ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / NORTHERN VILLAS

Registered No litigation declared Residential / Group Housing project

NORTHERN VILLAS

By BALAJI ENTERPRISES

RG-MH-34062 · RERA P99000080944 · Last updated on MahaRERA portal: 13 Aug 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jan 2028Possession promisedno revision filed
15 of 99Construction stages doneacross 9 buildings; furthest along: Staircases, 90%
0Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

NORTHERN VILLAS is a Residential / Group Housing project by BALAJI ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000080944 on 25 Aug 2025. Possession is promised by 13 Jan 2028.

At a glance

Project

  • NameNORTHERN VILLAS
  • TypeResidential / Group Housing
  • Location
    • CHICKHAL DONGRE RD
    • VIRAR WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • RERA no.P99000080944
  • ReraGenie IDRG-MH-34062

Builder

  • NameBALAJI ENTERPRISES
  • Entity typePartnership
  • PartnersDARSHANA ARVIND PATIL, SHIVSHANKAR REVANSIDHA KABADE
  • Other registrations10 more →
  • Completed3 of 11
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2025PromisedJan 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Aug 2025
  • Promised completion13 Jan 2028
  • Revised completionNone
  • Buildings9 building records
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RESIDENTIAL BUNGLOW TYPE ANA30000
ROW HOUSE TYPE BNA30000
ROW HOUSETYPE BNA30000
ROW HOUSE TYPE CNA30000
ROW HOUSE TYPE CNA30000
ROW HOUSE TYPE BNA30000
ROW HOUSE TYPE DNA30000
RESIDENTIAL BANGLOW TYPE ENA20000
RESIDENTIAL BANGLOW TYPE FNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 13 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Staircases, at 90%.

RESIDENTIAL BUNGLOW TYPE A57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises33%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE TYPE B56%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises33%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSETYPE B7%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE TYPE C31%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor30%
Slabs of Super Structure16%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE TYPE C7%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE TYPE B59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises33%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE TYPE D3%
ActivityProgress
Excavation30%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RESIDENTIAL BANGLOW TYPE E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RESIDENTIAL BANGLOW TYPE F0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered72
BuildingClosed/CoveredTotal
RESIDENTIAL BUNGLOW TYPE A44
ROW HOUSE TYPE B88
ROW HOUSETYPE B88
ROW HOUSE TYPE C2020
ROW HOUSE TYPE C2020
ROW HOUSE TYPE B88
ROW HOUSE TYPE D44

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3104.68
Proposed, not sanctioned3,105 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSIDDHI MANORA, C S ROAD, OPP RUCHI HOTEL, VIRAR WEST, DIST THANE, VIRAR, MAHARASHTRA, 401303

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architecthardik patil
EngineerCHIRAG MAHESH MAKANI
Chartered AccountantCHETAN NANDKISHOR NOGAJA
PartnerRole in project
BALAJI ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 13 Jan 2028

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: 7 12.pdf13 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf26 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf26 Jul 2025
Other - TechnicalFile: VP-6330.pdf26 Jul 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC BALAJI.pdf2 Jul 2025
Declaration in FORM BFile: FORM B BALAJI ENTERPRISES.pdf1 Jul 2025
Other - TechnicalFile: DECLARATION CUM UNDERTAKING BALAJI.pdf21 Jun 2025
Disclosure for secured/unsecured finance availed for the projectFile: DESCLOSURE FOR SECURED UNSECURED FINANCE.pdf21 Jun 2025
Details of encumbrances concerned to FinanceFile: BALAJI LEGAL ENC.pdf3 May 2025
Other - LegalFile: 1 index 2.pdf3 May 2025
Other - LegalFile: BALAJI OTHER LEGAL.pdf3 May 2025
Details of encumbrances concerned to LegalFile: BALAJI LEGAL ENC.pdf3 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A bank balaji.pdf14 Apr 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT (1) (1).pdf10 Apr 2025
Proforma of Allotment letterFile: ALLOTMENT-LET-NEW-AMENDED-2025.pdf10 Apr 2025
Proforma of Agreement for saleFile: NORTHERN VILLAS -DONGARE-2024 (3) RERA Formet.pdf10 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: form b bank balaji ent.pdf10 Apr 2025
Layout approvalFile: 1_compressed.pdf2 Apr 2025
Building plan approvalFile: PDF 3 FOR BUILDING 1.pdf2 Apr 2025
Building plan approvalFile: PDF 2 FOR BUILDING 2,3,6.pdf2 Apr 2025
Building plan approvalFile: PDF 4 FOR BUILDING 4,5.pdf2 Apr 2025
Building plan approvalFile: 5.pdf2 Apr 2025
Building plan approvalFile: PDF 6 FOR BUILDING 8, 9.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: 1_compressed.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_19625.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PDF 3 FOR BUILDING 1.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PDF 2 FOR BUILDING 2,3,6.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PDF 4 FOR BUILDING 4,5.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PDF 6 FOR BUILDING 8, 9.pdf2 Apr 2025
CERSAI detailsFile: Cersai details.pdf1 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation allotment report.pdf1 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Deviation allotment report.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Shivshankar kabade interest.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Darshana patil interest.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Arvind Patil interest.pdf1 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Sachin Jhambare interest.pdf1 Apr 2025
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANENCE.pdf28 Feb 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANENCE.pdf28 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Near Makwana Complex, VS Marg,.pdf6 Feb 2024
PAN CardFile: PAN CAD.pdf3 Feb 2024

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NORTHERN VILLAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIRAR WEST3,200+ in Palghar

Builder: BALAJI ENTERPRISES

BALAJI ENTERPRISES has 11 registrations on MahaRERA, including KRUSHNA SHANTI APARTMENT A WING and ADITYA APPARTMENT. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if NORTHERN VILLAS is delayed beyond 13 Jan 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NORTHERN VILLAS?

The registered promoter entity is BALAJI ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NORTHERN VILLAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NORTHERN VILLAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NORTHERN VILLAS?

The professionals named in the filing: Architect: hardik patil; Engineer: CHIRAG MAHESH MAKANI; Chartered Accountant: CHETAN NANDKISHOR NOGAJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NORTHERN VILLAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NORTHERN VILLAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NORTHERN VILLAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.