Home / Browse projects / Pune, Maharashtra / OHANA COUNTY

Completed No litigation declared Plotted project

OHANA COUNTY

By NORTHSTAR REALTY

RG-MH-34237 · RERA P52100047063 · Last updated on MahaRERA portal: 5 Jul 2025

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
20 of 111Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

OHANA COUNTY is a Plotted project by NORTHSTAR REALTY in Pune, Maharashtra, registered with MahaRERA as P52100047063 on 29 Sep 2022. The registration is recorded completed; possession was promised by 31 Dec 2024. 91 of the 111 units on this registration are recorded sold or booked. 4 complaints are on record with the regulator.

At a glance

Project

  • NameOHANA COUNTY
  • TypePlotted
  • Location
    • -
    • Bhegadewadi
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • RERA no.P52100047063
  • ReraGenie IDRG-MH-34237

Builder

  • NameNORTHSTAR REALTY
  • Entity typePartnership
  • PartnersNARENDRA SOHANRAJ RATHOD, TEJAS VINOD DOSHI, VIJAY PARASMAL JAIN, DEEPESH JAYPRAKASH BHURAT, KAMLESH BABULAL PARMAR

Key dates

this monthRegisteredSep 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Sep 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed59 files

Current status

82%91 of 111 units booked

Figures as on 5 Jul 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 5 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area19,055 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
NARENDRA SOHANRAJ RATHODPune (CB)Pune
KAMLESH BABULAL PARMARPune (CB)Pune
NARENDRA PARASMAL JAINPune (M Corp.)Pune
VIJAY PARASMAL JAINPune (M Corp.)Pune
DEEPESH JAYPRAKASH BHURATLonavala (M Cl)Pune
TEJAS VINOD DOSHIPune (M Corp.)Pune

Approvals and building plan

Permissible FSI28424.48
Proposed, not sanctioned28,424 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE DECCAN GYMKHANA BRANCH

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLandmark Planners
EngineerDinesh Bhandari
Chartered AccountantHRJ & Company
PartnerRole in project
NORTHSTAR REALTY-

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC12602209Sachin KumarNORTHSTAR REALTY15/04/2026
CC12601985Ajinkya Prakash NerkarNORTHSTAR REALTY03/04/2026
CC12602960Prashant prabhakar PithoreNORTHSTAR REALTY19/05/2026
CC12603295Yogesh Ramnath UdawantNORTHSTAR REALTY01/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 May 2025

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY -31-12-22_compressed.pdf5 Jul 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY-31-03-23_compressed.pdf5 Jul 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY 30-06-23_compressed.pdf5 Jul 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY -30-09-23_compressed.pdf5 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-12-2022 uploaded.pdf4 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-03-2023 uploaded .pdf4 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-06-2023 uploadee .pdf4 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-09-2023 uploaded .pdf4 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-12-2023uploaded .pdf4 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-03-2024uploaded .pdf4 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-06-2024 uploaded .pdf4 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30-09-2024 uploaded .pdf4 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-12-2024uploaded .pdf4 Jul 2025
Disclosure of sold/ booked inventoryFile: NSR Booking Inventory as on 31-03-2025 uplioded .pdf4 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 30-06-23 uploaded .pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 30-09-23 uploaded .pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 31-12-23 uploaded .pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 31-03-24 uploaded .pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 31-06-24 uploaded .pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 31-09-24 uploaded .pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 31-12-24 uploaded.pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 31-12-22 uploaded .pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 31-03-23.pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form30-12-2024 uploaded .pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 30-09-2024uploaded.pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 30-06-2024 uploaded.pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2, 31-03-2024 uploaded .pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2, 31-12-2023uploaded .pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2, 30-09-2023 uploaded .pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2, 30-06-2023 uploaded .pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 , 31-03-2023 uploaded .pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 , 31-12-2022 uploaded .pdf1 Jul 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Ohana COunty - Completion Certificate.pdf3 May 2025
Declaration in FORM BFile: form B ohana county.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: NSR Booking Inventory 2022-24-2 3 24_compressed.pdf4 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: NSR Declaration for Form No 2A.pdf7 Aug 2023
Disclosure of sold/ booked inventoryFile: NSR Booking Inventory 2022-23 Comp.pdf7 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report-For Agreement_compressed.pdf5 Sep 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf3 Sep 2022
CERSAI detailsFile: CERSAI Search Report.pdf3 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances on the Bank Account or no escrow o3 Sep 2022
Copy of the legal title reportFile: Search in RERA format.pdf29 Aug 2022
Copy of the legal title reportFile: Search Report.pdf27 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_compressed.pdf27 Aug 2022
Proforma of Allotment letterFile: AFS Signed.pdf27 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf25 Aug 2022
Proforma of Allotment letterFile: Signed Allotment Letter_compressed.pdf25 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation report.pdf25 Aug 2022
Layout approvalFile: Layout.pdf23 Aug 2022
Building plan approval or NA orderFile: Floor Plan.pdf23 Aug 2022
PAN CardFile: NORTHSTAR REALTY PAN CARD.pdf23 Aug 2022
Details of encumbrances concerned to LegalFile: Legal Emcumbrance Certificate.pdf23 Aug 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf23 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf23 Aug 2022
Declaration about Commencement CertificateFile: Declaration About Commecmnt Certificate.pdf23 Aug 2022
Declaration in FORM BFile: AFFEDAVIT.pdf23 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Architect Certificate.pdf23 Aug 2022

How this compares with Pune

82%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OHANA COUNTY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

Builder: NORTHSTAR REALTY

NORTHSTAR REALTY has 1 registration on MahaRERA, including OHANA COUNTY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if OHANA COUNTY is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OHANA COUNTY?

The registered promoter entity is NORTHSTAR REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OHANA COUNTY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against OHANA COUNTY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for OHANA COUNTY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OHANA COUNTY?

The professionals named in the filing: Architect: Landmark Planners; Engineer: Dinesh Bhandari; Chartered Accountant: HRJ & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OHANA COUNTY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OHANA COUNTY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OHANA COUNTY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.