Home / Browse projects / Palghar, Maharashtra / NIVETAM APARTMENT
NIVETAM APARTMENT
By SHREE MANGALMURTI ENTERPRISES
RG-MH-46795 · RERA P99000050551 · Last updated on MahaRERA portal: 4 May 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NIVETAM APARTMENT is a Residential / Group Housing project by SHREE MANGALMURTI ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000050551 on 21 Apr 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 12 months from the original filing. 11 of the 27 units on this registration are recorded sold or booked, and 9 of 9 construction stages are filed complete.
At a glance
Project
- NameNIVETAM APARTMENT
- TypeResidential / Group Housing
- Location
- NANDADE ROAD
- NANDADE
- Umberpada
- Palghar
- 401102
- Pincode401102
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000050551
- ReraGenie IDRG-MH-46795
Builder
- NameSHREE MANGALMURTI ENTERPRISES
- Entity typePartnership
- Other registrations3 more →
- Completed2 of 4
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Apr 2023
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2025)
- Buildings1 building record
- Documents filed81 files
Current status
Figures as on 4 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NIVETAM APARTMENT | NA | 7 | 6 | 27 | 0 | 27 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 9 construction stages are filed complete.
NIVETAM APARTMENT: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | Not applicable |
| Street Lighting | Yes | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | Not applicable |
| Solid Waste Management And Disposal | Yes | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed33
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| BANAWARI LAKHMICHAND BIJLANI | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NIVETAM APARTMENT | NA | Rs 2.71 cr | Rs 2.71 cr |
| - | NA | Rs 54.15 lakh | Rs 43.32 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR ROSHAN PATIL |
| Engineer | structect consultancy |
| Engineer | SH |
| Engineer | MUFADDAL MERCHANT |
| Chartered Accountant | PP Barapatre & co |
| Chartered Accountant | CHRYSTAL LOPES |
| Partner | Role in project |
|---|---|
| SHREE MANGALMURTI ENTERPRISES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterMAHARERA CERTIFICATE WAS EXPIRED ON 30.06.2025 AND WE HAVE RECD OCCUPANCY CERTIFICATE ON 02.07.2025.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: NIVETAM FORM 3.pdf | 4 May 2026 |
| Occupational CertificateFile: MANGAL MURTI OC.pdf | 4 May 2026 |
| Occupational CertificateFile: Form 4 (1).pdf | 4 May 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: NIVETAM FORM 3.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: NIVETAM FORM 3.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: NIVETAM FORM 3.pdf | 24 Feb 2026 |
| Form 1File: form 1 30062023.pdf | 11 Oct 2025 |
| Form 2File: Form 2 30062023.pdf | 11 Oct 2025 |
| Form 3File: form 3 30062023.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: nivetam apt sold n unsold list 300623.pdf | 11 Oct 2025 |
| Form 1File: form 1 30092023.pdf | 11 Oct 2025 |
| Form 2File: form 2 30092023.pdf | 11 Oct 2025 |
| Form 3File: Form 3 30092023.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: nivetam apt sold n unsold list 300923.pdf | 11 Oct 2025 |
| Form 1File: form 1 31122023.pdf | 11 Oct 2025 |
| Form 2File: Form 2 31122023.pdf | 11 Oct 2025 |
| Form 3File: Form 3 31122023.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: nivetam apt sold n insold list 311223.pdf | 11 Oct 2025 |
| Form 1File: form 1 31032024.pdf | 11 Oct 2025 |
| Form 2File: Form 2 31032024.pdf | 11 Oct 2025 |
| Form 3File: Form 3 31032024.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: nivetam sold n unsold list 310324.pdf | 11 Oct 2025 |
| Form 1File: form 1 30062024.pdf | 11 Oct 2025 |
| Form 2File: Form 2 30062024.pdf | 11 Oct 2025 |
| Form 3File: form 3 30062024.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: nivetam sold n unsold list 300624.pdf | 11 Oct 2025 |
| Form 1File: form 1 30092024.pdf | 11 Oct 2025 |
| Form 2File: Form 2 30092024.pdf | 11 Oct 2025 |
| Form 3File: form 3 30092024.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: nivetam apt sold n unsold list 300924.pdf | 11 Oct 2025 |
| Form 1File: form 1 31122024.pdf | 11 Oct 2025 |
| Form 2File: Form 2 31122024.pdf | 11 Oct 2025 |
| Form 3File: Form 3 31122024.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: nivetam sold n unsold list 311224.pdf | 11 Oct 2025 |
| Form 1File: Form 1 31032025.pdf | 11 Oct 2025 |
| Form 2File: Form 2 31032025.pdf | 11 Oct 2025 |
| Form 3File: Form 3 31032025.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: nivetam sold n unsold list 310325.pdf | 11 Oct 2025 |
| Form 1File: FORM 1 30062025.pdf | 11 Oct 2025 |
| Form 2File: Form 2 30062025.pdf | 11 Oct 2025 |
| Form 3File: Form 3 30062025.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Nivetam sold n unsold list 300625.pdf | 11 Oct 2025 |
| Form 2A (FY 2023-2024)File: form 2a nivetam 31032024.pdf | 9 Oct 2025 |
| Form 2A (FY 2024-2025)File: form 2a nivetam 31032025.pdf | 9 Oct 2025 |
| Form 5 (FY 2023-2024)File: 010423 to 310324.pdf | 9 Oct 2025 |
| Form 5 (FY 2024-2025)File: 010424 to 310325.pdf | 9 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 architect certificate nivetam apt (1).pdf | 5 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 nivetam apt (1).pdf | 5 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate nivetam apt.pdf | 5 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: NO DEVIATION FOR AGREEMENT FOR SALE.pdf | 19 Apr 2023 |
| Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf | 28 Mar 2023 |
| Proforma of Agreement for saleFile: RERA Agreement SME draft (REVISED)ab.pdf | 27 Mar 2023 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT (2).pdf | 14 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Cconstruction Permision.pdf | 27 Feb 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200261375409_For_Asset_Based_Search_26_02_2023_12_43_16_514.pdf | 27 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest aparna tushar kawali.pdf | 27 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Manoj Patil.pdf | 27 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Kalpesh.pdf | 27 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SME RERA FORM 3 (1).pdf | 24 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: non ecumberances concered to Legal.pdf | 21 Feb 2023 |
| Details of encumbrances concerned to LegalFile: non ecumberances concered to Legal.pdf | 21 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account.pdf | 21 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation report with respect to allotement letter.pdf | 21 Feb 2023 |
| Proforma of Allotment letterFile: Allotement letter.pdf | 20 Feb 2023 |
| Layout approvalFile: LAYOUT PLAN.pdf | 19 Feb 2023 |
| Building plan approvalFile: BLUE PRINT.pdf | 19 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 19 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT.pdf | 19 Feb 2023 |
| Declaration in FORM BFile: SME FORM B PROMOTOR_compressed.pdf | 21 Apr 2022 |
| PAN CardFile: 1 PAN CARD SHREE MANGALMURTI ENTERPRISES.pdf | 6 Apr 2022 |
| Details of encumbrancesFile: 3 encumbranses_compressed.pdf | 6 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 ARCHITECH CERTIFICATE FORM 01_compressed.pdf | 6 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
Keep NIVETAM APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NANDADE3,200+ in Palghar
Filed coordinates, straight-line distance. 60 registered projects within 2 km.
BLOSSOM AVENUE
DILIPKUMAR AMBALAL JAIN
RAJLAXXMI PARK
SAPHALE LAND DEVELOPERS LLP
STAR VIRATHAN CITY
STAR BUILDERS & DEVELOPERS
VIDHATA EMPIRE
K.M.WORLD
MITHILA COMPLEX
NAVAL RAMBAHADUR SINGH
PARIVAR COMPLEX BUILDING NO 1 AND 3
PARIVAR HOMES
See every Palghar project, with the district possession charts
Builder: SHREE MANGALMURTI ENTERPRISES
SHREE MANGALMURTI ENTERPRISES has 4 registrations on MahaRERA, including MANGALMURTI GALAXY and SHREE CHARAN APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if NIVETAM APARTMENT is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NIVETAM APARTMENT?
The registered promoter entity is SHREE MANGALMURTI ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NIVETAM APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NIVETAM APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NIVETAM APARTMENT?
The professionals named in the filing: Architect: AR ROSHAN PATIL; Engineer: structect consultancy; Engineer: SH; Engineer: MUFADDAL MERCHANT; Chartered Accountant: PP Barapatre & co; Chartered Accountant: CHRYSTAL LOPES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NIVETAM APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback