Registered No litigation declared Others project

O AND S ROYALE

By SUCHITA ORANGE PROJECT ROYALE

RG-MH-28915 · RERA P51800027371 · Last updated on MahaRERA portal: 21 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Installation of Lifts, 92%
88 of 135Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

O AND S ROYALE is a Others project by SUCHITA ORANGE PROJECT ROYALE in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800027371 on 6 Dec 2020. Possession is promised by 30 Dec 2026. 47 of the 135 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameO AND S ROYALE
  • TypeOthers
  • Location
    • ASALPHA
    • GHATKOPAR WEST
    • Ghatkopar
    • Kurla
    • Mumbai Suburban
    • 400086
  • Pincode400086
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800027371
  • ReraGenie IDRG-MH-28915

Builder

  • NameSUCHITA ORANGE PROJECT ROYALE
  • Entity typeOthers
  • JOINT DEVELOPER and PROMOTERsSUCHITA CONSTRUCTION COMPANY COMPANY, ORANGE HOMELAND PVT. LTD. ., RAJESH GUPTA .
  • PromoterMOHAMED RAFIQUE SHAIKH .

Key dates

this monthRegisteredDec 2020PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Dec 2020
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Current status

35%47 of 135 units booked
84.7%Work done, per cost certificate

Figures as on 21 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
O AND S ROYALENA111012015135

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 92%.

O AND S ROYALE: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%

Progress on shared amenities15

As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered33
Open Space2

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,273 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Sep 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI4623.49
Proposed, not sanctioned4,623 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 AND 2, GROUND FLOOR, BHAVESHWAR BUILDING NO 3, BHAVESHWAR LANE, MUMBAI 400077
Estimated costRs 18.00 cr
Cost incurredRs 15.24 cr
Work done84.69%
BuildingWingEstimatedIncurred
O AND S ROYALENARs 18.00 crRs 15.24 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUSHMA DEODHAR
ArchitectSaloni Arun Deodhar
EngineerPIYUSH KUMAR SURA
EngineerHANWARE CONSULTANTS
Chartered AccountantKETAN LATHIA
Chartered AccountantBANWAT & CO
PartnerRole in project
SUCHITA ORANGE PROJECT ROYALE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: SOPRFORM1QTR12026.pdf21 Aug 2026
Withdrawal Update Form 2File: SOPRQTR1FORM22026.pdf21 Aug 2026
Withdrawal Update Form 3File: SOPRQTR12026FORM3.pdf21 Aug 2026
Withdrawal Update Form 1File: ROYALEARCHCERTDRAFT 06 04 2026 (1).pdf28 May 2026
Withdrawal Update Form 2File: Form 2.pdf28 May 2026
Withdrawal Update Form 3File: Form 3 Upload.pdf28 May 2026
Form 1File: ROYALEARCHCERTDRAFT 12 01 2026.pdf18 Mar 2026
Form 2File: Form 2 311225.pdf18 Mar 2026
Form 3File: Form 3 CA Certificate_compressed.pdf18 Mar 2026
Disclosure of Sold and Booked InventoryFile: DOI 31-12-2025.pdf18 Mar 2026
Form 1File: Form 1.pdf18 Mar 2026
Form 2File: Form 2.pdf18 Mar 2026
Form 3File: Form 3_compressed.pdf18 Mar 2026
Disclosure of Sold and Booked InventoryFile: DOI 31-9-2025.pdf18 Mar 2026
Form 1File: Form 1.pdf18 Mar 2026
Form 2File: Form 2.pdf18 Mar 2026
Form 3File: Form 3_compressed.pdf18 Mar 2026
Disclosure of Sold and Booked InventoryFile: DOI 31-6-2025.pdf18 Mar 2026
Form 1File: Form 1.pdf18 Mar 2026
Form 2File: Form 2.pdf18 Mar 2026
Form 3File: Form 3_compressed.pdf18 Mar 2026
Disclosure of Sold and Booked InventoryFile: DOI 31-6-2025.pdf18 Mar 2026
Form 1File: Form 1.pdf18 Mar 2026
Form 2File: Form 2.pdf18 Mar 2026
Form 3File: Form 3.pdf18 Mar 2026
Disclosure of Sold and Booked InventoryFile: DOI 31-3-2024.pdf18 Mar 2026
Form 1File: 300924_SUOR_Royale_Form1.pdf18 Mar 2026
Form 2File: Form 2 SOHP30THSEPT2024HDM.pdf18 Mar 2026
Form 3File: RoyaleForm 3 CA Certificate 30-09-2024 New_compressed.pdf18 Mar 2026
Disclosure of Sold and Booked InventoryFile: DOI 31-3-2024.pdf18 Mar 2026
Form 1File: 300924_SUOR_Royale_Form1.pdf18 Mar 2026
Form 2File: Form 2 SOHP30THSEPT2024HDM.pdf18 Mar 2026
Form 3File: RoyaleForm 3 CA Certificate 30-09-2024 New_compressed.pdf18 Mar 2026
Disclosure of Sold and Booked InventoryFile: DOI 31-3-2024.pdf18 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A Royale 31-3 24.pdf18 Mar 2026
Form 2A (FY 2023-2024)File: FORM-2A 2025.pdf18 Mar 2026
Form 2A (FY 2022-2023)File: 31032023 FORM 2 A.pdf18 Mar 2026
Form 5 (FY 2024-2025)File: 2025 FORM 5.pdf18 Mar 2026
Form 5 (FY 2023-2024)File: 2023-24SUOR ROYALE FORM 5_compressed.pdf18 Mar 2026
Form 5 (FY 2022-2023)File: SOPR_Form5_31032023.pdf18 Mar 2026
Layout approvalFile: Revised approved plan OSROYALE 123.pdf1 Apr 2025
Layout approvalFile: Revised approved plan OSROYALE 4567.pdf1 Apr 2025
Copy of Layout Approval (in case of layout)File: Revised approved plan OSROYALE 123.pdf1 Apr 2025
Copy of Layout Approval (in case of layout)File: Revised approved plan OSROYALE 4567.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SUORPR Dec24_compressed.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SUORPR Dec 24.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SUOR ROYALE FORM 5_compressed.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RoyaleForm 3 CA Certificate 30-09-2024 New_compressed.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SOHP30THSEPT2024HDM.pdf4 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 300910_SUOR_HDM_FORM1.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Royale 31-3 24.pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SOPR FORM 1 JULY 2024.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SOPR FORM 2 JULY 2024.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SOPR FORM 3 JULY 2024_compressed.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SUOR ROYALE FORM 1.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SUOR ROYALE ENGINEER FORM 2.pdf12 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM - 2A (SUCHITA ORANGE PROJECT ROYALE).pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SUOR ROYALE FORM 3_compressed.pdf12 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SOPR_Form5_31032023.pdf25 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 310823OSROYALE Form 2.pdf6 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 310823 OS Royale FOrm 3.pdf6 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ROYALE ARCHITECT CERTFICATE May 2023.pdf6 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 31072022compressed.pdf8 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122022 Signed Copycompressed.pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: SOPR FORM 5 18-19.pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5 FY 21-22 Royale_compressed.pdf8 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 020223_SUOR_Form2.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE -SUCHITA 13 01 2023_compressed.pdf1 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2021 Form 2A.pdf1 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021 Form 2A.pdf1 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Suchita Orange Project Royale - 27012023_compressed.pdf1 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OS Royale ARchitect Certificate August 2022.pdf7 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: OS Royale August 2022 Engineer Certificate.pdf7 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: OS ROYALE AUGUST 22 FORM 3_compressed.pdf7 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OS Royale Form1.pdf10 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SOPR FORM 5 18-19.pdf31 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SOPR FORM 5 19-20.pdf31 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SOPR FORM 5 20-21.pdf31 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: OandS Royale Suchita CC.pdf21 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 OandS Royale January 2022.pdf1 Feb 2022

How this compares with Mumbai Suburban

35%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep O AND S ROYALE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR WEST6,700+ in Mumbai Suburban

2 kmO AND S ROYALECompleted 100Lapsed / revoked 67Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 264 registered projects within 2 km.

Builder: SUCHITA ORANGE PROJECT ROYALE

SUCHITA ORANGE PROJECT ROYALE has 1 registration on MahaRERA, including O AND S ROYALE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if O AND S ROYALE is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of O AND S ROYALE?

The registered promoter entity is SUCHITA ORANGE PROJECT ROYALE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in O AND S ROYALE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for O AND S ROYALE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at O AND S ROYALE?

The professionals named in the filing: Architect: SUSHMA DEODHAR; Architect: Saloni Arun Deodhar; Engineer: PIYUSH KUMAR SURA; Engineer: HANWARE CONSULTANTS; Chartered Accountant: KETAN LATHIA; Chartered Accountant: BANWAT & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in O AND S ROYALE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About O AND S ROYALE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save O AND S ROYALE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.