23 Nov 2021
OtherFile: PROPERTY CARD.pdf23 Nov 2021

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep ONE REVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR BAPAT MALA790+ in Sangli

Builder: KAILASH KANHAIYALAL GIDWANI

KAILASH KANHAIYALAL GIDWANI has 1 registration on MahaRERA, including ONE REVENUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if ONE REVENUE is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ONE REVENUE?

The registered promoter entity is KAILASH KANHAIYALAL GIDWANI, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ONE REVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ONE REVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ONE REVENUE?

The professionals named in the filing: Architect: SACHIN KANOJE; Engineer: SHITAL KAVATHEKAR; Engineer: SAJAN B CHAVAN; Chartered Accountant: YASHPRASAD R SABANE; Chartered Accountant: PRUTHVIRAJ M PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ONE REVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ONE REVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ONE REVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.