ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Ocean Homes - The Pearl

Registered No litigation declared Others project

Ocean Homes - The Pearl

By Aditya Creations And Developers LLP

RG-MH-29773 · RERA P99000029054 · Last updated on MahaRERA portal: 23 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 36 months from the original
28 of 198Construction stages doneacross 18 buildings; furthest along: Staircases, 90%
31 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

Ocean Homes - The Pearl is a Others project by Aditya Creations And Developers LLP in Palghar, Maharashtra, registered with MahaRERA as P99000029054 on 23 Apr 2021. Possession is promised by 30 Jun 2028. The completion date has moved by 36 months from the original filing. 5 of the 36 units on this registration are recorded sold or booked, and 28 of 198 construction stages are filed complete.

At a glance

Project

  • NameOcean Homes - The Pearl
  • TypeOthers
  • Location
    • Survey No -70
    • Palghar
    • Walve
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000029054
  • ReraGenie IDRG-MH-29773

Builder

  • NameAditya Creations And Developers LLP
  • Entity typePartnership
  • PartnersSandip Hanmant Mane, Mahesh Haridas Jadhav, AFAQUE AHMED KHAN

Key dates

this monthRegisteredApr 2021First promiseJun 2025Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2021
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Jun 2025)
  • Buildings18 building records
  • Documents filed83 files

Current status

14%5 of 36 units booked
17.0%Work done, per cost certificate

Figures as on 23 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bungalow -R1 and R2NA33202
Bungalow -R3 and R4NA33202
Bungalow R5 and R6NA33202
Bungalow R7 and R8NA44202
Bungalow R9 and R10NA33202
Bungalow R11 and R12NA44202
Bungalow R13 and R14NA44202
Bungalow R15 and R16NA33202
Bungalow R17 and R18NA44202
Bungalow R19 and R20NA33202
Bungalow R21 and R22NA44202
Bungalow R23 and R24NA40202
Bungalow R25 and R26NA44202
Bungalow R27 and R28NA44202
Bungalow R29 and R30NA44202
Bungalow R31 and R32NA44202
Bungalow R33 and R34NA33202
Bungalow R35 and R36NA33202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building18

As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 198 construction stages are filed complete across 18 buildings. The stage furthest along is Staircases, at 90%.

Bungalow -R1 and R214%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow -R3 and R427%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure34%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R5 and R623%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R7 and R859%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R9 and R1023%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R11 and R1240%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure67%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R13 and R1444%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R15 and R1628%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure34%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R17 and R1823%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R19 and R2023%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R21 and R220%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R23 and R2418%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R25 and R2623%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R27 and R280%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R29 and R3023%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R31 and R320%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R33 and R340%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow R35 and R360%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36
BuildingClosed/CoveredTotal
Bungalow -R1 and R222
Bungalow -R3 and R422
Bungalow R5 and R622
Bungalow R7 and R822
Bungalow R9 and R1022
Bungalow R11 and R1222
Bungalow R13 and R1422
Bungalow R15 and R1622
Bungalow R17 and R1822
Bungalow R19 and R2022
Bungalow R21 and R2222
Bungalow R23 and R2422
Bungalow R25 and R2622
Bungalow R27 and R2822
Bungalow R29 and R3022
Bungalow R31 and R3222
Bungalow R33 and R3422
Bungalow R35 and R3622

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,410 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Dec 2025
LandownerVillageDistrict
Aksharam Developers & Agro LLPPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPalghar Municipal Council
Permissible FSI5000.0
Proposed, not sanctioned4,052 sq m
Buildings approved18
Buildings sanctioned18

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No -38 and 39 Patel Heritage Plot No -15 and 17, Sector -7 Kharghar Navi Mumbai -410210
Estimated costRs 15.70 cr
Cost incurredRs 2.67 cr
Work done16.99%
BuildingWingEstimatedIncurred
Bungalow -R1 and R2NARs 1.00 cr-
Bungalow -R3 and R4NARs 1.00 crRs 25.11 lakh
Bungalow R13 and R14NARs 1.00 crRs 55.25 lakh
Bungalow R15 and R16NARs 1.00 crRs 25.11 lakh
Bungalow R17 and R18NARs 1.00 crRs 15.07 lakh
Bungalow R19 and R20NARs 1.00 crRs 15.07 lakh
Bungalow R27 and R28NARs 1.00 cr-
Bungalow R29 and R30NARs 1.00 crRs 15.07 lakh
Bungalow R33 and R34NARs 1.00 cr-
Bungalow R5 and R6NARs 73.50 lakhRs 11.03 lakh
Bungalow R7 and R8NARs 73.50 lakhRs 58.80 lakh
Bungalow R9 and R10NARs 73.50 lakhRs 11.03 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDisha Architect
EngineerRAJ ASSOCIATES
EngineerIMPACT DESIGNERR
Chartered AccountantManish K Ramawati & Company
PartnerRole in project
Aditya Creations And Developers LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA10072502041Jun 2025 → Jun 2028

Reason as filed by the promoterThe project encountered substantial delays primarily due to unforeseen financial constraints that necessitated a temporary suspension of construction activities. A key factor contributing to these constraints was the lower-than-anticipated sales performance of residential units, which significantly restricted the cash flow required to sustain development momentum. This shortfall in revenue made it increasingly difficult to meet critical funding obligations and maintain progress as originally scheduled. Compounding these financial challenges was the unprecedented impact of the COVID-19 pandemic

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Ocean Homes - Q4 - Form 1_compressed.pdf23 Jul 2026
Withdrawal Update Form 2File: Ocean Homes - Q4 - Form 2_compressed.pdf23 Jul 2026
Withdrawal Update Form 3File: Ocean Homes - Q4 - Form 3.pdf23 Jul 2026
Withdrawal Update Form 1File: OCEAN HOME - Q3 - FORM 1_compressed.pdf3 Jul 2026
Withdrawal Update Form 2File: OCEAN HOME - Q3 - FORM 2.pdf3 Jul 2026
Withdrawal Update Form 3File: OCEAN HOMES - Q3 - FORM 3 (1).pdf3 Jul 2026
Withdrawal Update Form 1File: signed copy form 1 ACD LLP_compressed.pdf2 Dec 2025
Withdrawal Update Form 2File: Form No 2 OCEAN HOMES 30-09-2025.pdf2 Dec 2025
Withdrawal Update Form 3File: Form 3 ocean homes sept25.pdf2 Dec 2025
Withdrawal Update Form 1File: fORM 1 FINAL_11zon.pdf27 Nov 2025
Withdrawal Update Form 1File: fORM 1 FINAL_11zon.pdf27 Nov 2025
Withdrawal Update Form 2File: Form 2 Compressed.pdf27 Nov 2025
Withdrawal Update Form 2File: Form 2 Compressed.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf27 Nov 2025
Form 1File: Form 1 OCEAN HOMES_11zon.pdf21 Nov 2025
Form 2File: FORM 2.pdf21 Nov 2025
Form 3File: Form 3 Ocean Home.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf21 Nov 2025
Withdrawal Update Form 1File: RERA-Form-1 bunglows 10-18 -merged 2.pdf16 Sep 2025
Withdrawal Update Form 2File: Ocean Homes Form 2- June 2022.pdf16 Sep 2025
Withdrawal Update Form 3File: Form 3 OCEAN HOMES_Signed.pdf16 Sep 2025
Form 1File: Form 1 OCEAN HOMES_11zon.pdf13 Sep 2025
Form 2File: Form -2 OCEAN HOMES_11zon.pdf13 Sep 2025
Form 3File: form 3.pdf13 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold OCEAN HOMES.pdf13 Sep 2025
Form 1File: form 1 june 24.pdf13 Sep 2025
Form 2File: Form 2 - july 2024_compressed.pdf13 Sep 2025
Form 3File: form 3.pdf13 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf13 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ocean Homes (31-12-2024).pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 OCEAN HOMES_11zon.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 OCEAN HOMES_11zon.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1 Sep 2024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 2024 Final.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep 24_removed.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Disclosure - Sep 24.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DATA-SIGN.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1 -BUNGLOW 1-merged.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1 bunglows 10-18 -merged 2.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1 -BUNGLOW 1-merged.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1 bunglows 10-18 -merged 2.pdf3 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Supervisor Certificate 1.pdf3 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Supervisor Certificate For Banglow 2.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Discloser Of Sold, Booked Inventory Of Ocean Homes -The Pearl.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q4_22-23.pdf24 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q3_22-23.pdf14 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q2_FY22-23_C.pdf19 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Ocen Homes_The Pearl FY 2021-22-.pdf30 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ocean Homes Form 2- June 2022.pdf26 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2022.pdf26 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ocean Homes-The Pearl - 31st March 2022_compressed.pdf25 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Ocean Homes_ The Pearl - 31st March 2022.pdf25 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Ocean Homes_ The Pearl - 31st March 2022.pdf25 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ocean Homes-The Pearl_compressed.pdf26 Apr 2022
CERSAI detailsFile: Ocean Homes- The Pearl.pdf26 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31st Dec 2021.pdf26 Apr 2022
Proforma of Allotment letterFile: New RERA Agreement For Sale Aditya Creations Ocean Homes CM.pdf2 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ocean Homes .pdf25 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A Ocean Homes .pdf25 Jan 2022
Declaration about Commencement CertificateFile: The Ocean Homes 32.pdf17 Jan 2022
Disclosure of sold/ booked inventoryFile: The Ocean Homes 29.pdf17 Jan 2022
Building plan approvalFile: Ocean homes new TP plan 1_rotated (1) (3).pdf19 Nov 2021
Building plan approvalFile: Ocean homes TP plan 2_rotated_compressed.pdf19 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Ocean homes new TP plan 1_rotated (1) (3).pdf19 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Ocean homes TP plan 2_rotated_compressed.pdf19 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Ocean Homes New CC_rotated.pdf19 Nov 2021
Declaration about Commencement CertificateFile: Ocean Homes 32.pdf1 Sep 2021
Disclosure of sold/ booked inventoryFile: Ocen Home 29.pdf1 Sep 2021
Copy of the legal title reportFile: Scan16042021161356_compressed.pdf16 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Ocean Homes - The Pearl.pdf16 Apr 2021
Proforma of Allotment letterFile: Agreement for Sale_Aditya Creations LLP_The Ocean Homes.pdf16 Apr 2021
Proforma of Allotment letterFile: Allotment Letter_Aditya Creations LLP_The Ocean Homes.pdf16 Apr 2021
Layout approvalFile: plan 1.pdf15 Apr 2021
Building plan approvalFile: plan 2.pdf15 Apr 2021
Building plan approvalFile: plan 4.pdf15 Apr 2021
PAN CardFile: IMG-20210414-WA0024.pdf15 Apr 2021
Details of encumbrancesFile: ENCUMBRANCE ADITYA .pdf15 Apr 2021
Copy of Layout Approval (in case of layout)File: plan 1.pdf15 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: plan 2.pdf15 Apr 2021

How this compares with Palghar

14%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 36 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ocean Homes - The Pearl on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Palghar3,200+ in Palghar

2 kmOcean Homes - The PearlCompleted 19Lapsed / revoked 8Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 42 registered projects within 2 km.

Builder: Aditya Creations And Developers LLP

Aditya Creations And Developers LLP has 1 registration on MahaRERA, including Ocean Homes - The Pearl. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Ocean Homes - The Pearl is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ocean Homes - The Pearl?

The registered promoter entity is Aditya Creations And Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ocean Homes - The Pearl?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ocean Homes - The Pearl?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ocean Homes - The Pearl?

The professionals named in the filing: Architect: Disha Architect; Engineer: RAJ ASSOCIATES; Engineer: IMPACT DESIGNERR; Chartered Accountant: Manish K Ramawati & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ocean Homes - The Pearl?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ocean Homes - The Pearl. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ocean Homes - The Pearl to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.