Home / Browse projects / Palghar, Maharashtra / OM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED

Registered No litigation declared Residential / Group Housing project

OM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED

By ESTQUIRE PROJECTS PRIVATE LIMITED

RG-MH-06229 · RERA P99000052842 · Last updated on MahaRERA portal: 25 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 10%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

OM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED is a Residential / Group Housing project by ESTQUIRE PROJECTS PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000052842 on 5 Oct 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameOM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED
  • TypeResidential / Group Housing
  • Location
    • LAXMI BEN CHEDDA NAGAR
    • VILLAGE SOPARA
    • NALASOPARA WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • RERA no.P99000052842
  • ReraGenie IDRG-MH-06229

Builder

  • NameESTQUIRE PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorsVIPUL VIJAY GIRDHAR, KALPESH PRAKASH BOHRA
  • Other registrations3 more →

Key dates

this monthRegisteredOct 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OM GANESH AND ASHOPALAV CO-OPERATIVE HOUSING SOCIETY LIMITEDNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 10%.

OM GANESH AND ASHOPALAV CO-OPERATIVE HOUSING SOCIETY LIMITED: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed250

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots250
Closed/Covered45
Open Space205

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,318 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
ASHOPALAV CO-OPERATIVE HOUSING SOCIETY LIMTEDVasai-Virar City (M Corp)Palghar
OM GANESH CO-OPERATIVE SOCIETY LIMITEDVasai-Virar City (M Corp)Palghar

Approvals and building plan

Permissible FSI5436.33
Proposed, not sanctioned5,436 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSri Ram-Sankul, Achole Marg, Nallasopara - East, Thane - 401209

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
ESTQUIRE PROJECTS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Om Ganesh as on Dec 2024.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Om Ganesh as on March 2025.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Om Ganesh as on Dec 2024.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Om Ganesh as on March 2025.pdf25 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - FY 2023-24_11zon.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2024.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Om Ganesh as on Sep 2024.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Sept 2024_11zon.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2024.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: Circular 29 (3) - Sept 2024.pdf28 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: CA Certificate - Sept 2024_11zon.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Om Ganesh FY2023-24.pdf28 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 2023-24.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 2024.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 2024_11zon.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 2024.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Om Ganesh and Asho Palav as on June 2024.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Om Ganesh 30-06-2024.pdf30 Jul 2024
Layout approvalFile: 1_compressed.pdf10 Jun 2024
Copy of Layout Approval (in case of layout)File: 1_compressed.pdf10 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - Om Ganesh.pdf10 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Om Ganesh Asho.pdf31 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Om Ganesh and Asho Palav as on March 2024.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Om Ganesh and Asho Palav as on March 2024.pdf18 Apr 2024
Building plan approvalFile: Page 3_organized_11zon.pdf11 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Page 3_organized_11zon.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Mar 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf9 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf8 Mar 2024
Building plan approvalFile: Drawing - Page 1.pdf2 Mar 2024
Building plan approvalFile: Drawing - Page 2.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing - Page 1.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing - Page 2.pdf2 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC_11zon.pdf2 Mar 2024
Declaration about Commencement CertificateFile: Format - D.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - OM Ganesh and Asho Palav CHSL as on Dec 2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Om Ganesh and Asho Palav as on 31-12-2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Om Ganesh and Asho Palav CHS_Dec 23.pdf20 Jan 2024
Other - TechnicalFile: vvcmc mail reply.pdf27 Sep 2023
Copy of the legal title reportFile: search report new merged.pdf1 Sep 2023
Copy of the legal title reportFile: LEGAL SEARCH BOTH MERGED NEW (1).pdf10 Aug 2023
Declaration about Commencement CertificateFile: Estquire.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT MERGED new.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_merged_organized.pdf29 Jul 2023
Details of encumbrances concerned to FinanceFile: ENCRUMBANCE TO FINANCE.pdf19 Jul 2023
Details of encumbrances concerned to LegalFile: ENCRUMBANCE TO FINANCE.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_REVISED_merged_organized.pdf19 Jul 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER_merged.pdf19 Jul 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT ALLOTMENT.pdf19 Jul 2023
CERSAI detailsFile: CERSAI_Search_Report_200273930619_For_Asset_Based_Search_11_07_2023_11_14_04_340.pdf18 Jul 2023
Declaration in FORM BFile: estquire directors FORM B.pdf4 Jul 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT FOR ALLOTMENT LETTER.pdf4 Jul 2023
Layout approvalFile: 4.pdf29 Jun 2023
Building plan approvalFile: 3.pdf29 Jun 2023
PAN CardFile: Estquire projects pan card.pdf29 Jun 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE TO FINANCE.pdf29 Jun 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE TO LEGAL.pdf29 Jun 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE TO FINANCE.pdf29 Jun 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE TO LEGAL.pdf29 Jun 2023
Copy of Layout Approval (in case of layout)File: 4.pdf29 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf29 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Scan Copy.pdf29 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT MERGED_organized.pdf29 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report_200272936493_For_Asset_Based_Search_29_06_2023_16_28_30_169.pdf29 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SCAN.pdf29 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST-VIPUL GIRDHAR.pdf29 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST-KALPESH BOHRA.pdf29 Jun 2023
Proforma of Agreement for saleFile: agreement merged.pdf29 Jun 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf29 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT -A.pdf29 Jun 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT.pdf29 Jun 2023

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OM GANESH COOP HOUSING SOCIETY LTD AND ASHO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLAGE SOPARA, NALASOPARA WEST3,200+ in Palghar

Builder: ESTQUIRE PROJECTS PRIVATE LIMITED

ESTQUIRE PROJECTS PRIVATE LIMITED has 4 registrations on MahaRERA, including OM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED and Estquire Harmony. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if OM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED?

The registered promoter entity is ESTQUIRE PROJECTS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in OM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM GANESH COOP HOUSING SOCIETY LTD AND ASHO PALAV CO OP HOUSING SOCIETY LIMITED. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM GANESH COOP HOUSING SOCIETY LTD AND ASHO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.