Home / Browse projects / Nashik, Maharashtra / NISHIGANDH APARTMENT

Completed No litigation declared Residential / Group Housing project

NISHIGANDH APARTMENT

By C B CONSTRUCTION

RG-MH-15526 · RERA P51600045379 · Last updated on MahaRERA portal: 10 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
4 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

NISHIGANDH APARTMENT is a Residential / Group Housing project by C B CONSTRUCTION in Nashik, Maharashtra, registered with MahaRERA as P51600045379 on 18 May 2022. The registration is recorded completed; possession was promised by 31 Mar 2026. 16 of the 20 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameNISHIGANDH APARTMENT
  • TypeResidential / Group Housing
  • Location
    • AMBAD MIDC ROAD
    • KAMATWADE
    • Nashik (M Corp.)
    • Nashik
    • 422008
  • Pincode422008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600045379
  • ReraGenie IDRG-MH-15526

Builder

  • NameC B CONSTRUCTION
  • Entity typePartnership
  • PartnerBHUSHAN BALKRUSHNA TALWARE

Key dates

this monthRegisteredMay 2022PromisedMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 May 2022
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Current status

80%16 of 20 units booked
118.5%Work done, per cost certificate

Figures as on 10 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NISHIGANDHA APARTMENTNA7520020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

NISHIGANDHA APARTMENT: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area639 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Oct 2025

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI1821.42
Proposed, not sanctioned1,809 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR KAPADIA AUTO SHOWROOM SHALIMAR NASHIK 422001
Estimated costRs 2.59 cr
Cost incurredRs 3.07 cr
Work done118.48%
BuildingWingEstimatedIncurred
NISHIGANDHA APARTMENTNARs 2.59 crRs 3.07 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDEEP YEOLA
ArchitectPOSITIVE DESIGN STUDIO
EngineerBHAVESH PATEL
EngineerCHETAN DILIP PATKAR
Chartered AccountantOSTWAL and CO
Chartered AccountantPRASAD YEOLA & CO.
Chartered AccountantOSTWAL AND COMPANY
PartnerRole in project
C B CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: Nishigandha Apt Commencement Certificate Corrected 04052022.pdf10 Oct 2025
Declaration and undertaking (Annexure A)File: Nishiggandh Declaration-Cum Undertaking 08_08_2025.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-1 AMJ-22.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-1 AMJ-22.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-1 AMJ-22.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-1 AMJ-22.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-2 JAS-22.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-2 JAS-22.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-2 JAS-22.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-2 JAS-22.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-3 OND-22.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-3 OND-22.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-3 OND-22.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-3 OND-22.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-4 JFM-23.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-4 JFM-23.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-4 JFM-23.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-4 JFM-23.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-5 AMJ-23.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-5 AMJ-23.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-5 AMJ-23.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-5 AMJ-23.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-6 JAS-23.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-6 JAS-23.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-6 JAS-23.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-6 JAS-23.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-7 OND-23.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-7 OND-23.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-7 OND-23.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-7 OND-23.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-8 JFM-24.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-8 JFM-24.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-8 JFM-24.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-8 JFM-24.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-9 AMJ-24.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-9 AMJ-24.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-9 AMJ-24.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-9 AMJ-24.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-10 JAS-24.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-10 JAS-24.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-10 JAS-24.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-10 JAS-24.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-11 OND-24.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-11 OND-24.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-11 OND-24.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-11 OND-24.pdf10 Oct 2025
Form 1File: Nishigandha Apartment Form 1 Q-12 JFM-25.pdf10 Oct 2025
Form 2File: Nishigandha Apartment Form 2 Q-12 JFM-25.pdf10 Oct 2025
Form 3File: Nishigandha Apartment Form 3 Q-12 JFM-25.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nishigandh Apartment Q-12 JFM-25.pdf10 Oct 2025
Withdrawal Update Form 1File: Nishigandha Apartment Form 1 Q-12 JFM-25.pdf10 Oct 2025
Withdrawal Update Form 1File: Nishigandha Apartment Form 1 Q-12 JFM-25.pdf10 Oct 2025
Withdrawal Update Form 2File: Nishigandha Apartment Form 2 Q-12 JFM-25.pdf10 Oct 2025
Withdrawal Update Form 2File: Nishigandha Apartment Form 2 Q-12 JFM-25.pdf10 Oct 2025
Withdrawal Update Form 3File: Nishigandha Apartment Form 3 Q-12 JAS-24.pdf10 Oct 2025
Withdrawal Update Form 3File: Nishigandha Apartment Form 3 Q-12 JAS-24.pdf10 Oct 2025
Form 2A (FY 2022-2023)File: Nishigandha Apartment Form 2A 30_04_2023.pdf10 Oct 2025
Form 2A (FY 2023-2024)File: Nishigandha Apartment Form 2A 30_04_2024.pdf10 Oct 2025
Form 2A (FY 2024-2025)File: Nishigandha Apartment Form 2A 30_04_2025.pdf10 Oct 2025
Form 2A (FY 2025-2026)File: Nishigandha Apartment Form 2A 30_04_2025.pdf10 Oct 2025
Form 5 (FY 2022-2023)File: Nishigandha Apartment Form 5 FY 22-23.pdf10 Oct 2025
Form 5 (FY 2023-2024)File: Nishigandha Apartment Form 5 FY 23-24.pdf10 Oct 2025
Form 5 (FY 2024-2025)File: Nishigandha Apartment Form 5 FY 24-25.pdf10 Oct 2025
Occupational CertificateFile: Nishigandha Apt_Full Occupancy Certificate.pdf10 Oct 2025
Declaration and undertaking (Annexure A)File: Nishiggandh Declaration-Cum Undertaking 08_08_2025.pdf8 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nishigandha Apt Form 1 12042023.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nishigandha Apt Form 2 12042023.pdf12 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nishigandha Apt Form 3 12042023.pdf12 Apr 2023
Layout approvalFile: Nishigandha Apt Layout Approved.pdf12 May 2022
Copy of Layout Approval (in case of layout)File: Nishigandha Apt Layout Approved.pdf12 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Nishigandha Apt Commencement Certificate Corrected 04052022.pdf12 May 2022
CERSAI detailsFile: Nishigandh Apt cersai_search_report_200235554738_for_asset_based_search_21_04_2022_16_10_321 Apr 2022
Building plan approvalFile: Nishigandha Apt IOD.pdf19 Apr 2022
PAN CardFile: C B Construction Firm PAN Card 12042022.pdf19 Apr 2022
Copy of the legal title reportFile: Nishigandha Apt Title Report N Receipt N Format A 12042022.pdf19 Apr 2022
Details of encumbrancesFile: Nishigandha Apt Self Declairation 12042022.pdf19 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Nishigandha Apt IOD.pdf19 Apr 2022
Declaration about Commencement CertificateFile: Nishigandha Apt Fromat D 12042022.pdf19 Apr 2022
Declaration in FORM BFile: Nishigandha Apt From B 12042022.pdf19 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nishigandha Apt From 3 12042022.pdf19 Apr 2022

How this compares with Nashik

80%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NISHIGANDH APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KAMATWADE4,100+ in Nashik

2 kmNISHIGANDH APARTMENTCompleted 43Lapsed / revoked 15Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: C B CONSTRUCTION

C B CONSTRUCTION has 1 registration on MahaRERA, including NISHIGANDH APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if NISHIGANDH APARTMENT is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NISHIGANDH APARTMENT?

The registered promoter entity is C B CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NISHIGANDH APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NISHIGANDH APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NISHIGANDH APARTMENT?

The professionals named in the filing: Architect: SANDEEP YEOLA; Architect: POSITIVE DESIGN STUDIO; Engineer: BHAVESH PATEL; Engineer: CHETAN DILIP PATKAR; Chartered Accountant: OSTWAL and CO; Chartered Accountant: PRASAD YEOLA & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NISHIGANDH APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NISHIGANDH APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NISHIGANDH APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.