Registration lapsed No litigation declared Commercial project

OM MANDAR REALTORS

By OM MANDAR REALTORS

RG-MH-60762 · RERA P99000011277 · Last updated on MahaRERA portal: 5 Jul 2021

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 52 months past the filed date
  • 20 complaints at MahaRERA
  • Completion date moved by 42 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2022Possession promised52 months past this date
9 of 11Construction stages donefurthest along: Installation of Lifts, 95%
20Complaints at MahaRERAon this registration
Jump to the 22 documents Report an error

OM MANDAR REALTORS is a Commercial project by OM MANDAR REALTORS in Palghar, Maharashtra, registered with MahaRERA as P99000011277 on 31 Aug 2017. Possession was promised by 30 Jun 2022 and is now 52 months past that date. The completion date has moved by 42 months from the original filing. 20 complaints are on record with the regulator.

At a glance

Project

  • NameOM MANDAR REALTORS
  • TypeCommercial
  • Location
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000011277
  • ReraGenie IDRG-MH-60762

Builder

  • NameOM MANDAR REALTORS
  • Entity typePartnership
  • PartnersASHOK RAM PANDE, RAJU SIDHYA SULIRE

Key dates

52 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed22 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MANDAR AVENUE F 1NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

MANDAR AVENUE F 1: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 5 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,867 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5329.0
Proposed, not sanctioned5,329 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGAJANAN SMRUTI PHOOLPADA ROAD VIRAR EAST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDIVESH SHAH
EngineerANIL GATTANI
Chartered AccountantRAMAN SHAH
PartnerRole in project
OM MANDAR REALTORS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000009780Dec 2018 → Dec 2021

Reason as filed by the promoterDELAY DUE TO DISPUTE AMONG THE PARNTERS AND FINANCIAL CRISES.

Complaints filed with MahaRERA20

Case no.ComplainantRespondentFiled
CC006000000001332Nilay Pradeep ShahOm Mandar Realtors17/10/2017
CC006000000023411Milan KamdarOm Mandar Realtors19/02/2018
CC006000000023447SANJAY RAMESH LOHARRAJU SULIRE04/03/2018
CC006000000023460SUKHRAM SINGH KUSHWAHRAJU SULIRE02/03/2018
CC006000000023870SEEMA SINGHANIAOM MANDAR REALTORS01/05/2018
CC006000000044545Shilpa Aunshul VarmaRaju Sidya Sulire17/05/2018
CC006000000056372Mrs. Shilpa Aunshul VarmaM/s. Om Mandar Realtors28/09/2018
CC006000000054558NORUDDIN ABBAS MODIOM MANDAR REALTORS19/05/2018
CC006000000055194Damansingh BistOm Mandar Realtors13/07/2018
CC006000000055996Kiran ThaokarRaju S Sulire07/09/2018
CC006000000056033Mrs. Charu Ranjit Sukhija & othsOm Mandar Realtors, Mr. Raju Sulire02/09/2018
CC006000000056851MR SAMEER SAHASRABUDDHEOM MANDAR REALTORS06/11/2018
CC006000000078270RAJARAM CHANDANSHIVERAJU S SULIRE (partner)06/03/2019
CC006000000078363KAUSTUBH SUDHIR JALANAPURERAJU S SULIRE06/03/2019
CC006000000171561Dimpal Anilkumar PandyaMs Om Mandar Realtors through Partners Mr Raju Sidhya Sulire and others15/11/2019
CC006000000197749Shantidevi ThakurRaju S. Sulire06/08/2021
CC006000000199005UDAY JOSHIOm Mandar Realtores15/11/2021
CC006000000209632RAJENDRA JADHAVOM MANDAR REALTORS07/01/2022
CC006000000374858Jignesh Bhupendra RawalRaju Sidhya Sulire20/03/2023
CC12500209Noorudinn Abaasbhai ModiOM MANDAR REALTORS21/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed22

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Adobe Scan 05 Jul 2021 (5)_compressed.pdf5 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold n booked inventory-Final.pdf2 Jul 2021
Declaration about Commencement CertificateFile: Declaration about CC om mandar.pdf29 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: OM MANDAR REALTORS 17-18.pdf29 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: OM MANDAR REALTORS 18-19.pdf29 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: OM MANDAR REALTORS 19-20.pdf29 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: OM MANDAR REALTORS 20-21.pdf29 Jun 2021
Declaration in FORM BFile: Form B.pdf16 Aug 2017
Certificates of CA (Form 3)File: C A Certificate.pdf16 Aug 2017
Layout approvalFile: LAYOUT PLAN - OMR.pdf14 Aug 2017
Building plan approvalFile: BLUE PRINT OM MANDAR.pdf14 Aug 2017
PAN CardFile: Om Mandar Realtor Pan Card.pdf14 Aug 2017
PAN CardFile: PAN CARD RAJU SULIRE.pdf14 Aug 2017
PAN CardFile: PAN CARD ASHOK PANDEY.pdf14 Aug 2017
Copy of the legal title reportFile: TITLE CERTIFICATE OMR.pdf14 Aug 2017
Details of encumbrancesFile: Om Mandar Encumbrancess Letter.pdf14 Aug 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - OMR.pdf14 Aug 2017
Building Plan Approval (IOD)File: BLUE PRINT OM MANDAR.pdf14 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: C C OM MANDAR REALTORS.pdf14 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Letter.pdf14 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf14 Aug 2017
Proforma of Allotment letterFile: Sale Again Declaration Letter.pdf14 Aug 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 42 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OM MANDAR REALTORS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai-Virar City (M Corp)3,200+ in Palghar

2 kmOM MANDAR REALTORSCompleted 37Lapsed / revoked 20Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: OM MANDAR REALTORS

OM MANDAR REALTORS has 1 registration on MahaRERA, including OM MANDAR REALTORS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that OM MANDAR REALTORS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if OM MANDAR REALTORS is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM MANDAR REALTORS?

The registered promoter entity is OM MANDAR REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM MANDAR REALTORS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against OM MANDAR REALTORS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for OM MANDAR REALTORS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM MANDAR REALTORS?

The professionals named in the filing: Architect: DIVESH SHAH; Engineer: ANIL GATTANI; Chartered Accountant: RAMAN SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM MANDAR REALTORS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM MANDAR REALTORS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM MANDAR REALTORS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.