ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / NIRMITI RESIDENCY WING C AND D

Completed No litigation declared Others project

NIRMITI RESIDENCY WING C AND D

By SWASTIVASTU DEVELOPERS LLP

RG-MH-17330 · RERA P53100028586 · Last updated on MahaRERA portal: 29 Mar 2026

Source: official MahaRERA filing

Red flags

  • Rs 1.00 crore secured on the land, in favour of Veeracharya Babasaheb Kuchnure Jilha Nagari Sahakari Patsanstha Maryadit
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Aug 2025Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
7 of 66Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 36 documents Report an error

NIRMITI RESIDENCY WING C AND D is a Others project by SWASTIVASTU DEVELOPERS LLP in Sangli, Maharashtra, registered with MahaRERA as P53100028586 on 23 Mar 2021. The registration is recorded completed; possession was promised by 2 Aug 2025. 59 of the 66 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameNIRMITI RESIDENCY WING C AND D
  • TypeOthers
  • Location
    • SANJAYNAGAR POILCE STATION ROAD
    • CHINTAMANINAGAR
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100028586
  • ReraGenie IDRG-MH-17330

Builder

  • NameSWASTIVASTU DEVELOPERS LLP
  • Entity typePartnership
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2021PromisedAug 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Mar 2021
  • Promised completion2 Aug 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed36 files

Current status

89%59 of 66 units booked
100.0%Work done, per cost certificate

Figures as on 29 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA11728533
WING DNA11728533

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

WING C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,002 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofVeeracharya Babasaheb Kuchnure Jilha Nagari Sahakari Patsanstha Maryadit
Secured amountRs 1.00 crore
CERSAI search filedYes
Declared on15 Jan 2026
LandownerVillageDistrict
NIRMALA SHITAL PATILSangli Miraj Kupwad (M Corp.)Sangli
NIRMALA S PATILSangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Sanctioning authoritySANGLI MIRAJ KUPWAD MUNICIPAL CORPORATION
Permissible FSI4090.41
Proposed, not sanctioned3,945 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAJWADA CHOWK SANGLI
Estimated costRs 8.12 cr
Cost incurredRs 8.12 cr
Work done100.0%
BuildingWingEstimatedIncurred
WING CNARs 4.06 crRs 4.06 cr
WING DNARs 4.06 crRs 4.06 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN G KANOJE
EngineerPRANAV KULKARNI
EngineerVRUSHABH B BARGALE
Chartered AccountantS R NILKANTH
Chartered AccountantDNYANESHWAR R AROTE
PartnerRole in project
SWASTIVASTU DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed36

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC COMPLITION and MAIL VERIFICATION SS CERTIFICATE WING C and D.pdf29 Mar 2026
Withdrawal Update Form 1File: FORM-1 30-06-2025 .pdf27 Feb 2026
Withdrawal Update Form 1File: FORM-1 30-09-25.pdf27 Feb 2026
Withdrawal Update Form 2File: FORM-2 30-06-2025.pdf27 Feb 2026
Withdrawal Update Form 2File: FORM-2-30-09-2025.pdf27 Feb 2026
Withdrawal Update Form 3File: FORM-3 30-06-2025.pdf27 Feb 2026
Withdrawal Update Form 3File: FORM-3 30-09-2025.pdf27 Feb 2026
Form 1File: FORM-1 31-12-24.pdf15 Jan 2026
Form 2File: FORM-2 31-12-24.pdf15 Jan 2026
Form 3File: FORM-3 31-12-24.pdf15 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-12-24.pdf15 Jan 2026
Form 1File: FORM-1 31-3-25.pdf15 Jan 2026
Form 2File: FORM-2 31-3-25.pdf15 Jan 2026
Form 3File: FORM-3 31-3-25.pdf15 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 31-3-25.pdf15 Jan 2026
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 NIRMITI PRIDE C AND D.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Nirmiti RESI 2020-2021.pdf27 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 nirmiti RESI 2021-2022.pdf27 May 2023
Disclosure of sold/ booked inventoryFile: Nirmiti residency SOLD INVENTORY.pdf26 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 5.pdf7 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate 5.pdf7 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate.pdf7 Feb 2022
Details of encumbrancesFile: img20210810_17572790.pdf10 Aug 2021
PAN CardFile: pan card firm-min.pdf8 Mar 2021
Layout approvalFile: nakasha.pdf3 Mar 2021
Building plan approvalFile: dwg.pdf3 Mar 2021
Building plan approvalFile: DWG 1.pdf3 Mar 2021
Copy of the legal title reportFile: search report.pdf3 Mar 2021
Details of encumbrancesFile: certificate.pdf3 Mar 2021
Copy of Layout Approval (in case of layout)File: nakasha.pdf3 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: dwg.pdf3 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: DWG 1.pdf3 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: building permission.pdf3 Mar 2021
Declaration in FORM BFile: form b.pdf3 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf3 Mar 2021
Proforma of Allotment letterFile: letter of allotment.pdf3 Mar 2021

How this compares with Sangli

89%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep NIRMITI RESIDENCY WING C AND D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHINTAMANINAGAR790+ in Sangli

2 kmNIRMITI RESIDENCY WING CCompleted 21Lapsed / revoked 16Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: SWASTIVASTU DEVELOPERS LLP

SWASTIVASTU DEVELOPERS LLP has 5 registrations on MahaRERA, including NIRMITI RESIDENCY WING C AND D and NIRMITI ELITE 14. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if NIRMITI RESIDENCY WING C AND D is delayed beyond 2 Aug 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIRMITI RESIDENCY WING C AND D?

The registered promoter entity is SWASTIVASTU DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIRMITI RESIDENCY WING C AND D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIRMITI RESIDENCY WING C AND D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIRMITI RESIDENCY WING C AND D?

The professionals named in the filing: Architect: SACHIN G KANOJE; Engineer: PRANAV KULKARNI; Engineer: VRUSHABH B BARGALE; Chartered Accountant: S R NILKANTH; Chartered Accountant: DNYANESHWAR R AROTE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIRMITI RESIDENCY WING C AND D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIRMITI RESIDENCY WING C AND D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIRMITI RESIDENCY WING C AND D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.