Completed No litigation declared Residential / Group Housing project

OM RESIDENCY

By OMKAR SHIRISH KANERKAR

RG-MH-66284 · RERA P53000046636 · Last updated on MahaRERA portal: 30 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
94 of 154Construction stages doneacross 14 buildings; furthest along: Internal walls, 95%
3 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

OM RESIDENCY is a Residential / Group Housing project by OMKAR SHIRISH KANERKAR in Kolhapur, Maharashtra, registered with MahaRERA as P53000046636 on 25 Aug 2022. The registration is recorded completed; possession was promised by 30 Jun 2026. 11 of the 14 units on this registration are recorded sold or booked, and 94 of 154 construction stages are filed complete.

At a glance

Project

  • NameOM RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • A WARD
    • DEVKAR PANAND
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416012
  • Pincode416012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000046636
  • ReraGenie IDRG-MH-66284

Builder

  • NameOMKAR SHIRISH KANERKAR
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2022PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2022
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings14 building records
  • Documents filed76 files

Current status

79%11 of 14 units booked
98.7%Work done, per cost certificate

Figures as on 30 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW BUNGALOW UNIT NO 1NA22101
ROW BUNGALOW UNIT NO 2NA22101
ROW BUNGALOW UNIT NO 3NA20101
ROW BUNGALOW UNIT NO 4NA20101
ROW BUNGALOW UNIT NO 5NA20101
ROW BUNGALOW UNIT NO 6NA20101
ROW BUNGALOW UNIT NO 7NA20101
ROW BUNGALOW UNIT NO 8NA20101
ROW BUNGALOW UNIT NO 9NA20101
ROW BUNGALOW UNIT NO 10NA20101
ROW BUNGALOW UNIT NO 11NA20101
ROW BUNGALOW UNIT NO 12NA20101
ROW BUNGALOW UNIT NO 13NA20101
ROW BUNGALOW UNIT NO 14NA20101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building14

As on 30 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

94 of 154 construction stages are filed complete across 14 buildings. The stage furthest along is Internal walls, at 95%.

ROW BUNGALOW UNIT NO 163%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 264%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 364%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 445%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 564%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 664%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 764%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 864%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 964%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 1064%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 1155%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 1264%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 1364%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW BUNGALOW UNIT NO 1464%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered31

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,378 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Nov 2025

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI1360.55
Proposed, not sanctioned1,361 sq m
Buildings approved14
Buildings sanctioned14

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA WARD NALE COLONY KALAMBA ROAD KOLHAPUR
Estimated costRs 65.09 cr
Cost incurredRs 64.22 cr
Work done98.66%
BuildingWingEstimatedIncurred
ROW BUNGALOW UNIT NO 1NARs 4.62 crRs 4.55 cr
ROW BUNGALOW UNIT NO 2NARs 4.62 crRs 4.55 cr
ROW BUNGALOW UNIT NO 3NARs 4.62 crRs 4.55 cr
ROW BUNGALOW UNIT NO 4NARs 4.62 crRs 4.55 cr
ROW BUNGALOW UNIT NO 5NARs 4.62 crRs 4.55 cr
ROW BUNGALOW UNIT NO 6NARs 4.62 crRs 4.55 cr
ROW BUNGALOW UNIT NO 7NARs 4.62 crRs 4.55 cr
ROW BUNGALOW UNIT NO 8NARs 4.62 crRs 4.55 cr
ROW BUNGALOW UNIT NO 9NARs 4.62 crRs 4.55 cr
ROW BUNGALOW UNIT NO 10NARs 4.62 crRs 4.55 cr
ROW BUNGALOW UNIT NO 11NARs 4.62 crRs 4.55 cr
ROW BUNGALOW UNIT NO 12NARs 4.62 crRs 4.55 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASSOCIATED ENGINEERS
EngineerASSOCIATED ENGINEERS
EngineerViraj D Patil
Chartered AccountantM M DHARMADHIKARI
Chartered AccountantAradhana Behati and co
Chartered AccountantNilesh Baheti and co.
Chartered AccountantAshish R Pednekar
PartnerRole in project
OMKAR SHIRISH KANERKAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Jul 2024

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf30 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf30 Mar 2026
Withdrawal Update Form 3File: CA.pdf30 Mar 2026
Form 2A (FY 2022-2023)File: Form 2A.pdf30 Mar 2026
Form 2A (FY 2023-2024)File: Form 2A.pdf30 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf30 Mar 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf30 Mar 2026
Form 5 (FY 2023-2024)File: Form 5 2024.pdf30 Mar 2026
Form 5 (FY 2022-2023)File: Form 5 22.pdf30 Mar 2026
Occupational CertificateFile: COMPLETION LETTER KANERKAR.pdf30 Mar 2026
Withdrawal Update Form 1File: Architect Certificate.pdf10 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf10 Mar 2026
Withdrawal Update Form 3File: CA.pdf10 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 Final.pdf2 Dec 2025
Withdrawal Update Form 1File: Architect Certificate.pdf29 Nov 2025
Withdrawal Update Form 1File: Architect Certificate.pdf29 Nov 2025
Withdrawal Update Form 1File: Architect Sep.pdf29 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf29 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf29 Nov 2025
Withdrawal Update Form 2File: Engineer Sep.pdf29 Nov 2025
Withdrawal Update Form 3File: CA certificate.pdf29 Nov 2025
Withdrawal Update Form 3File: CA certificate.pdf29 Nov 2025
Withdrawal Update Form 3File: CA certificate sep.pdf29 Nov 2025
Architect Certificate29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf29 Apr 2025
Engineer Certificate29 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf29 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed (6).pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory.pdf22 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf25 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_compressed (1).pdf22 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_compressed (2).pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects.pdf5 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 new.pdf23 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf23 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf17 Dec 2022
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory.pdf17 Dec 2022
Proforma of Allotment letterFile: Agreement TO SELL.pdf6 Aug 2022
Layout approvalFile: layout Plan.pdf5 Aug 2022
Building plan approvalFile: Sanctioned Plan.pdf5 Aug 2022
PAN CardFile: PAN.pdf5 Aug 2022
Copy of the legal title reportFile: legal Title Report Compress.pdf5 Aug 2022
Details of encumbrances concerned to FinanceFile: Concern To Finance.pdf5 Aug 2022
Details of encumbrances concerned to LegalFile: concerned to legal.pdf5 Aug 2022
Copy of Layout Approval (in case of layout)File: layout Plan.pdf5 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan.pdf5 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf5 Aug 2022
Declaration about Commencement CertificateFile: Format D.pdf5 Aug 2022
Declaration in FORM BFile: Form B.pdf5 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect Certificate.pdf5 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf5 Aug 2022
CERSAI detailsFile: CERSAI_Search_Report_200244093716_For_Asset_Based_Search_05_08_2022_18_09_20_312.pdf5 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (2).pdf5 Aug 2022
Proforma of Allotment letterFile: Allottment Letter - New.pdf5 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf5 Aug 2022
Deviation Report with respect to Allotment letterFile: No Deviation allotement Letter.pdf5 Aug 2022
Deviation Report with respect to model copy of AgreementFile: No Deviation agreement to sell.pdf5 Aug 2022

How this compares with Kolhapur

79%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep OM RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DEVKAR PANAND880+ in Kolhapur

2 kmOM RESIDENCYCompleted 17Lapsed / revoked 8Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: OMKAR SHIRISH KANERKAR

OMKAR SHIRISH KANERKAR has 1 registration on MahaRERA, including OM RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if OM RESIDENCY is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM RESIDENCY?

The registered promoter entity is OMKAR SHIRISH KANERKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OM RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM RESIDENCY?

The professionals named in the filing: Architect: ASSOCIATED ENGINEERS; Engineer: ASSOCIATED ENGINEERS; Engineer: Viraj D Patil; Chartered Accountant: M M DHARMADHIKARI; Chartered Accountant: Aradhana Behati and co; Chartered Accountant: Nilesh Baheti and co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.