ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / NIRVANAs JAGRUTI

Registered No litigation declared Residential / Group Housing project

NIRVANAs JAGRUTI

By Neeraj Rajesh Dayaramani

RG-MH-91472 · RERA P50500053523 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
147 of 231Construction stages doneacross 21 buildings; furthest along: Slabs of Super Structure, 75%
0 of 2Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 145 documents Report an error

NIRVANAs JAGRUTI is a Residential / Group Housing project by Neeraj Rajesh Dayaramani in Nagpur, Maharashtra, registered with MahaRERA as P50500053523 on 10 Nov 2023. Possession is promised by 31 Dec 2027. 2 of the 2 units on this registration are recorded sold or booked, and 147 of 231 construction stages are filed complete.

At a glance

Project

  • NameNIRVANAs JAGRUTI
  • TypeResidential / Group Housing
  • Location
    • Plot No. 1-7
    • 9-12
    • 14-17
    • 20-25
    • Kh. No. 158/1(Part) & Kh. No. 158/2(Part)
    • Mouza - Bhilgaon
    • Tah. - Kamptee
    • Distt. - Nagpur
    • Bhilgaon
    • Kamptee Road
    • ...
  • Pincode440026
  • RERA no.P50500053523
  • ReraGenie IDRG-MH-91472

Builder

  • NameNeeraj Rajesh Dayaramani
  • Entity typeIndividual

Key dates

this monthRegisteredNov 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Nov 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings21 building records
  • Documents filed145 files

Current status

100%2 of 2 units booked
171.2%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Plot No 1NA22202
Plot No 2NA22000
Plot No 3NA22000
Plot No 4NA22000
Plot No 5NA22000
Plot No 6NA22000
Plot No 7NA22000
Plot No 9NA32000
Plot No 10NA33000
Plot No 11NA33000
Plot No 12NA33000
Plot No 14NA33000
Plot No 15NA33000
Plot No 16NA33000
Plot No 17NA33000
Plot No 20NA22000
Plot No 21NA22000
Plot No 22NA22000
Plot N0 23NA22000
Plot No 24NA22000
Plot No 25NA22000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 21 buildings; the table lists the first 20.

147 of 231 construction stages are filed complete across 21 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

Plot No 148%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Plot No 248%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Plot No 344%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Plot No 445%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Plot No 544%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Plot No 644%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Plot No 744%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Plot No 982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot No 1082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot No 1182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot No 1282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot No 1482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot No 1582%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot No 1682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot No 1782%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot No 2082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot No 2182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot No 2282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot N0 2382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Plot No 2482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes70%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered21
BuildingClosed/CoveredTotal
Plot No 111
Plot No 211
Plot No 311
Plot No 411
Plot No 511
Plot No 611
Plot No 711
Plot No 911
Plot No 1011
Plot No 1111
Plot No 1211
Plot No 1411
Plot No 1511
Plot No 1611
Plot No 1711
Plot No 2011
Plot No 2111
Plot No 2211
Plot N0 2311
Plot No 2411
Plot No 2511

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,469 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jun 2025

Approvals and building plan

Sanctioning authorityNeeraj Rajesh Dayaramani
Permissible FSI3014.22
Proposed, not sanctioned3,014 sq m
Buildings approved21
Buildings sanctioned21

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJaripatka
Estimated costRs 21.01 cr
Cost incurredRs 35.97 cr
Work done171.23%
BuildingWingEstimatedIncurred
-NARs 10.50 crRs 17.99 cr
Plot No 1NARs 50.02 lakhRs 85.65 lakh
Plot No 2NARs 50.02 lakhRs 85.65 lakh
Plot No 3NARs 50.02 lakhRs 85.65 lakh
Plot No 4NARs 50.02 lakhRs 85.65 lakh
Plot No 5NARs 50.02 lakhRs 85.65 lakh
Plot No 6NARs 50.02 lakhRs 85.65 lakh
Plot No 7NARs 50.02 lakhRs 85.65 lakh
Plot No 9NARs 50.02 lakhRs 85.65 lakh
Plot No 10NARs 50.02 lakhRs 85.65 lakh
Plot No 11NARs 50.02 lakhRs 85.65 lakh
Plot No 12NARs 50.02 lakhRs 85.65 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch Satyendra Gupta Gupta
EngineerAshish Soni Soni
Chartered AccountantRishi Lashkare Lashkare
Chartered AccountantCA Ravindra Lashkare
PartnerRole in project
Neeraj Rajesh Dayaramani-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed145

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate March 2026...pdf18 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate March 2026.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate March 2026.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Dec 2025 Nirvana Jagruti (2)_compressed.pdf21 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Dec 2025 Nirvana Jagruti (2)_compressed.pdf21 Feb 2026
Withdrawal Update Form 3File: FORM - 3 CA Certificate - December 2025 - Nirvana Jagruti (2)_compressed.pdf21 Feb 2026
Withdrawal Update Form 1File: Satendra Architech Certificate.pdf11 Nov 2025
Withdrawal Update Form 2File: Ashish Soni Engg Certificate.pdf11 Nov 2025
Withdrawal Update Form 3File: Nirvanau0027s Jagruti - Form 3 - September 2025_compressed.pdf11 Nov 2025
Withdrawal Update Form 1File: Nirvana Jagruti - Form 1 - June 2025_compressed.pdf22 Aug 2025
Withdrawal Update Form 1File: Nirvana Jagruti - Form 1 - June 2025_compressed.pdf22 Aug 2025
Withdrawal Update Form 2File: Form 2 - June 2025.pdf22 Aug 2025
Withdrawal Update Form 2File: Form 2 - June 2025.pdf22 Aug 2025
Withdrawal Update Form 3File: Nirvana Jagruti - Form 3 - June 2025_compressed.pdf22 Aug 2025
Withdrawal Update Form 3File: Nirvana Jagruti - Form 3 - June 2025_compressed.pdf22 Aug 2025
Form 1File: Form 1 - Nirvana Jagruti_compressed.pdf16 Jun 2025
Form 2File: Form 2 - Nirvana Jagruti.pdf16 Jun 2025
Form 3File: Nirvana Jagruti CA Certificate_compressed.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Nirvana Jagruti.pdf16 Jun 2025
Form 1File: Architect Certificate_compressed.pdf16 Jun 2025
Form 2File: Engineer Ceritificate.pdf16 Jun 2025
Form 3File: Nirvana Jagruti - Form 3 - December 2024_compressed.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Nirvana Jagruti - Disclosure - December 2024.pdf16 Jun 2025
Form 1File: FORM 1 - SEPT 2024_compressed.pdf16 Jun 2025
Form 2File: Engineer Certificate.pdf16 Jun 2025
Form 3File: FORM 3 - SEPT 2024_compressed.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - SEPT 2024.pdf16 Jun 2025
Form 1File: Architect Certificate - June 2024 (2)_compressed (1).pdf16 Jun 2025
Form 2File: Engineer Certificate - June 2024 (2).pdf16 Jun 2025
Form 3File: CA CErtificate - June 2024 (2)_compressed.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - June 2024 (2).pdf16 Jun 2025
Form 1File: Architect Certificate - March 2024_compressed.pdf16 Jun 2025
Form 2File: Engineer Certificate - March 2024.pdf16 Jun 2025
Form 3File: CA Certificate - March 2024_compressed.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - March 2024.pdf16 Jun 2025
Form 1File: Nirvana Jagruti - Architect - Dec 2023_compressed (1).pdf16 Jun 2025
Form 2File: Nirvana Jagruti - Engineer - Dec 2023.pdf16 Jun 2025
Form 3File: Nirvana Jagruti - CA Cert - June 2023.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Nirvana Jagruti - Disclosure - Dec 2023.pdf16 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nirvana Jagruti_compressed.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nirvana Jagruti CA Certificate_compressed.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nirvana Jagruti.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Nirvana Jagruti.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SEPT 2024_compressed 1_compressed (1).pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SEPT 2024_compressed.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nirvana Jagruti - Form 3 - December 2024_compressed.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ceritificate.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Nirvana Jagruti - Disclosure - December 2024.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SEPT 2024_compressed.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - SEPT 2024_compressed.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - SEPT 2024.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - June 2024 (2)_compressed (1).pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - June 2024 (2).pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure - June 2024 (2).pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CErtificate - June 2024 (2)_compressed.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - March 2024_compressed.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - March 2024.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold - March 2024.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - March 2024_compressed.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nirvana Jagruti - Architect - Dec 2023_compressed (1).pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nirvana Jagruti - Engineer - Dec 2023.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Nirvana Jagruti - Disclosure - Dec 2023.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nirvana Jagruti - CA Cert - June 2023.pdf16 Jan 2024
Building plan approvalFile: Plot No - 1 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 2 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 3 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 4 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 5 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 6 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 7 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 9 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 10 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 11 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 12 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 14 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 15 - Sanction Plan.pdf8 Nov 2023
Building plan approvalFile: Plot No - 16 - Sanction Plan.pdf8 Nov 2023

How this compares with Nagpur

100%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIRVANAs JAGRUTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhilgaon, Kamptee Road, Nagpur2,800+ in Nagpur

Builder: Neeraj Rajesh Dayaramani

Neeraj Rajesh Dayaramani has 1 registration on MahaRERA, including NIRVANAs JAGRUTI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if NIRVANAs JAGRUTI is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIRVANAs JAGRUTI?

The registered promoter entity is Neeraj Rajesh Dayaramani, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIRVANAs JAGRUTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIRVANAs JAGRUTI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIRVANAs JAGRUTI?

The professionals named in the filing: Architect: Arch Satyendra Gupta Gupta; Engineer: Ashish Soni Soni; Chartered Accountant: Rishi Lashkare Lashkare; Chartered Accountant: CA Ravindra Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIRVANAs JAGRUTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIRVANAs JAGRUTI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIRVANAs JAGRUTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.