ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / OCEAN BREEZE

Registered No litigation declared Residential / Group Housing project

OCEAN BREEZE

By BHAIRAV SMILE INFRAPROJECTS

RG-MH-06680 · RERA P51800053078 · Last updated on MahaRERA portal: 5 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 65%
88 of 155Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

OCEAN BREEZE is a Residential / Group Housing project by BHAIRAV SMILE INFRAPROJECTS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053078 on 12 Oct 2023. Possession is promised by 30 Sep 2028. 67 of the 155 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NameOCEAN BREEZE
  • TypeResidential / Group Housing
  • Location
    • MHADA LAYOUT
    • AT CHARKOP
    • KANDIVALI (WEST)
    • Charkop
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • RERA no.P51800053078
  • ReraGenie IDRG-MH-06680

Builder

  • NameBHAIRAV SMILE INFRAPROJECTS
  • Entity typePartnership
  • PartnersNIKHIL PRAKASH SURVE, SAMIR PRAVIN SANGHAVI, PRAKASH HANUMANTRAO SURVE, SHIVAM KAPIL SANGHAVI, TEJAS PRAKASH SURVE

Key dates

this monthRegisteredOct 2023PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Oct 2023
  • Promised completion30 Sep 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed67 files

Current status

43%67 of 155 units booked
44.1%Work done, per cost certificate

Figures as on 5 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OCEAN BREEZE - A WINGNA87808
OCEAN BREEZE - B WINGNA80808
OCEAN BREEZE - C WINGNA771390139

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 65%.

OCEAN BREEZE - A WING58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
OCEAN BREEZE - B WING58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
OCEAN BREEZE - C WING58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes40%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered42
BuildingClosed/CoveredTotal
OCEAN BREEZE - A WING1414
OCEAN BREEZE - B WING1414
OCEAN BREEZE - C WING1414

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,174 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Aug 2025
LandownerVillageDistrict
CHARKOP BHAIRAV C.H.S.LKandivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai / MHADA
Permissible FSI13425.0
Proposed, not sanctioned6,306 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCTS NO 637 A, SHIVALAYA CHANDAVARKAR ROAD, BORIVALI
Estimated costRs 67.62 cr
Cost incurredRs 29.83 cr
Work done44.11%
BuildingWingEstimatedIncurred
OCEAN BREEZE - A WINGNARs 22.54 crRs 9.94 cr
OCEAN BREEZE - B WINGNARs 22.54 crRs 9.94 cr
OCEAN BREEZE - C WINGNARs 22.54 crRs 9.94 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMehul J. Kanakia
EngineerUnisteps Consulting Pvt Ltd
Chartered AccountantNEHALI AND CO
PartnerRole in project
BHAIRAV SMILE INFRAPROJECTS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2028

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: January Quater form 1 (architect certificate) (1).pdf5 Jun 2026
Withdrawal Update Form 2File: P528 Form 2 MahaRERA March2026 R0.pdf5 Jun 2026
Withdrawal Update Form 3File: Signed CA Certificate 1 -Bhairav Smile _Mar 26.pdf5 Jun 2026
Withdrawal Update Form 1File: December Quater form 1 (architect certificate).pdf5 Feb 2026
Withdrawal Update Form 2File: Form 2 DEC 2025.pdf5 Feb 2026
Withdrawal Update Form 3File: Signed CA Certificate 1 -Bhairav Smile _dec 25.pdf5 Feb 2026
Withdrawal Update Form 1File: June Quater form 1 (architect certificate) (1).pdf24 Jan 2026
Withdrawal Update Form 1File: September Quater form 1 (architect certificate) (1).pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 June2025.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 SEPT2025.pdf24 Jan 2026
Withdrawal Update Form 3File: Signedn20-01-2026 CA Certificate -Bhairav Smile june 25.pdf24 Jan 2026
Withdrawal Update Form 3File: Signed CA Certificate -Bhairav Smile _sept25.pdf24 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 revised.pdf15 Mar 2025
Layout approvalFile: Amended IOA Approved Drawing_1-2.pdf26 Feb 2025
Layout approvalFile: Amended IOA Approved Drawing_3-4.pdf26 Feb 2025
Layout approvalFile: Amended IOA Approved Drawing_5-6.pdf26 Feb 2025
Layout approvalFile: Amended IOA Approved Drawing_7-8.pdf26 Feb 2025
Layout approvalFile: Amended IOA Approved Drawing_9-end.pdf26 Feb 2025
Building plan approvalFile: Amended IOA Approved Letter.pdf26 Feb 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Approved Drawing_1-2.pdf26 Feb 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Approved Drawing_3-4.pdf26 Feb 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Approved Drawing_5-6.pdf26 Feb 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Approved Drawing_7-8.pdf26 Feb 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Approved Drawing_9-end.pdf26 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA Approved Letter.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 revised.pdf2 Jan 2025
Proforma of Agreement for saleFile: RERA-AGREEMENT FOR SALE-810-CHARKOP.pdf2 Jul 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT-AGREEMENT FOR SALE-02 07 2024_compressed (1)_compressed (1).pdf2 Jul 2024
Details of encumbrances concerned to FinanceFile: Non Emcumbrance.pdf28 Jun 2024
Details of encumbrances concerned to LegalFile: Non Emcumbrance.pdf28 Jun 2024
Proforma of Agreement for saleFile: RERA-AGREEMENT FOR SALE-810-CHARKOP.pdf18 Jun 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT-AGREEMENT FOR SALE (1).pdf18 Jun 2024
Proforma of Agreement for saleFile: RERA-AGREEMENT FOR SALE-810-CHARKOP.pdf20 May 2024
Proforma of Allotment letterFile: Charkop-810-Allotment letter.pdf20 May 2024
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT-ALLOTMENT LETTER.pdf20 May 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT-AGREEMENT FOR SALE.pdf20 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Signed Certificate Charkop Bhairav.pdf22 Sep 2023
Layout approvalFile: PLANS_1-1.pdf14 Sep 2023
Layout approvalFile: PLANS_2-2.pdf14 Sep 2023
Layout approvalFile: PLANS_3-3.pdf14 Sep 2023
Layout approvalFile: PLANS_4-4.pdf14 Sep 2023
Layout approvalFile: PLANS_5-5.pdf14 Sep 2023
Layout approvalFile: PLANS_6-6.pdf14 Sep 2023
Layout approvalFile: PLANS_7-end.pdf14 Sep 2023
Building plan approvalFile: IOD.pdf14 Sep 2023
PAN CardFile: Bhairav Smile Pan Card.pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: PLANS_1-1.pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: PLANS_2-2.pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: PLANS_3-3.pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: PLANS_4-4.pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: PLANS_5-5.pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: PLANS_6-6.pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: PLANS_7-end.pdf14 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf14 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC approved 17 07 2023.pdf14 Sep 2023
Declaration about Commencement CertificateFile: 07 CC DECLARATION 01.pdf14 Sep 2023
Declaration in FORM BFile: 09 FORM B DEVELOPER 01.pdf14 Sep 2023
CERSAI detailsFile: 11 CERSAI DECLARATION.pdf14 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 01 ANNEXURE A DISCLOSURE OF INTEREST.pdf14 Sep 2023
Proforma of Agreement for saleFile: 14 DRAFT SALE AGREEMENT.pdf14 Sep 2023
Proforma of Allotment letterFile: 16 Allotment Letter.pdf14 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 04 PROJECT BANK DETAILS.pdf14 Sep 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION (1).pdf14 Sep 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT (5).pdf14 Sep 2023
Copy of the legal title reportFile: 08 Legal Title Report.pdf8 Sep 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE.pdf8 Sep 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE.pdf8 Sep 2023

How this compares with Mumbai Suburban

43%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OCEAN BREEZE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDIVALI (WEST)6,700+ in Mumbai Suburban

Builder: BHAIRAV SMILE INFRAPROJECTS

BHAIRAV SMILE INFRAPROJECTS has 1 registration on MahaRERA, including OCEAN BREEZE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if OCEAN BREEZE is delayed beyond 30 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OCEAN BREEZE?

The registered promoter entity is BHAIRAV SMILE INFRAPROJECTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OCEAN BREEZE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OCEAN BREEZE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OCEAN BREEZE?

The professionals named in the filing: Architect: Mehul J. Kanakia; Engineer: Unisteps Consulting Pvt Ltd; Chartered Accountant: NEHALI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OCEAN BREEZE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OCEAN BREEZE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OCEAN BREEZE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.