ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / North26

Registered No litigation declared Others project

North26

By SHIV DEVELOPERS

RG-MH-19109 · RERA P52000078153 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Basement (if any), 90%
48 of 81Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

North26 is a Others project by SHIV DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000078153 on 25 Nov 2024. Possession is promised by 31 Dec 2027. 33 of the 81 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameNorth26
  • TypeOthers
  • Location
    • sector 17
    • navi Mumbai
    • New Panvel
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000078153
  • ReraGenie IDRG-MH-19109

Builder

  • NameSHIV DEVELOPERS
  • Entity typePartnership
  • GSTIN27AESFS3981C1ZK
  • PartnersHARESH KUMAR GANESHA NOR, VINOD KUMAR GOVINDBHAI PATEL
  • Other registrations13 more →
  • Completed6 of 14
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

41%33 of 81 units booked
41.6%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
North26NA1210671481

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

North26: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks44%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.11%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.7%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed187

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots187
Closed/Covered187

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,030 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Oct 2025

Approvals and building plan

Sanctioning authorityPANVEL MUNICIPAL CORPORATION
Permissible FSI11550.75
Proposed, not sanctioned6,924 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 16, Ground Floor, Kanakia Zillion, LBS-CST Road, Junction,BKC Annexe, Kurla(W),Mumbai,Maharashtra-400070
Estimated costRs 37.98 cr
Cost incurredRs 15.79 cr
Work done41.58%
BuildingWingEstimatedIncurred
North26NARs 29.93 crRs 15.45 cr
-NARs 8.05 crRs 33.70 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architect
EngineerSamarth Agarwal
EngineerMAHESH A BAGADE
EngineerSamarth Prdeepkumar Agarwal
Chartered AccountantJ B Patel & Associates
Chartered AccountantRSL & CO
PartnerRole in project
SHIV DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: NORTH26 - Q4 - FORM 1.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2 Q4.pdf24 Apr 2026
Withdrawal Update Form 3File: FORM 3- SHIV DEVELOPERS Q4.pdf24 Apr 2026
Withdrawal Update Form 1File: Shiv developers - Q3 - Form 1.pdf19 Feb 2026
Withdrawal Update Form 2File: Signed Form 2 Engineer Certificate Q2 FY 25-26.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 (3).pdf19 Feb 2026
Form 2A (FY 2024-2025)File: Signed Form 2A.pdf30 Jan 2026
Withdrawal Update Form 1File: Signed Form 1.pdf27 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q2 FY 25-26.pdf27 Jan 2026
Withdrawal Update Form 3File: FORM 3-.pdf27 Jan 2026
Form 5 (FY 2024-2025)File: Form 5_Shiv Developers_FY 24-25.pdf17 Nov 2025
Form 1File: Form 1 Architect Certificate.pdf25 Sep 2025
Form 2File: form 2 june quarter shiv developers.pdf25 Sep 2025
Form 3File: Form 3_Shiv Developers(North 26)_June 25.pdf25 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory - Q1 FY 25-26.pdf25 Sep 2025
Form 1File: Form 1 - Dec 24.pdf12 Sep 2025
Form 2File: Form 2 - Dec 24.pdf12 Sep 2025
Form 3File: Form-3 Signed.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold - Booked Dec 2024_compressed.pdf12 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APRIL 2025.pdf23 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf18 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf18 Mar 2025
Details of encumbrances concerned to FinanceFile: Encumbrances certificate.pdf11 Mar 2025
CERSAI detailsFile: cersai certificate.pdf11 Mar 2025
Details of encumbrances concerned to LegalFile: Encumbrances certificate.pdf11 Mar 2025
Proforma of Allotment letterFile: Allotment Letter - Shiv Developers.pdf4 Feb 2025
Other - LegalFile: RERA_Mortgage Declaration.pdf4 Feb 2025
Deviation Report with respect to Allotment letterFile: Allotment Letter - Shiv Developers.pdf4 Feb 2025
Deviation Report with respect to model copy of AgreementFile: NORTH26_RERA AFS.pdf4 Feb 2025
Proforma of Agreement for saleFile: NORTH26_RERA AFS.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 24.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Signed.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 24.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold - Booked Dec 2024_compressed.pdf15 Jan 2025
Building plan approvalFile: Highlighted Plan 3-5.pdf5 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Highlighted Plan 3-5.pdf5 Nov 2024
Other - LegalFile: Lease agreement.pdf28 Oct 2024
Proforma of Allotment letterFile: Final Allotment Letter Draft.pdf13 Aug 2024
Declaration about Commencement CertificateFile: Declaration about CC (1).pdf8 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured finance availed for the Project.pdf8 Aug 2024
Other - LegalFile: Lease Agreement 26_17-pages-3.pdf7 Aug 2024
Other - LegalFile: Lease Agreement 26_17-pages-1.pdf7 Aug 2024
Other - LegalFile: Lease Agreement 26_17-pages-2.pdf7 Aug 2024
Other - LegalFile: Lease Agreement 26_17-pages-4.pdf7 Aug 2024
Other - LegalFile: Lease Agreement 26_17-pages-5.pdf7 Aug 2024
Other - LegalFile: Lease Agreement 26_17-pages-6.pdf7 Aug 2024
Other - TechnicalFile: 1 Other - Technical (1).pdf7 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A_Declaration about RERA Designated Bank Accounts For Real Estate.pdf6 Aug 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Opening of rera desi bank account format B.pdf6 Aug 2024
Building plan approvalFile: HIGHLIGHTED PLAN-4.pdf2 Aug 2024
Building plan approvalFile: HIGHLIGHTED PLAN 1-2.pdf2 Aug 2024
Building plan approvalFile: HIGHLIGHTED PLAN-2.pdf2 Aug 2024
Layout approvalFile: HIGHLIGHTED PLAN 1.pdf2 Aug 2024
Copy of the legal title reportFile: Final Title Report Highlighted.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: HIGHLIGHTED PLAN 1.pdf2 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: HIGHLIGHTED PLAN-2.pdf2 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: HIGHLIGHTED PLAN 1-2.pdf2 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: HIGHLIGHTED PLAN-4.pdf2 Aug 2024
PAN CardFile: Shiv Developer PAN Card.pdf1 Aug 2024
Details of encumbrances concerned to FinanceFile: Finance Encumbrances.pdf1 Aug 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf1 Aug 2024
Declaration in FORM BFile: Form B.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf1 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf1 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: HIGHLIGHTED CC_compressed.pdf1 Aug 2024
CERSAI detailsFile: Undertaking about CERSAI.pdf1 Aug 2024
Deviation Report with respect to Allotment letterFile: No deviation of Allotment letter.pdf1 Aug 2024
Details of encumbrances concerned to LegalFile: Finance Encumbrances.pdf1 Aug 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf1 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report of AFS.pdf1 Aug 2024
Proforma of Agreement for saleFile: AFS - Shiv Developers.pdf1 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Other Real Estate Organisations Vinod.pdf1 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Other Real Estate Organisations (Haresh).pdf1 Aug 2024

How this compares with Raigarh

41%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep North26 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near navi Mumbai5,900+ in Raigarh

2 kmNorth26Completed 91Lapsed / revoked 21Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 194 registered projects within 2 km.

Builder: SHIV DEVELOPERS

Shiv Developers has 14 registrations on MahaRERA, including SHREYASH SANKUL and SHIV SAMRUDHI - A WING. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if North26 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of North26?

The registered promoter entity is SHIV DEVELOPERS, a partnership as per the filing. Its GSTIN 27AESFS3981C1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in North26?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for North26?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at North26?

The professionals named in the filing: Architect: Atul Patel Architect; Engineer: Samarth Agarwal; Engineer: MAHESH A BAGADE; Engineer: Samarth Prdeepkumar Agarwal; Chartered Accountant: J B Patel & Associates; Chartered Accountant: RSL & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in North26?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About North26. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save North26 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.