Home / Browse projects / Pune, Maharashtra / ONE RESIDENCY PHASE 1

Completed No litigation declared Residential / Group Housing project

ONE RESIDENCY PHASE 1

By RAVIRAJ REALTY DEVELOPERS LLP

RG-MH-82180 · RERA P52100047267 · Last updated on MahaRERA portal: 13 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 13 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
1 of 138Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 198 documents Report an error

ONE RESIDENCY PHASE 1 is a Residential / Group Housing project by RAVIRAJ REALTY DEVELOPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100047267 on 17 Oct 2022. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 13 months from the original filing. 137 of the 138 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameONE RESIDENCY PHASE 1
  • TypeResidential / Group Housing
  • Location
    • NEAR MUMBAI BANGLORE HIGHWAY
    • AMBEGAON BK
    • AMBEGAON KH
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047267
  • ReraGenie IDRG-MH-82180

Builder

  • NameRAVIRAJ REALTY DEVELOPERS LLP
  • Entity typePartnership
  • PartnersABHINANDAN RAVINDRA SAKLA, RAVINDRA NAUPATLAL SAKLA
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2022First promiseMay 2025Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Oct 2022
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 May 2025)
  • Buildings1 building record
  • Documents filed198 files

Current status

99%137 of 138 units booked
87.9%Work done, per cost certificate

Figures as on 13 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA17141380138

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

A BUILDING: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed207

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots207
Closed/Covered207

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,200 sq m
Land owned byThe promoter
Named landownersNone
Declared on25 Sep 2024

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI8551.98
Proposed, not sanctioned8,552 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch613 - B, Parsi Agiyary Compound, New Nana Peth, Pune, 411002
Estimated costRs 24.00 cr
Cost incurredRs 21.09 cr
Work done87.86%
BuildingWingEstimatedIncurred
A BUILDINGNARs 20.52 crRs 18.03 cr
-NARs 3.48 crRs 3.06 cr

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE ARCH STUDIO
ArchitectLIASONING ARC WALHEKAR ASSOCITES
EngineerRCC Spectrum Consultants
EngineerMahadev Todkar
EngineerSadik Ali Akbar Nayakwdi
Chartered AccountantAMOL LAHOTI
Chartered AccountantASAK & Co
Chartered AccountantPatel & Sharma
Chartered AccountantVipin Gujrathi and associates
Chartered AccountantAgarwal Sarawgi and Associates
PartnerRole in project
RAVIRAJ REALTY DEVELOPERS LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019300May 2025 → Dec 2025

Reason as filed by the promoterThe project is facing delays due to a severe labor shortage, resulting in the unavailability of skilled workers. Additionally, the contractor's performance has been adversely affected, leading to inefficiencies and compromised work quality. Given these challenges, requesting an extension becomes imperative to ensure the project's successful completion while maintaining the desired standards and mitigating the impact of unforeseen workforce constraints.

EA05082502294May 2025 → Jun 2026

Reason as filed by the promoterWe would like to submit that the construction schedule of the project has been significantly impacted due to various genuine and unavoidable circumstances beyond the control of the promoter. These factors have cumulatively led to delays in the timely execution of the project as originally planned. The key reasons are detailed below: Disruption in Supply Chain and Delay in Procurement of Construction Materials: One of the primary causes of delay has been the disruption in the supply chain of essential construction materials such as cement, steel, sand, aggregates, plumbing components, electrica

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed198

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 198 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ORP1 - AR CERTIFICATE - WORK COMPLETION - JUNE 2026.pdf13 Jul 2026
Withdrawal Update Form 2File: FORM 2 - ORP1 - JUNE 2026.pdf13 Jul 2026
Withdrawal Update Form 3File: FORM 3 - ORP1 - JUNE 2026.pdf13 Jul 2026
Form 5 (FY 2025-2026)File: FORM 5 - ORP1 - JUNE 2026 Correct.pdf13 Jul 2026
Occupational CertificateFile: OC Verification Mail.pdf13 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A - ORP1 - JUNE 2026.pdf11 Jul 2026
Occupational CertificateFile: ONE RESIDENCY - A BUILDING FULL OC.pdf26 Jun 2026
Building plan approvalFile: Layout Plan Dated 18-07-2024 _.pdf18 Jun 2026
Layout approvalFile: 01 Layout Plan 18-07-2024.pdf18 Jun 2026
Building plan approvalFile: 02 Ground Floor Plan 18-07-2024.pdf18 Jun 2026
Building plan approvalFile: 03 Basement 01 18-07-2024.pdf18 Jun 2026
Building plan approvalFile: 04 Basement 02 18-07-2024.pdf18 Jun 2026
Building plan approvalFile: 05 Wing A - 1st to 14th Floor 18-07-2024.pdf18 Jun 2026
Building plan approvalFile: 06 Section Elevation 18-07-2024.pdf18 Jun 2026
Layout approvalFile: 01 layout plan 26-02-2026 Highlighted.pdf18 Jun 2026
Building plan approvalFile: 02 Ground parking plan 26-02-2026 Highlighted.pdf18 Jun 2026
Building plan approvalFile: 3 Basement 1 parking plan 26-02-2026.pdf18 Jun 2026
Building plan approvalFile: 4 Basement 2 parkingplan 26-02-2026.pdf18 Jun 2026
Building plan approvalFile: 5 Wing A floor plan 26-02-2026.pdf18 Jun 2026
Building plan approvalFile: 6 wing A Elevation plan 26-02-2026.pdf18 Jun 2026
Layout approvalFile: 01 Layout Plan - Highlighted_11zon.pdf23 Apr 2026
Layout approvalFile: 02 Ground Floor Parking Plan Highlighted_11zon.pdf23 Apr 2026
Layout approvalFile: 03 Bsement 1 Parking Floor Plan_11zon.pdf23 Apr 2026
Layout approvalFile: 04 Basement 2 Parking Floor Plan_11zon.pdf23 Apr 2026
Building plan approvalFile: 05 Building A - Typical Floor Plan Highlighted_11zon.pdf23 Apr 2026
Building plan approvalFile: 06 Building A - Elevations_11zon.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1 One Residency Phase I Mar 26.pdf23 Apr 2026
Withdrawal Update Form 2File: Form 2 One Residency Phase II Mar 26.pdf23 Apr 2026
Withdrawal Update Form 3File: Form 3 One Residency Phase I Mar 26.pdf23 Apr 2026
Withdrawal Update Form 1File: ONE RESIDENCY PHASE 1 NO 1.pdf2 Feb 2026
Withdrawal Update Form 2File: ONE RESIDENCY PHASE 1 NO 2.pdf2 Feb 2026
Withdrawal Update Form 3File: ONE RESIDENCY PHASE 1 NO 3.pdf2 Feb 2026
Withdrawal Update Form 1File: OR - PHASE 1 - FORM 1.PDF29 Oct 2025
Withdrawal Update Form 2File: OR - PHASE 1 - FORM 2.PDF29 Oct 2025
Withdrawal Update Form 3File: 00 Form 3 with Sold Unsold.pdf29 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A -ONE RESIDENCY PHASE 1.PDF14 Oct 2025
Form 5 (FY 2024-2025)File: ONE RESIDENCY - Phase 1 - RERA ANNUAL AUDIT.pdf30 Sep 2025
Form 1File: 1 30-12-2022 Ok.pdf8 Aug 2025
Form 2File: 1 31 - 12 - 2022_20240307154024 Ok.pdf8 Aug 2025
Form 3File: 1 FORM3_31-12-22 Ok.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: 1 31 - 12 - 2022_06032024175653 Ok.PDF8 Aug 2025
Disclosure of Sold and Booked InventoryFile: 2 31 - 03 - 2023_06032024175801 Ok.PDF8 Aug 2025
Form 1File: 2 31-03-23 One Residency_08032024151345 Ok.PDF8 Aug 2025
Form 2File: 2 31 - 03 - 2023_20240307154247 Ok.pdf8 Aug 2025
Form 3File: 2 FORM3 31-03-23 Ok.pdf8 Aug 2025
Form 3File: 3 Pre Uploaded June 23Ok.pdf8 Aug 2025
Form 2File: 3 30 - 06 - 2023_20240307154155.pdf8 Aug 2025
Form 1File: 3 Pre Uploaded June 23.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: 3 30 - 06 - 2023_06032024175835 Ok.PDF8 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4 30 - 09 - 2023_06032024175921 Ok.PDF8 Aug 2025
Form 1File: 4 30-09-23 One Residency_08032024151410 Ok.PDF8 Aug 2025
Form 2File: 4 30 - 09 - 2023_07032024131023 Ok.PDF8 Aug 2025
Form 3File: 4 FORM3 30-09-23 Ok.pdf8 Aug 2025
Form 3File: 5 FORM3 31-12-23 Ok.pdf8 Aug 2025
Form 1File: 5 31-12-23 One Residency_08032024151321 Ok.PDF8 Aug 2025
Form 2File: 5 31 - 12 - 2023_20240307154338 Ok.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: 5 31 - 12 - 2023_06032024180000 Ok.PDF8 Aug 2025
Disclosure of Sold and Booked InventoryFile: 6 Mar 24 DISCLOSURE OF SOLD- One Residency.PDF8 Aug 2025
Form 1File: 6 FORM 1 - One Residency Ok Mar 24.PDF8 Aug 2025
Form 2File: 6 FORM 2- One Residency Ok Mar 24.PDF8 Aug 2025
Form 3File: FORM 3- One Residency_compressed Mar 24 Uploaded.pdf8 Aug 2025
Form 1File: ONE RESIDENCY FORM 1 30062024.pdf8 Aug 2025
Form 2File: ONE RESIDENCY Form 2 30062024.PDF8 Aug 2025
Form 3File: ONE RESIDENCY Form 3 30062024 compressed.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: ONE RESIDENCY Sold Unsold 30062024.PDF8 Aug 2025
Form 1File: ONE RESIDENCY - PHASE1 - FORM 1.PDF8 Aug 2025
Form 2File: ONE RESIDENCY - PHASE 1 - FORM 2.PDF8 Aug 2025
Form 3File: ONE RESIDENCY PHASE 1 - FORM 3.PDF8 Aug 2025
Disclosure of Sold and Booked InventoryFile: ONE RESIDENCY - PHASE 1- SOLD UNSOLD.PDF8 Aug 2025
Form 1File: One Residency Phase 1 Form 1.PDF8 Aug 2025
Form 2File: One Residency Phase 1 Form 2.PDF8 Aug 2025
Form 3File: One Residency Phase 1 Form 3.PDF8 Aug 2025
Disclosure of Sold and Booked InventoryFile: One Residency Phase 1 Sold Unsold Inventories.PDF8 Aug 2025
Form 1File: ONE RESIDENCY PHASE1 - ARCHITECT CERTIFICATE.PDF8 Aug 2025
Form 2File: ONE RESIDENCY PHASE 1 - ENGINEERS CERTIFICATE.PDF8 Aug 2025
Form 3File: ONE RESIDENCY PHASE1 - FORM 3 - CA CERTIFICATE.PDF8 Aug 2025
Disclosure of Sold and Booked InventoryFile: ONE RESIDENCY PHASE 1 - DISCLOSURE OF SOLD UNSOLD.PDF8 Aug 2025
Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf8 Aug 2025
Form 2A (FY 2023-2024)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf8 Aug 2025
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf8 Aug 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
WEST AVENUEP52100016725PANDI BHIMSEN KALAMANDIR, Pune184Jun 2018CompletedAug 2023Registered original: Feb 2023Apr 2023

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 13 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ONE RESIDENCY PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBEGAON BK13,700+ in Pune

2 kmONE RESIDENCY PHASE 1Completed 78Lapsed / revoked 30Other 61Dot size: filed unitsN

Filed coordinates, straight-line distance. 169 registered projects within 2 km.

Builder: RAVIRAJ REALTY DEVELOPERS LLP

RAVIRAJ REALTY DEVELOPERS LLP has 2 registrations on MahaRERA, including ONE RESIDENCY PHASE 1 and ONE RESIDENCY PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ONE RESIDENCY PHASE 1 is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ONE RESIDENCY PHASE 1?

The registered promoter entity is RAVIRAJ REALTY DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ONE RESIDENCY PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ONE RESIDENCY PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ONE RESIDENCY PHASE 1?

The professionals named in the filing: Architect: THE ARCH STUDIO; Architect: LIASONING ARC WALHEKAR ASSOCITES; Engineer: RCC Spectrum Consultants; Engineer: Mahadev Todkar; Engineer: Sadik Ali Akbar Nayakwdi; Chartered Accountant: AMOL LAHOTI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ONE RESIDENCY PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ONE RESIDENCY PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ONE RESIDENCY PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.