ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Nova, Viva, Pirangut

Registration lapsed Litigation declared Residential / Group Housing project

Nova, Viva, Pirangut

By K Raheja Corp Real Estate Private Limited

RG-MH-17186 · RERA P52100028971 · Last updated on MahaRERA portal: 30 Sep 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 30 months past the filed date
  • Litigation declared, 7 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2024Possession promised30 months past this date
0Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

Nova, Viva, Pirangut is a Residential / Group Housing project by K Raheja Corp Real Estate Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100028971 on 23 Apr 2021. Possession was promised by 30 Apr 2024 and is now 30 months past that date.

At a glance

Project

  • NameNova, Viva, Pirangut
  • TypeResidential / Group Housing
  • Location
    • Pune Paud Raod
    • Near Aditya Nisarg
    • Pirangut
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • RERA no.P52100028971
  • ReraGenie IDRG-MH-17186

Builder

  • NameK Raheja Corp Real Estate Private Limited
  • Entity typeCompany
  • CINU40300MH2007PTC287012
  • GSTIN27AABCF1838M1ZF
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsRavi Chandru Raheja, Neel Chandru Raheja, Sunil Madhav Hingorani, Ramesh Ranganathan
  • Company SecretoryJignasha Thakkar
  • Other registrations20 more →
  • Completed1 of 21
  • No longer live8 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

30 months past promisethis monthRegisteredApr 2021PromisedApr 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on23 Apr 2021
  • Promised completion30 Apr 2024
  • Revised completionNone
  • Buildings7 building records
  • Documents filed140 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Townhouse No 6NA60000
Townhouse No 7NA60000
Townhouse No 8NA60000
Townhouse No 9NA60000
Townhouse no 10NA60000
Twin Villa No G1NA20000
Twin Villa No G2NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Townhouse No 6Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Townhouse No 7Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Townhouse No 8Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Townhouse No 9Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Townhouse no 10Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Twin Villa No G1Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Twin Villa No G2Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Open Space7
BuildingOpen SpaceTotal
Townhouse No 611
Townhouse No 711
Townhouse No 811
Townhouse No 911
Townhouse no 1011
Twin Villa No G111
Twin Villa No G211

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,840 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Sep 2024

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI7836.66
Proposed, not sanctioned7,837 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSuyog Sadan building mahakali caves road Andheri East Mumbai 400093

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLaxman Thite
ArchitectCrystal Arch
ArchitectMonali Bhagat
ArchitectKapadia Associates Private Limited
EngineerASCENT STRUCTURAL ENGINEERS PVT LTD CONSULTING STRUCTURAL ENGINEERS
EngineerSatish Vishnu Marathe
Chartered AccountantS N DOSHI AND ASSOCIATES
Chartered AccountantG. M. Kapadia & Co.
Chartered AccountantAKPJ & Associates
PartnerRole in project
K Raheja Corp Real Estate Private Limited-

Litigation declared7

CaseCourtStatus
2085/2010Civil Judge Senior DevisionOngoing
224/2016Additional District and Session Judge PuneOngoing
5964/2021High Court of BombayClosed
5967/2021High Court of BombayClosed
185/2020Sub Divisional officer MavalClosed
186/2020Sub Divisional officer MavalClosed
2085/2010Civil Judge Senior DivisionOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Dec 2024

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 Nova.pdf30 Sep 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Nova.pdf27 Jun 2025
Home Buyer /Allottee Grievance Redressal CellFile: Nova.pdf17 Apr 2025
Layout approvalFile: Layout Viva compressed.pdf15 Apr 2025
Copy of Layout Approval (in case of layout)File: Layout Viva compressed.pdf15 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Viva.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: Nova.pdf15 Apr 2025
Other - FinanceFile: Declaration Nova No withdrawal.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration Nova.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration Nova.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration Nova.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: Nova.pdf16 Jan 2025
Home Buyer /Allottee Grievance Redressal CellFile: Nova.pdf16 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC TH 07 09 and 10.pdf10 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC TH 08.pdf10 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC G1 and G2.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration Nova.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration Nova.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration Nova.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Nova.pdf18 Oct 2024
Home Buyer /Allottee Grievance Redressal CellFile: Nova.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Nova.pdf10 Oct 2024
Form 5 (FY 2023-2024)File: Form 5 Nova.pdf30 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nova KRCREPL.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Nova KRCREPL.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Nova.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nova.pdf18 Jul 2024
Status of ConveyanceFile: Conveyance Declaration Nova.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - Quality Assurance certificate Nova- March 24.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Quality Assurance certificate Nova PACT.pdf29 May 2024
Disclosure of sold/ booked inventoryFile: Nova_20240417162419.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nova.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Nova.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Nova.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Nova.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 Nova .pdf19 Jan 2024
Layout approvalFile: DP layout 01 compressed.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: DP layout 01 compressed.pdf20 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC 18082023.pdf20 Oct 2023
Declaration about Commencement CertificateFile: CC Declaration Nova.pdf20 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC NOVA.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: NOVA_.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Nova.pdf28 Sep 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: DOD Letter RERA.pdf17 Aug 2023
Disclosure of sold/ booked inventoryFile: NOVA_20230712201927.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A NOVA.pdf13 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A NOVA.pdf31 May 2023
Disclosure of sold/ booked inventoryFile: NOVA.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: VIVA -INVENTORY.pdf23 Mar 2023
Disclosure of sold/ booked inventoryFile: NOVA.pdf20 Feb 2023
Disclosure of sold/ booked inventoryFile: Nova.pdf19 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: NOVA Condo Declaration.pdf19 Jan 2023
Other - LegalFile: NOVA Demerger Declaration.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: NOVA SOLD-BOOKED INVENTORY.pdf20 Dec 2022
Disclosure of sold/ booked inventoryFile: NOVA_20221109133338.pdf17 Nov 2022
Layout approvalFile: DP LAYOUT PLAN Compressed 060922.pdf19 Oct 2022
Copy of Layout Approval (in case of layout)File: DP LAYOUT PLAN Compressed 060922.pdf19 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: REVISED SANCTION CC DATED 060922 compressed.pdf19 Oct 2022
Declaration about Commencement CertificateFile: CC Declaration Nova.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 Nova.pdf19 Oct 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration of Allottees Nova.pdf18 Oct 2022
Disclosure of sold/ booked inventoryFile: Nova- RERA SOLD-BOOKED INVENTORY.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 signed_NOVA_new.pdf30 Sep 2022
Disclosure of sold/ booked inventoryFile: NOVA_001.pdf12 Sep 2022
Disclosure of sold/ booked inventoryFile: Viva - Nova.pdf9 Aug 2022
Disclosure of sold/ booked inventoryFile: NOVA SOLDBOOKED INVENTO_001.pdf8 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Nova_001.pdf7 Jul 2022
CERSAI detailsFile: CERSAI PACT.pdf7 Jul 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Allottes- Nova_001.pdf7 Jul 2022
Other - LegalFile: Demeger-Nova_001.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: NOVA SOLDBOOKED INVENTO_001.pdf8 Jun 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory disclosure _NOVA.pdf11 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NOVA Form 1.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate - Nova.pdf6 Apr 2022
CERSAI detailsFile: VIVA CERSAI Status.pdf6 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Nova.pdf5 Apr 2022
Disclosure of sold/ booked inventoryFile: NOVA_001.pdf5 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Nova Condo Declaration (2).pdf4 Apr 2022
Disclosure of sold/ booked inventoryFile: NOVA.pdf11 Mar 2022
Proforma of Allotment letterFile: NOVA AFS 09022022.pdf17 Feb 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
PLOT NO.7, VIVA, PIRANGUTP52100002681Pirangut, PuneAug 2017Certificate SignedDec 2023Dec 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nova, Viva, Pirangut on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Aditya Nisarg13,700+ in Pune

Builder: K Raheja Corp Real Estate Private Limited

K Raheja Corp Real Estate Private Limited has 21 registrations on MahaRERA, including Estrella, Viva, Pirangut and Orion, Viva, Pirangut. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 16 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Nova, Viva, Pirangut shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Nova, Viva, Pirangut is delayed beyond 30 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nova, Viva, Pirangut?

The registered promoter entity is K Raheja Corp Real Estate Private Limited, a company as per the filing. Its CIN U40300MH2007PTC287012 and GSTIN 27AABCF1838M1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nova, Viva, Pirangut?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nova, Viva, Pirangut?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nova, Viva, Pirangut?

The professionals named in the filing: Architect: Laxman Thite; Architect: Crystal Arch; Architect: Monali Bhagat; Architect: Kapadia Associates Private Limited; Engineer: ASCENT STRUCTURAL ENGINEERS PVT LTD CONSULTING STRUCTURAL ENGINEERS; Engineer: Satish Vishnu Marathe. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nova, Viva, Pirangut?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nova, Viva, Pirangut. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nova, Viva, Pirangut to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.