NIVAAS HOMES

By LETTING PROPERTIES LLP

RG-MH-66841 · RERA P99000034129 · Last updated on MahaRERA portal: 2 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
85 of 137Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

NIVAAS HOMES is a Others project by LETTING PROPERTIES LLP in Palghar, Maharashtra, registered with MahaRERA as P99000034129 on 24 Mar 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 52 of the 137 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameNIVAAS HOMES
  • TypeOthers
  • Location
    • STATION ROAD
    • NAVALI VILLAGE
    • Palghar
    • 401102
  • Pincode401102
  • RERA no.P99000034129
  • ReraGenie IDRG-MH-66841

Builder

  • NameLETTING PROPERTIES LLP
  • Entity typePartnership
  • PartnersSHAILESH UTTAMCHAND DESAI, NIKHIL RAMESH LALA
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredMar 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Mar 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Current status

38%52 of 137 units booked
100.0%Work done, per cost certificate

Figures as on 2 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NIVAAS HOMESNA8811225137

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

NIVAAS HOMES: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Open Space61

Land and ownership12

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,505 sq m
Land owned byThe promoter, with other names on the file
Named landowners12
LandownerVillageDistrict
Alpesh Babulal HiraniAndheriMumbai Suburban
Anand Babulal MehtaAndheriMumbai Suburban
Tejpal Kanmal MadhaniBorivaliMumbai Suburban
Real SpacePalghar Palghar
Manisha Vijay LadhaniAndheriMumbai Suburban
Sanjay Babulal LadhaniAndheriMumbai Suburban
Viajy Baulal LadhaniAndheriMumbai Suburban
Hemant Babulal MehtaAndheriMumbai Suburban
Shantilal Leharchand ShahAndheriMumbai Suburban
Bucon Engineers and Infrasture Pvt ltdAndheriMumbai Suburban
Relcon Realty Pvt LtdAndheriMumbai Suburban
Ramesh Hamirmal BafnaPalghar Palghar

Approvals and building plan

Sanctioning authorityPalghar Nargar Parishad
Permissible FSI7505.28
Proposed, not sanctioned7,505 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 12345 SHREE RAM SANKUL ACHOLE ROAD NALASOPARA EAST TAL VASAI DIST PALGHAR
Estimated costRs 16.80 cr
Cost incurredRs 16.80 cr
Work done100.0%
BuildingWingEstimatedIncurred
NIVAAS HOMESNARs 16.61 crRs 16.61 cr
-NARs 20.00 lakhRs 20.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA P ASSOCIATES
Engineercenter line consultants & engineers
Chartered AccountantD Devandrakumar & Associates
Chartered AccountantRonak Thathakar
Chartered AccountantPRANAY PANDYA & ASSOCIATES
PartnerRole in project
LETTING PROPERTIES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 23082025.pdf2 Mar 2026
Withdrawal Update Form 1File: Form 1 23082025.pdf2 Mar 2026
Withdrawal Update Form 2File: Form 2 23082025.pdf2 Mar 2026
Withdrawal Update Form 2File: Form 2 23082025.pdf2 Mar 2026
Withdrawal Update Form 3File: Form 3 23082025.pdf2 Mar 2026
Withdrawal Update Form 3File: Form 3 23082025.pdf2 Mar 2026
Form 2A (FY 2024-2025)File: Nivaas Homes Form-2A 2024-25 (2).pdf18 Jan 2026
Form 1File: Form 1 Q4.pdf3 Jun 2025
Form 2File: Form 2 Q4.pdf3 Jun 2025
Form 3File: Form 3 Q4.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Q4.pdf3 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 01Form 5.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-ARCHITECT Q1.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-ARCHITECT R8A.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Artitect Certificate Q3.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3Letting Properties LLP June-24 (1)_compressed.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Letting Properties LLP September_compressed.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Letting Properties LLP Dec_compressed.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate June 2024.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate Sep 2024.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate Dec 2024(Letting properties).pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-ARCHITECT Q1.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate June 2024.pdf9 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A (fy-23-24)(Letting Properties).pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Letting_compressed.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nivaas Mar24 Arch certificate.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate MARCH 2024.pdf2 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Letting FY 2022-23.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Letting Properties June-23 (1)_compressed.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Letting Sep-23_compressed.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Letting Dec-23_compressed.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate-Signed.pdf16 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Signed.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD UNIT DETAIL- NIVAAS 30th December 2023.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-ARCHITECT R5.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD UNIT DETAIL- NIVAAS 30th Sep 2023.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-ARCHITECT - Artitect.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-ARCHITECT R5.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-ARCHITECT R5.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Nivas Homes Form-2 (1) (1).pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Engineer Certificate- Nivas Homes (Letting Properties).pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate.pdf4 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Artitect Certificate.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wngineer Certificate.pdf23 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (1).pdf23 Jun 2023
Copy of the legal title reportFile: Navali Search 1to6_compressed.pdf1 Mar 2023
Copy of the legal title reportFile: Navali Search 7to12_compressed.pdf1 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-ARCHITECT R2.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Nivas Homes Form-2 dec quarter.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Compressed CA Certificate.pdf23 Feb 2023
Declaration about Commencement CertificateFile: Declaration CC.pdf23 Mar 2022
CERSAI detailsFile: CERSAI Report.pdf23 Mar 2022
Copy of the legal title reportFile: Legal Title New_compressed.pdf19 Mar 2022
Proforma of Allotment letterFile: Agreemenr for Sale Draft.pdf19 Mar 2022
CERSAI detailsFile: Navli CC Navali Compressed.pdf8 Dec 2021
Details of encumbrancesFile: No encumbance CertNavli.pdf6 Dec 2021
Declaration in FORM BFile: Form B Developer.pdf6 Dec 2021
Proforma of Allotment letterFile: Allotment Letter Final (2).pdf6 Dec 2021
Layout approvalFile: 1-layout sheets.pdf5 Dec 2021
Layout approvalFile: 2-layout sheets.pdf5 Dec 2021
Layout approvalFile: 3-layout sheets.pdf5 Dec 2021
Layout approvalFile: 4-layout sheets.pdf5 Dec 2021
Building plan approvalFile: 1-layout sheets.pdf5 Dec 2021
Building plan approvalFile: 2-layout sheets.pdf5 Dec 2021
Building plan approvalFile: 3-layout sheets.pdf5 Dec 2021
Building plan approvalFile: 4-layout sheets.pdf5 Dec 2021
PAN CardFile: pan card letting.pdf5 Dec 2021
Copy of Layout Approval (in case of layout)File: 1-layout sheets.pdf5 Dec 2021
Copy of Layout Approval (in case of layout)File: 2-layout sheets.pdf5 Dec 2021
Copy of Layout Approval (in case of layout)File: 3-layout sheets.pdf5 Dec 2021
Copy of Layout Approval (in case of layout)File: 4-layout sheets.pdf5 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: 1-layout sheets.pdf5 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: 2-layout sheets.pdf5 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: 3-layout sheets.pdf5 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: 4-layout sheets.pdf5 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: Navli CC Navali Compressed.pdf5 Dec 2021
Declaration about Commencement CertificateFile: Navli CC Navali Compressed.pdf5 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 28oct21.pdf5 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificateNivas Homes Form-2 (1).pdf5 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nivas home Form 3.pdf5 Dec 2021

How this compares with Palghar

38%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIVAAS HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVALI VILLAGE3,200+ in Palghar

Builder: LETTING PROPERTIES LLP

LETTING PROPERTIES LLP has 2 registrations on MahaRERA, including SUSHAM NIVAAS and NIVAAS HOMES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that NIVAAS HOMES shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NIVAAS HOMES is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIVAAS HOMES?

The registered promoter entity is LETTING PROPERTIES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIVAAS HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIVAAS HOMES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIVAAS HOMES?

The professionals named in the filing: Architect: A P ASSOCIATES; Engineer: center line consultants & engineers; Chartered Accountant: D Devandrakumar & Associates; Chartered Accountant: Ronak Thathakar; Chartered Accountant: PRANAY PANDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIVAAS HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIVAAS HOMES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIVAAS HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.