ReraGenieLog inGet a buyer report

Home / Browse projects / NISHUVI REHAB PHASE

De-registered No litigation declared Residential / Group Housing project

NISHUVI REHAB PHASE

By NISHUVI CORPORATION

RG-MH-20865 · RERA P51900003953 · Last updated on MahaRERA portal: 7 Nov 2023

Source: official MahaRERA filing

Red flags

  • De-registered

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2027Possession promisedno revision filed
12 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 60%
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

NISHUVI REHAB PHASE is a Residential / Group Housing project by NISHUVI CORPORATION in 400018, registered with MahaRERA as P51900003953 on 7 Aug 2017. Possession is promised by 30 Dec 2027.

At a glance

Project

  • NameNISHUVI REHAB PHASE
  • TypeResidential / Group Housing
  • Location
    • 400018
  • Pincode400018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900003953
  • ReraGenie IDRG-MH-20865

Builder

  • NameNISHUVI CORPORATION
  • Entity typePartnership
  • PartnersINDUKUMAR KAPASHI, PARESH KAPASHI, NIMISH KAPASHI

Key dates

this monthRegisteredAug 2017PromisedDec 2027

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on7 Aug 2017
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed107 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA20000
BUILDING BNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 60%.

BUILDING A94%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
BUILDING B33%
ActivityProgress
Excavation60%
Basement (if any)50%
Podiums (if any)100%
Plinth50%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,875 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3863.48
Proposed, not sanctioned3,863 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTATA ROAD NO 2 OPERA HOUSE MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPANKAJ B DESAI
EngineerRajesh Shah Engineers & Consultants
Chartered AccountantVINODK MEHTA & CO
PartnerRole in project
NISHUVI CORPORATION-

Litigation declared1

CaseCourtStatus
2901/2010THE HIGH COURT OF JUDICATURE AT BOMBAYPre Admission

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form-3 30 june 2022.PDF7 Nov 2023
Certificates of CA (Form 3)File: Form-3 30 sept 2022.PDF7 Nov 2023
Certificates of CA (Form 3)File: Form-3 3 Dec 2022.PDF7 Nov 2023
Certificates of CA (Form 3)File: Form-3 31 March 2023.PDF7 Nov 2023
Certificates of CA (Form 3)File: Form-3 30 June 2023.PDF7 Nov 2023
Certificates of CA (Form 3)File: Form-3 30 Sept 2023.PDF7 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAICERT_ 8717_ 30917.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAICERT_11017_311217.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT 1118_31318.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1418_30618.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1718_30918.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_11018_311218.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1119_31319.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1419_30619.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1719_30919.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_11019_311219.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1120_31320.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1420_30620.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1720_30920.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_11020_311220.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1121_31321.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1421_30621.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1721_30921.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_11021_311221.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1122_31322.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1422_30622.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1722_30922.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_11022_311222.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1123_31323.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1423_30623.PDF3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PDESAI_CERT_1723_30923.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP_2017.pdf3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC_2017.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MARCH_2018.pdf3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE_2018.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP_2018.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC_2018.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MARCH_2019.pdf3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE_2019.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP_2019.pdf3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC_2019.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MARCH_2020.pdf3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE_2020.pdf3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP_2020.pdf3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC_2020.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MARCH_2021.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE_2021.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP_2021.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC_2021.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MARCH_2022.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE_2022.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP_2022.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC_2022.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MARCH_2023.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE_2023.PDF3 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP_2023.PDF3 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ANNUAL REPORT FOR FY 2022-2023.pdf3 Nov 2023
Certificates of CA (Form 3)File: DEC2017.PDF30 Oct 2023
Certificates of CA (Form 3)File: MARCH 2018.PDF30 Oct 2023
Certificates of CA (Form 3)File: JUNE 2018.PDF30 Oct 2023
Certificates of CA (Form 3)File: SEP2018.PDF30 Oct 2023
Certificates of CA (Form 3)File: DEC 2018.PDF30 Oct 2023
Certificates of CA (Form 3)File: MARCH 2019.PDF30 Oct 2023
Certificates of CA (Form 3)File: JUNE2019.PDF30 Oct 2023
Certificates of CA (Form 3)File: SEP2019.PDF30 Oct 2023
Certificates of CA (Form 3)File: DEC 2019.PDF30 Oct 2023
Certificates of CA (Form 3)File: MARCH 2020.PDF30 Oct 2023
Certificates of CA (Form 3)File: JUNE 2020.PDF30 Oct 2023
Certificates of CA (Form 3)File: SEP2020.PDF30 Oct 2023
Certificates of CA (Form 3)File: DEC 2020.PDF30 Oct 2023
Certificates of CA (Form 3)File: MARCH 2021.PDF30 Oct 2023
Certificates of CA (Form 3)File: JUNE 2021.PDF30 Oct 2023
Certificates of CA (Form 3)File: SEP 2021.PDF30 Oct 2023
Certificates of CA (Form 3)File: DEC 2021.PDF30 Oct 2023
Certificates of CA (Form 3)File: MARCH 2022.PDF30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - (FY2018-19).pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - (FY2019-20).pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - (FY2020-21).pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 (FY2021 22).pdf30 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: M H I KHAN (3).PDF28 Oct 2023

Keep NISHUVI REHAB PHASE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmNISHUVI REHAB PHASECompleted 5Lapsed / revoked 5Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: NISHUVI CORPORATION

NISHUVI CORPORATION has 1 registration on MahaRERA, including NISHUVI REHAB PHASE. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that NISHUVI REHAB PHASE shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NISHUVI REHAB PHASE is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NISHUVI REHAB PHASE?

The registered promoter entity is NISHUVI CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NISHUVI REHAB PHASE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NISHUVI REHAB PHASE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NISHUVI REHAB PHASE?

The professionals named in the filing: Architect: PANKAJ B DESAI; Engineer: Rajesh Shah Engineers & Consultants; Chartered Accountant: VINODK MEHTA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NISHUVI REHAB PHASE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NISHUVI REHAB PHASE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NISHUVI REHAB PHASE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.