Home / Browse projects / Sindhudurg, Maharashtra / OMKAR PALM RESIDENCY

Completed No litigation declared Residential / Group Housing project

OMKAR PALM RESIDENCY

By OMKAR REALTY

RG-MH-73390 · RERA P52900017828 · Last updated on MahaRERA portal: 2 Aug 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Aug 2022Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 60%
0Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

OMKAR PALM RESIDENCY is a Residential / Group Housing project by OMKAR REALTY in Sindhudurg, Maharashtra, registered with MahaRERA as P52900017828 on 21 Sep 2018. The registration is recorded completed; possession was promised by 28 Aug 2022.

At a glance

Project

  • NameOMKAR PALM RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Vengurla road
    • Royal palms
    • Sangirde
    • Kudal
    • Sindhudurg
    • 416520
  • Pincode416520
  • RERA no.P52900017828
  • ReraGenie IDRG-MH-73390

Builder

  • NameOMKAR REALTY
  • Entity typePartnership
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2018PromisedAug 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Sep 2018
  • Promised completion28 Aug 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed24 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OMKAR PALM RESIDENCYNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.

OMKAR PALM RESIDENCY: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area660 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI947.76
Proposed, not sanctioned948 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRaje Complex, Shivaji Chowk Panvel

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRupesh Narayan Tawate
PartnerRole in project
OMKAR REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Aug 2021

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: 01.pdf2 Aug 2021
Disclosure of sold/ booked inventoryFile: flat inventory.pdf2 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 02.pdf2 Aug 2021
Form 2AFile: Engg Cert 2 A.pdf8 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc Form 1 Certificate.pdf4 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng.pdf4 Feb 2019
Certificates of CA (Form 3)File: CA Final.pdf4 Feb 2019
Declaration in FORM BFile: Form B Final.pdf31 Aug 2018
Building plan approvalFile: Bldg Layout.pdf29 Aug 2018
Layout approvalFile: Layout Final.pdf29 Aug 2018
PAN CardFile: Company PAN.pdf29 Aug 2018
Copy of the legal title reportFile: Search report new.pdf29 Aug 2018
Details of encumbrancesFile: No Enc No Litigation.pdf29 Aug 2018
Copy of Layout Approval (in case of layout)File: Layout Final.pdf29 Aug 2018
Building Plan Approval (IOD)File: Bldg Layout.pdf29 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Final.pdf29 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc new.pdf29 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng new.pdf29 Aug 2018
Certificates of CA (Form 3)File: CA Final.pdf29 Aug 2018
Proforma of Allotment letterFile: Allotment Letter.pdf29 Aug 2018
Proforma of Allotment letterFile: Draft Agree Final.pdf29 Aug 2018
OtherFile: Partnership Deed new.pdf29 Aug 2018
OtherFile: Index 2 new.pdf29 Aug 2018
OtherFile: Amulgumation new.pdf29 Aug 2018

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is completed

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep OMKAR PALM RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Royal palms530+ in Sindhudurg

Builder: OMKAR REALTY

OMKAR REALTY has 4 registrations on MahaRERA, including Yashwant Datt Greens and OMKAR PALM RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if OMKAR PALM RESIDENCY is delayed beyond 28 Aug 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OMKAR PALM RESIDENCY?

The registered promoter entity is OMKAR REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OMKAR PALM RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OMKAR PALM RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OMKAR PALM RESIDENCY?

The professionals named in the filing: Architect: Rupesh Narayan Tawate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OMKAR PALM RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OMKAR PALM RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OMKAR PALM RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.