ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / NMS 17 WEST

Registered No litigation declared Others project

NMS 17 WEST

By VARUN REALTY

RG-MH-84495 · RERA P52000033202 · Last updated on MahaRERA portal: 8 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Internal walls, 88%
30 of 149Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

NMS 17 WEST is a Others project by VARUN REALTY in Raigarh, Maharashtra, registered with MahaRERA as P52000033202 on 9 Feb 2022. Possession is promised by 31 Dec 2027. 119 of the 149 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameNMS 17 WEST
  • TypeOthers
  • Location
    • PLOT NO-08
    • SECTOR-17
    • NEW PANVEL
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000033202
  • ReraGenie IDRG-MH-84495

Builder

  • NameVARUN REALTY
  • Entity typePartnership
  • PartnersHIREN SHAMJI RAVARIYA, MAHESH NARAYAN GOTHI, MITESH NARAN GOTHI, AMBAVI MAHADEV GOTHI

Key dates

this monthRegisteredFeb 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Feb 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

80%119 of 149 units booked
62.2%Work done, per cost certificate

Figures as on 8 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NMS 17 WESTNA161313811149

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 88%.

NMS 17 WEST: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed136

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots136
Closed/Covered136

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,444 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPANVEL MUNICPAL CORPORATION
Permissible FSI12256.16
Proposed, not sanctioned9,805 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCORAL CREST PLOT NO-3, SECTOR-23, NEAR NERUL STATION, NAVI MUMBAI
Estimated costRs 26.58 cr
Cost incurredRs 16.54 cr
Work done62.22%
BuildingWingEstimatedIncurred
NMS 17 WESTNARs 23.00 crRs 16.54 cr
-NARs 3.58 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESTINATION ARCHITECTURE INTERIOR DESIGNS
EngineerSTRUCTURAL CONCEPT DESIGNS PVT LTD
EngineerSantosh Sakate
Chartered AccountantH M SHAH & ASSOCIATES
Chartered AccountantP.R.Vora and Associates
PartnerRole in project
VARUN REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A - New Format 2024-25.pdf8 May 2026
Form 2A (FY 2023-2024)File: Form 2A - New Format 2023-24.pdf8 May 2026
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf8 May 2026
Building plan approvalFile: Plans (Parking and Built up area highlighted) 1.pdf18 Apr 2026
Building plan approvalFile: Plans 2 - 6.pdf18 Apr 2026
Withdrawal Update Form 1File: Form1 Q3 25-26.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 Mar 2026.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 Mar 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 Dec 2025.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 Mar 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 Mar 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: Form3 Q3 25-26.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 Mar 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 Mar 2026.pdf17 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf17 Apr 2026
Withdrawal Update Form 1File: Form1 Q3 25-26.pdf9 Feb 2026
Withdrawal Update Form 2File: Form2 Q3 25-26.pdf9 Feb 2026
Withdrawal Update Form 3File: Form3 Q3 25-26.pdf9 Feb 2026
Withdrawal Update Form 1File: Final form 1.pdf29 Nov 2025
Withdrawal Update Form 1File: FORM1 Q2 25-26_.pdf29 Nov 2025
Withdrawal Update Form 2File: Final form 2.pdf29 Nov 2025
Withdrawal Update Form 2File: FORM2 Q2 25-26.pdf29 Nov 2025
Withdrawal Update Form 3File: Final form 3.pdf29 Nov 2025
Withdrawal Update Form 3File: Form3 Q2 25-26..pdf29 Nov 2025
Form 1File: Final form 1.pdf29 Jul 2025
Form 2File: Final form 2.pdf29 Jul 2025
Form 3File: Final form 3.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Sold Letter.pdf29 Jul 2025
Withdrawal Update Form 1File: Final form 1.pdf29 Jul 2025
Withdrawal Update Form 1File: Final form 1.pdf29 Jul 2025
Withdrawal Update Form 2File: Final form 2.pdf29 Jul 2025
Withdrawal Update Form 2File: Final form 2.pdf29 Jul 2025
Withdrawal Update Form 3File: Final form 3.pdf29 Jul 2025
Withdrawal Update Form 3File: Final form 3.pdf29 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final FORM 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory Sold Letter.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final form 1.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final form 3.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final form 3.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final form 3.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final form 2.pdf5 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Varun Realty ___.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NMS 17 WEST _ ARCHITECT'S CERTIFICATE_FORM 1.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NMS 17 WEST.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: NMS 17 WEST SOLD,UNSOLD.pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NMS 17 WEST.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: VARUN REALTY-INVENTORY SOLD LETTER.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE_FORM 1.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 with sign_11zon.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 varun realty sep.pdf18 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE_FORM 1 sep 2023.pdf5 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NMS 17 WEST.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 with Sign.pdf29 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE march 2023.pdf20 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE aug 2023.pdf20 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate march 2023.pdf20 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate aug 2023.pdf20 Sep 2023
Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf26 Sep 2022
Layout approvalFile: Copy of Layout Approval.pdf4 Feb 2022
Building plan approvalFile: Building Plan Approval.pdf4 Feb 2022
Copy of the legal title reportFile: Copy of Legal Title Report.pdf4 Feb 2022
Copy of Layout Approval (in case of layout)File: Copy of Layout Approval.pdf4 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf4 Feb 2022
Declaration in FORM BFile: form b declaration.pdf4 Feb 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificat.pdf1 Feb 2022
CERSAI detailsFile: cersai.pdf1 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-3.pdf1 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf29 Jan 2022
PAN CardFile: PAN CARD.pdf28 Jan 2022
Details of encumbrancesFile: Encumbrance certificate.pdf28 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf28 Jan 2022
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf28 Jan 2022

How this compares with Raigarh

80%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NMS 17 WEST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEW PANVEL5,900+ in Raigarh

Builder: VARUN REALTY

VARUN REALTY has 1 registration on MahaRERA, including NMS 17 WEST. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if NMS 17 WEST is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NMS 17 WEST?

The registered promoter entity is VARUN REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NMS 17 WEST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NMS 17 WEST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NMS 17 WEST?

The professionals named in the filing: Architect: DESTINATION ARCHITECTURE INTERIOR DESIGNS; Engineer: STRUCTURAL CONCEPT DESIGNS PVT LTD; Engineer: Santosh Sakate; Chartered Accountant: H M SHAH & ASSOCIATES; Chartered Accountant: P.R.Vora and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NMS 17 WEST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NMS 17 WEST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NMS 17 WEST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.