Red flags

  • Completion date moved by 61 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedmoved 61 months from the original
0 of 11Construction stages donefurthest along: Excavation, 95%
53 of 53Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

OM PALACE is a Commercial project by UMIYA BUILDERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010191 on 24 Aug 2017. Possession is promised by 31 Aug 2027. The completion date has moved by 61 months from the original filing. 0 of the 53 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameOM PALACE
  • TypeCommercial
  • Location
    • Andheri
    • Mumbai Suburban
    • 400054
  • Pincode400054
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800010191
  • ReraGenie IDRG-MH-24678

Builder

  • NameUMIYA BUILDERS
  • Entity typePartnership
  • PartnersPOOJA BABLU GOSWAMI, TARANATH MAHALINGA SHETTY

Key dates

this monthRegisteredAug 2017First promiseJul 2022Revised toAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Aug 2017
  • Promised completion31 Aug 2027
  • Revised completionRevised to 31 Aug 2027 (originally 15 Jul 2022)
  • Buildings1 building record
  • Documents filed63 files

Current status

0%0 of 53 units booked
47.6%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OM PALACENA1111411253

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 95%.

OM PALACE: 34% average across the applicable activities

ActivityProgress
Excavation95%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor50%
Slabs of Super Structure22%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks38%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area875 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilation Authority
Permissible FSI2187.52
Proposed, not sanctioned2,188 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLOOR, HEENA SHOPPING ARCADE, SV ROAD, JOGESHWARI WEST, MUMBAI 400102
Estimated costRs 9.70 cr
Cost incurredRs 4.62 cr
Work done47.59%
BuildingWingEstimatedIncurred
OM PALACENARs 9.51 crRs 4.62 cr
-NARs 19.40 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTushar Parulekar
ArchitectGriha Rachana Architects and interior designers
EngineerNexus Consultants & Engineers
EngineerS K Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
UMIYA BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019179Jul 2022 → Aug 2027

Reason as filed by the promoterWe request you to allow us to extend the project deadline as we sincerely wish to commence the project urgently and the reasons for the delay for the project are as under; a. The then partners of Firm were facing some financial distress and hence could not proceed with the project as per schedule. b. ⁠Onset of Covid-19 also delayed the project. c. We have not commenced any further construction activity as now new partners have come into the project to take it forward. d. ⁠The existing 2 shop tenants were not cooperating to hand over rear part of their shop for carrying out construction activit

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2027

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2File: Form 2.pdf21 May 2026
Form 3File: Form 3.pdf21 May 2026
Form 1File: Form 1.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory- Om Palace.pdf21 May 2026
Withdrawal Update Form 1File: Signed Form 1.pdf20 May 2026
Withdrawal Update Form 1File: Signed Form 1.pdf20 May 2026
Withdrawal Update Form 2File: Signed Form 2.pdf20 May 2026
Withdrawal Update Form 2File: Signed Form 2.pdf20 May 2026
Withdrawal Update Form 3File: Signed Form 3.pdf20 May 2026
Withdrawal Update Form 3File: Signed Form 3.pdf20 May 2026
Form 1File: Form 1 - Om Palace as on March 2026.pdf20 Apr 2026
Form 2File: Form 2 - Om Palace as on March 2026.pdf20 Apr 2026
Form 3File: Form 3 - Om Palace as on March 2026.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory- Om Palace.pdf20 Apr 2026
Form 1File: Form 1 - Om Palace as on Dec 2025.pdf20 Jan 2026
Form 2File: Form 2 - Om Palace as on Dec 2025.pdf20 Jan 2026
Form 3File: Form 3 - Om Palace as on Dec 2025.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Om Palace as on Dec 2025.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - Om Palace as on FY 2024-25.pdf31 Dec 2025
Form 1File: Form 1 - Om Palace as on Sep 2025.pdf19 Oct 2025
Form 2File: Form 2 - Om Palace as on Sep 2025.pdf19 Oct 2025
Form 3File: Form 3 - Om Palace as on Sep 2025.pdf19 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Om Palace as on Sep 2025.pdf19 Oct 2025
Form 1File: Form 1 - Om Palace as on June 2025.pdf9 Oct 2025
Form 2File: Form 2 - Om Palace as on June 2025.pdf9 Oct 2025
Form 3File: Form 3 - Om Palace as on June 2025.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Om Palace as on June 2025.pdf9 Oct 2025
Declaration in FORM BFile: Form B_Declaration.pdf29 Feb 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf19 Feb 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf19 Feb 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf19 Feb 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf19 Feb 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf19 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1).pdf19 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Umiya.pdf19 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf19 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf19 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate on Quality Assurance (Form 2A FY 2021-22).pdf19 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf19 Feb 2024
CERSAI detailsFile: CERSAI DETAILS.pdf19 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Om Palace.pdf19 Feb 2024
Certificates of CA (Form 3)File: Form 3 - Chartered Accountant Certificate.pdf19 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf19 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Annual Audit Report of Statutory CA (Form 5) (FY 2017-18).pdf19 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf19 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Annual Audit Report of Statutory CA (Form 5) (FY 2019-20).pdf19 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf19 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf19 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf19 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration - Om Palace.pdf19 Feb 2024
Layout approvalFile: RERA Umiya Block Plan .pdf31 Jul 2017
Details of encumbrancesFile: RERA Umiya Encumbrance Ltr.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: RERA Umiya Block Plan .pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA UMIYA Arch Form 1 -ilovepdf-compressed.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Umiya Engg Form-ilovepdf-compressed.pdf31 Jul 2017
Certificates of CA (Form 3)File: Umiya RERA CA Form 3-ilovepdf-compressed.pdf30 Jul 2017
Declaration in FORM BFile: umiya RERA Form B-ilovepdf-compressed.pdf29 Jul 2017
Building plan approvalFile: IOA BHANDUP.pdf27 Jul 2017
PAN CardFile: Umiya Pan Card.pdf27 Jul 2017
Copy of the legal title reportFile: Umiya_Compressed Title_wo_SearchPan_Card.pdf27 Jul 2017
Building Plan Approval (IOD)File: IOA BHANDUP.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Umiya Full CC Bhandup.pdf27 Jul 2017
Proforma of Allotment letterFile: RERA MODEL RERA AGREEMENT.pdf27 Jul 2017

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 61 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OM PALACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmOM PALACECompleted 60Lapsed / revoked 29Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 174 registered projects within 2 km.

Builder: UMIYA BUILDERS

UMIYA BUILDERS has 1 registration on MahaRERA, including OM PALACE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if OM PALACE is delayed beyond 31 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM PALACE?

The registered promoter entity is UMIYA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM PALACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OM PALACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM PALACE?

The professionals named in the filing: Architect: Tushar Parulekar; Architect: Griha Rachana Architects and interior designers; Engineer: Nexus Consultants & Engineers; Engineer: S K Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM PALACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM PALACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM PALACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.