OM SHREENATH KRUPA CHS LTD
By OM SHREENATH KRUPA CO OPERATIVE HOUSING SOCIETY LTD
RG-MH-30773 · RERA P51800032074 · Last updated on MahaRERA portal: 4 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
OM SHREENATH KRUPA CHS LTD is a Residential / Group Housing project by OM SHREENATH KRUPA CO OPERATIVE HOUSING SOCIETY LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800032074 on 3 Dec 2021. Possession is promised by 31 Dec 2026. 21 of the 78 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameOM SHREENATH KRUPA CHS LTD
- TypeResidential / Group Housing
- Location
- SUBHASH LANE
- KANDIVALI- WEST
- Borivali
- Mumbai Suburban
- 400067
- Pincode400067
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800032074
- ReraGenie IDRG-MH-30773
Builder
- NameOM SHREENATH KRUPA CO OPERATIVE HOUSING SOCIETY LTD
- Entity typeSociety
- ChairpersonSHAILESH POPATLAL PATEL
- SecretoryJATIN MANUBHAI MEHTA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Dec 2021
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed79 files
Current status
Figures as on 4 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| OM SHREENATH KRUPA CHS LTD | NA | 49 | 16 | 78 | 0 | 78 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.
OM SHREENATH KRUPA CHS LTD: 97% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 4 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 75% |
| Landscaping & Tree Planting | Yes | 40% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 75% |
| Water conservation /Rain water harvesting | Yes | 75% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 75% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| OM SHREENATH KRUPA COOPERATIVE HOUSING SOCIETY | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| OM SHREENATH KRUPA CHS LTD | NA | Rs 12.10 cr | Rs 11.24 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NISHIT SANGHAVI |
| Engineer | DINESH H MEHTA |
| Chartered Accountant | AKORD & CO CA DATTATRAY E BHANAGE |
| Chartered Accountant | R V B & ASSOCIATES |
| Partner | Role in project |
|---|---|
| OM SHREENATH KRUPA CO OPERATIVE HOUSING SOCIETY LTD | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| CIVIL SUIT/0001104/2021/2021 | CITY CIVIL COURT DINDOSHI MUMBAI | THE APPLICATION HAS BEEN REJECTED BY THE BOMBAY CITY CIVIL COURT AT DINDOSHI BORIVALI DIV MUMBAI |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Nov 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: RERA FORM_1_SIGNED_OVK.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: RERA FORM 2 - SINGNED - Q2.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: RERA FORM_3_Q3_SIGNED_FINAL.pdf | 4 Feb 2026 |
| Form 3File: CA CERTIFICATE RERA FORM 3 - SIGNED.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY - SIGNED.pdf | 6 Oct 2025 |
| Form 2File: RERA FORM 2 - OSK.pdf | 6 Oct 2025 |
| Form 1File: RERA FORM 1 - OSK.pdf | 6 Oct 2025 |
| Form 5 (FY 2024-2025)File: CA CERTIFICATE RERA FORM - 5 - SIGNED.pdf | 30 Sep 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 2432377_FurtherCC_signed (1).pdf | 28 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3.pdf | 8 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_SIGNED.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 OM SHREENATH.pdf | 14 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - OM SHREENATH_compressed.pdf | 14 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM - 2 - New.pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM - 5.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM - 1.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - FORM - 3 - SIGNED.pdf | 13 Aug 2024 |
| Building plan approvalFile: DRAWINGS_11zon.pdf | 4 Jun 2024 |
| Layout approvalFile: IOD_04062024.pdf | 4 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: IOD_04062024.pdf | 4 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: DRAWINGS_11zon.pdf | 4 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 4 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM - 2.pdf | 23 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AS ON 310324.pdf | 16 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AS ON 310324_compressed.pdf | 16 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A AS ON 310324_compressed.pdf | 16 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AS ON 310324_compressed.pdf | 16 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - SINGED.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SINGED.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Q3 - SINGED.pdf | 22 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM - 2A - singed.pdf | 26 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed -.pdf | 15 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SIGNED - FORM 2 CERTIFICATE - singed.pdf | 23 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Cerificate.pdf | 22 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - FORM 3 - OM SHREENATH CHSL.pdf | 22 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA FORM 5 FY 2022-23.pdf | 10 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SINGED FORM 1 - CERTIFICATE.pdf | 17 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SIGNED - FORM 2 CERTIFICATE.pdf | 17 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM - 3 - OMK - SINGED - 30062023.pdf | 17 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate.pdf | 13 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf | 13 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_CA Certificate - Signed_compressed.pdf | 13 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE DATED 31_12_2022.pdf | 4 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate_Sign.pdf | 4 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 Sign_compressed.pdf | 28 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Audit Repot Form 5 As on19-09-2022.pdf | 23 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 Architect certificate 300922.pdf | 1 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate Form 2 AS ON 300922.pdf | 1 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Form 3_compressed.pdf | 31 Oct 2022 |
| OtherFile: RERA Audit Repot Form 5 As on19-09-2022.pdf | 20 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 RERA ARCHIT CERTIFICATE DATED 31032022.pdf | 20 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 Architect certificate 30 6 22.pdf | 20 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Enginner Certificate.pdf | 20 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 20 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate as on 31032022.pdf | 10 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_31032022.pdf | 15 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 28 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Compress.pdf | 19 Jan 2022 |
| Details of encumbrancesFile: 03 DETAILS OF ENCUMBRANCES.pdf | 19 Nov 2021 |
| Building plan approvalFile: 05 APPROVED PLAN.pdf | 8 Nov 2021 |
| Building plan approvalFile: 05 FULL CONCENSSION PLAN.pdf | 8 Nov 2021 |
| Layout approvalFile: 4 IOD SIGNED - Copy of Layout Approval.pdf | 8 Nov 2021 |
| PAN CardFile: 1PAN CARD SOCIETY.pdf | 8 Nov 2021 |
| Copy of the legal title reportFile: 2 LEGAL TITLE REPORT.pdf | 8 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: 4 IOD SIGNED - Copy of Layout Approval.pdf | 8 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 05 APPROVED PLAN.pdf | 8 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 05 FULL CONCENSSION PLAN.pdf | 8 Nov 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 6 CC - SIGNED.pdf | 8 Nov 2021 |
| Declaration about Commencement CertificateFile: 7 DECLARATION COMMENCEMENT CERTIFICATE.pdf | 8 Nov 2021 |
| Declaration in FORM BFile: 8 FORM B.pdf | 8 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 ARCHITECT'S CERTIFICATE FORM 1 14102021.pdf | 8 Nov 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 ENGINEERING CERTIFICATE FORM - 2.pdf | 8 Nov 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 CA CERTIFICATE - FORM 3.pdf | 8 Nov 2021 |
| Proforma of Allotment letterFile: 19 OSK PERMANENT ALTERNATE ACCOMMODATION RERA.pdf | 8 Nov 2021 |
| Proforma of Allotment letterFile: 19 AGREEMENT FOR SALE.pdf | 8 Nov 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 22 SOCIETY REG CERTIFICATE.pdf | 8 Nov 2021 |
| OtherFile: 24 OTHER DOCUMENT.pdf | 8 Nov 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep OM SHREENATH KRUPA CHS LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KANDIVALI- WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 407 registered projects within 2 km.
Ruparel Optima Ph I
Ruparel Infra & Realty Pvt Ltd
"SALE BLDG NO. 6 (A & B) WING KNOWN AS NORTHER
N.ROSE DEVELOPERS PVT LTD
JP Commerz
Metallica Industries Limited
Ruparel Skygreens I
Shree Siddhivinayak Infrastructure & Realt
ShreejiAikyam
Rushabh Developers
Shiv Vardaan
NAVKARMIK HOMES LLP, URVI CONSTRUCTION
See every Mumbai Suburban project, with the district possession charts
Builder: OM SHREENATH KRUPA CO OPERATIVE HOUSING SOCIETY LTD
OM SHREENATH KRUPA CO OPERATIVE HOUSING SOCIETY LTD has 1 registration on MahaRERA, including OM SHREENATH KRUPA CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if OM SHREENATH KRUPA CHS LTD is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of OM SHREENATH KRUPA CHS LTD?
The registered promoter entity is OM SHREENATH KRUPA CO OPERATIVE HOUSING SOCIETY LTD, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in OM SHREENATH KRUPA CHS LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for OM SHREENATH KRUPA CHS LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at OM SHREENATH KRUPA CHS LTD?
The professionals named in the filing: Architect: NISHIT SANGHAVI; Engineer: DINESH H MEHTA; Chartered Accountant: AKORD & CO CA DATTATRAY E BHANAGE; Chartered Accountant: R V B & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in OM SHREENATH KRUPA CHS LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback